NUECES US 77 (0102-03-087)

Items: 174

County: NUECES
Length: N/A
Highway: US 77
District: CORPUS CHRISTI
Control Number: 0102-03-087
DBE Goal: N/A
Project: C 102-3-87
Guaranty: N/A
Time: 219 WORKING DAYS
Engineer's Estimate: $7,927,833.29
Date: 12/02/2020 (5 years ago)
Contract Number: N/A
Type: CONSTRUCTION EXIT & ENTRANCE RAMPS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$7,927,833.29
$7,712,829.03
Over/Under Est: -2.71% -$215,004.26
Over/Under Est: 12.69% $1,005,960.11
Amt Left: 15.83% $1,220,964.37
$9,281,332.35
Over/Under Est: 17.07% $1,353,499.06
Amt Left: 20.34% $1,568,503.32
Delta: -3.89% -$347,538.95
Over/Under Est: 27.66% $2,192,827.30
Amt Left: 31.22% $2,407,831.56
Delta: -9.04% -$839,328.24

Bid Items & Bid Tabulations

174 Total 0 of 174
NUECES  |  US 77  |  CORPUS CHRISTI  |  0102-03-087  |  12/02/2020  |  $7,927,833.29  |  C 102-3-87  |  CONSTRUCTION EXIT & ENTRANCE RAMPS  |  219 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HAAS-ANDERSON CONSTRUCTION, LTD.
TIERRA LEASE SERVICE, LLC
BAY LTD.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 64.000 $210.130 $572.000 $450.000 $1,500.000 $890.930
REMOVING CONC (RIPRAP)
SY 695.000 $15.000 $8.800 $22.000 $20.000 $18.750
EXCAVATION (ROADWAY)
CY 8,365.200 $12.000 $5.600 $11.000 $17.000 $18.810
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,668.100 $7.000 $5.600 $20.000 $7.000 $5.800
BACKFILL (TY A OR B)
STA 152.000 $150.000 $247.000 $100.000 $270.000 $180.680
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 7.900 $1,500.000 $547.000 $2,200.000 $560.000 $1,877.030
FERTILIZER
TON 1.500 $900.000 $1,860.000 $1,350.000 $1,900.000 $1,056.270
VEGETATIVE WATERING
MG 615.000 $25.000 $33.000 $25.000 $30.000 $21.680
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 6,901.000 $70.000 $75.000 $82.000 $87.000 $72.710
LIME (HYDRATED LIME (SLURRY))
TON 476.000 $215.000 $169.000 $250.000 $270.000 $184.800
LIME TRT (SUBGRADE)(8")
SY 23,991.000 $5.000 $5.200 $2.500 $7.000 $3.310
PRIME COAT (MC-30)
GAL 4,437.000 $5.000 $3.550 $4.000 $6.000 $4.340
ASPH (MULTI OPTION)
GAL 48,914.000 $3.000 $2.000 $2.750 $3.000 $4.040
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 1,270.000 $105.000 $120.000 $90.000 $150.000 $113.840
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 8,460.000 $130.000 $133.000 $155.000 $140.000 $180.530
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 1,988.000 $26.000 $42.000 $50.000 $55.000 $47.780
PLANE ASPH CONC PAV(0" TO 2")
SY 118,757.000 $3.000 $1.550 $1.000 $2.000 $1.100
STRUCT EXCAV (PIPE)
CY 5.000 $10.000 $116.000 $50.000 $770.000 $848.140
CEM STABIL BKFL
CY 146.800 $75.000 $52.000 $160.000 $100.000 $98.880
CUT & RESTORING PAV
SY 79.000 $175.000 $164.000 $160.000 $420.000 $122.760
CEMENT STAB BACKFILL (INLET OR MH)
CY 196.000 $68.000 $52.000 $200.000 $100.000 $145.200
FLOWABLE BACKFILL
CY 6.700 $300.000 $348.000 $500.000 $880.000 $395.510
TRENCH EXCAVATION PROTECTION
LF 10.000 $25.000 $58.000 $100.000 $450.000 $437.000
PRESTR CONC PIL (16 IN SQ)
LF 670.000 $130.000 $236.000 $160.000 $180.000 $252.400
PRESTR CONC PIL (20 IN SQ)
LF 275.000 $150.000 $318.000 $200.000 $230.000 $238.060
