NUECES SH 286 (0326-03-109)

Items: 53

County: NUECES
Length: 0.0000 MILES
Highway: SH 286
District: CORPUS CHRISTI
Control Number: 0326-03-109
DBE Goal: 0.0%
Project: F 2026(264)
Guaranty: $23,000.00
Time: 92 WORKING DAYS
Engineer's Estimate: $1,154,987.00
Date: 01/07/2026 (5 months ago)
Contract Number: 1263217
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00207865
Contract Type: Federal
Project Description: ADA REMEDIATION ON WEST SIDE OF SH 286
Mail/Deliver Bids To: N/A
RICARDO BRAVO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,154,987.00
1
$908,354.05
Over/Under Est: -21.35% -$246,632.95
Over/Under Est: -16.06% -$185,487.79
Amt Left: 6.73% $61,145.16
Over/Under Est: -13.7% -$158,289.79
Amt Left: 9.73% $88,343.16
Delta: -2.81% -$27,198.00
Over/Under Est: -1.97% -$22,756.05
Amt Left: 24.65% $223,876.90
Delta: -13.60% -$135,533.74
$1,212,913.35
Over/Under Est: 5.02% $57,926.35
Amt Left: 33.53% $304,559.30
Delta: -7.13% -$80,682.40
Subcontractor Percentage Amount
TRAF-TEX, INC. 6.12% $55,591.27
HIGHWAY BARRICADES AND SERVICES, LLC 5.05% $45,871.88
LINEAR TRAFFIC MARKINGS LLC 1.18% $10,718.58
Total: 12.35% $112,181.73

Bid Items & Bid Tabulations

53 Total 0 of 53
NUECES  |  SH 286  |  CORPUS CHRISTI  |  0326-03-109  |  01/07/2026  |  $1,154,987.00  |  F 2026(264)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  92 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
3LW CIVIL LLC
TI-ZACK CONCRETE, LLC
MAKO CONTRACTING, LLC
LUCANIA CONTRACTORS LLC
STX CIVIL
PREP ROW (TREE PRUNE AND TRIM)
STA 3.000 $5,000.000 $500.000 $165.000 $1,000.000 $1,500.000 $8,000.000
REMOV CONC (DRIVEWAYS)
SY 1,485.000 $23.000 $27.690 $30.710 $25.000 $20.000 $18.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 238.000 $20.000 $27.690 $29.700 $25.000 $20.000 $15.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 66.000 $16.000 $23.080 $21.420 $8.000 $10.000 $8.000
REMOV CONC (MISC)
SY 13.000 $20.000 $30.000 $54.370 $50.000 $30.000 $18.000
EXCAV (SPECIAL)
CY 150.000 $30.000 $32.310 $47.120 $25.000 $50.000 $35.000
EMBANK (FNL)(OC)(TY B)
CY 150.000 $45.000 $32.310 $47.120 $50.000 $50.000 $100.000
BLOCK SODDING
SY 2,869.000 $10.000 $6.920 $5.500 $10.000 $8.000 $6.000
VEGETATIVE WATERING
TGL 53.700 $30.000 $0.010 $1.100 $50.000 $10.000 $25.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 20.000 $500.000 $250.000 $247.500 $600.000 $150.000 $300.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 100.000 $5.000 $6.270 $13.200 $20.000 $23.000 $10.000
CUT & RESTORE ASPH PAVING
SY 456.000 $125.000 $150.000 $115.500 $110.000 $175.000 $240.000
RIPRAP (CONC)(4 IN)
CY 2.600 $700.000 $784.620 $845.860 $700.000 $1,000.000 $1,000.000
ADJUSTING MANHOLES
EA 7.000 $1,500.000 $1,500.000 $504.860 $2,500.000 $1,300.000 $1,200.000
ADJUSTING INLETS
EA 1.000 $4,400.000 $1,750.000 $3,534.000 $2,500.000 $1,300.000 $1,000.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 9.000 $400.000 $692.310 $392.670 $1,000.000 $1,180.000 $1,000.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 6.000 $1,500.000 $461.540 $589.000 $1,000.000 $800.000 $600.000
ADJUSTING MANHOLES (UTILITY VALVE)
EA 4.000 $2,000.000 $692.310 $1,413.600 $1,000.000 $500.000 $600.000
MOBILIZATION
LS 1.000 $75,000.000 $50,000.000 $81,122.910 $50,000.000 $110,000.000 $95,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $7,000.000 $1,650.000 $2,750.000 $2,750.000 $3,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $1,500.000 $1.100 $5,000.000 $10,000.000 $50.000
TMA (STATIONARY)
DAY 92.000 $200.000 $1.000 $1.100 $200.000 $300.000 $120.000
TMA (MOBILE OPERATION)
HR 16.000 $250.000 $1.000 $1.100 $300.000 $1.000 $40.000
CONSTRUCTION PERIMETER FENCE
LF 4,000.000 $4.000 $0.010 $0.110 $6.000 $10.000 $3.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,507.000 $3.000 $0.010 $0.110 $4.250 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,507.000 $2.500 $0.010 $0.110 $1.000 $1.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 304.000 $8.000 $0.010 $0.110 $9.000 $10.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 304.000 $2.500 $0.010 $0.110 $2.000 $2.000 $2.000
CONC CURB (TY II)
LF 24.000 $30.000 $45.000 $60.560 $30.000 $25.000 $40.000
CONC CURB & GUTTER (TY II)
LF 156.000 $50.000 $50.000 $60.560 $40.000 $35.000 $45.000
DRIVEWAYS (CONC)
SY 1,485.000 $100.000 $102.000 $107.970 $100.000 $95.000 $115.000
CONC SIDEWALKS (4")
SY 4,147.000 $80.000 $69.000 $85.070 $76.500 $90.000 $85.000
CURB RAMPS - ALL
EA 51.000 $3,027.500 $1,846.150 $2,070.780 $2,200.000 $2,100.000 $3,250.000
CONDT (PVC) (SCH 40) (2")
LF 150.000 $23.000 $24.150 $20.030 $14.400 $15.000 $32.000
ELEC CONDR (NO.8) BARE
LF 50.000 $2.500 $2.070 $3.080 $2.340 $2.500 $6.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $700.000 $1,170.000 $495.000 $1,170.000 $1,100.000 $950.000
RELOCATE SM RD SN SUP&AM TY S80
EA 10.000 $800.000 $1,080.000 $495.000 $1,080.000 $500.000 $925.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,209.000 $12.000 $7.760 $6.600 $8.100 $8.500 $10.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $200.000 $195.500 $165.000 $204.000 $212.000 $250.000
PAVEMENT SLER 24"
LF 1,209.000 $4.000 $0.460 $1.100 $0.480 $0.500 $1.100
ELIM EXT PM & MRKS (8")
LF 1,449.000 $4.000 $0.350 $1.100 $0.360 $0.400 $1.750
ELIM EXT PM & MRKS (24")
LF 243.000 $4.000 $2.300 $3.300 $2.400 $2.500 $3.900
PAV SURF PREP FOR MRK (24")
LF 1,209.000 $15.000 $0.580 $2.200 $0.600 $0.650 $0.500
INSTALL HWY TRF SIG (UPGRADE)
EA 2.000 $10,000.000 $4,664.400 $2,971.330 $3,910.000 $4,250.000 $5,400.000
PED SIG SEC (LED)(COUNTDOWN)
EA 3.000 $2,500.000 $914.250 $854.270 $741.750 $800.000 $1,600.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,950.000 $4.000 $3.010 $3.150 $1.610 $1.750 $5.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 600.000 $4.000 $3.510 $3.750 $2.070 $2.250 $10.000
PED POLE ASSEMBLY
EA 4.000 $2,300.000 $4,713.850 $4,316.360 $2,587.500 $2,850.000 $4,000.000
REMOVE PED POLE ASSEMBLY
EA 2.000 $1,400.000 $871.130 $1,114.980 $977.500 $1,100.000 $1,400.000
PED DETECT PUSH BUTTON (APS)
EA 5.000 $2,000.000 $1,439.800 $364.030 $1,063.750 $1,200.000 $1,000.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 2.000 $200.000 $246.560 $557.470 $97.750 $105.000 $100.000
GROUND BOX (ADJUST)
EA 4.000 $1,000.000 $1,035.000 $1,076.990 $655.500 $700.000 $2,300.000
GROUND BOX W/ APRON (ADJUST)
EA 7.000 $1,000.000 $1,107.450 $1,810.000 $862.500 $950.000 $2,300.000
Totals: $1,154,987.000 $908,354.049 $969,499.206 $996,697.210 $1,132,230.950 $1,212,913.350