DRILL SHAFT (48 IN)
LF 27.000 $400.000 $322.000 $675.000 $640.000 $692.900
DRILL SHAFT (SIGN MTS) (24 IN)
LF 20.000 $325.000 $133.000 $205.000 $240.000 $214.380
DRILL SHAFT (SIGN MTS) (48 IN)
LF 45.000 $575.000 $888.000 $550.000 $630.000 $573.920
DRILL SHAFT (SIGN MTS) (54 IN)
LF 165.000 $575.000 $943.000 $625.000 $730.000 $638.650
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 240.000 $275.000 $205.000 $250.000 $150.000 $242.450
CL C CONC (ABUT)(EXTEND)
CY 55.200 $1,420.000 $1,340.000 $1,500.000 $2,200.000 $1,177.710
CL C CONC (CAP)(EXTEND)
CY 18.000 $2,350.000 $1,340.000 $1,675.000 $2,700.000 $1,003.840
CL C CONC (RAIL FOUNDATION)
CY 86.000 $700.000 $717.000 $575.000 $770.000 $785.420
REINF CONC SLAB (EXTEND SLAB)
SF 6,750.000 $35.000 $22.000 $42.000 $80.000 $32.050
APPROACH SLAB (EXTEND)
CY 36.200 $575.000 $1,190.000 $800.000 $1,000.000 $659.400
PRESTR CONC GIRDER (TX40)
LF 745.000 $125.000 $192.000 $150.000 $230.000 $183.150
RIPRAP (CONC)(4 IN)
CY 73.000 $550.000 $533.000 $480.000 $650.000 $619.160
RIPRAP (CONC)(5 IN)
CY 499.000 $450.000 $475.000 $500.000 $550.000 $613.840
RIPRAP (CONC)(6 IN)
CY 280.000 $525.000 $518.000 $525.000 $570.000 $646.050
RIPRAP (CONC)(CL B)
CY 11.400 $1,200.000 $969.000 $475.000 $1,100.000 $734.170
RIPRAP (MOW STRIP)(4 IN)
CY 59.000 $550.000 $528.000 $650.000 $740.000 $566.780
RAIL (TY SSTR)
LF 926.000 $80.000 $92.000 $85.000 $100.000 $98.850
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 88.000 $95.000 $140.000 $200.000 $250.000 $278.900
CONC BOX CULV (4 FT X 2 FT)
LF 52.000 $250.000 $256.000 $550.000 $690.000 $508.060
RC PIPE (CL III)(18 IN)
LF 359.000 $70.000 $91.000 $100.000 $110.000 $101.540
RC PIPE (CL III)(36 IN)
LF 16.000 $200.000 $227.000 $250.000 $550.000 $342.640
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 1.000 $5,500.000 $12,000.000 $5,000.000 $10,300.000 $8,674.310
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX3FT)
EA 1.000 $3,580.000 $4,590.000 $6,000.000 $8,800.000 $7,328.350
JCT BOX (COMPL)(SPL)
EA 2.000 $12,400.000 $1,550.000 $7,000.000 $21,000.000 $13,230.950
SET (TY I)(S= 4 FT)(HW= 2 FT)(3:1) (C)
EA 2.000 $8,500.000 $6,790.000 $13,000.000 $9,025.000 $17,479.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,200.000 $1,180.000 $2,200.000 $4,800.000 $1,536.690
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 3.000 $4,000.000 $1,210.000 $2,400.000 $4,900.000 $1,167.340
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,015.000 $1,370.000 $2,450.000 $5,100.000 $1,386.790
ADJUSTING MANHOLES
EA 1.000 $1,800.000 $1,550.000 $2,500.000 $1,750.000 $2,438.900
ADJUSTING INLETS
EA 1.000 $1,400.000 $1,550.000 $3,000.000 $1,500.000 $2,704.900
REMOV STR (SET)
EA 3.000 $2,500.000 $118.000 $325.000 $750.000 $2,198.630
REMOV STR (PIPE)
LF 41.000 $15.000 $4.850 $10.000 $20.000 $147.910
MOBILIZATION
LS 1.000 $580,000.000 $638,000.000 $600,000.000 $160,000.000 $1,045,549.500
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $7,000.000 $2,290.000 $10,000.000 $12,750.000 $1,873.950
ROCK FILTER DAMS (INSTALL) (TY 3)
CY 105.000 $20.000 $92.000 $75.000 $95.000 $133.030
ROCK FILTER DAMS (REMOVE)
CY 105.000 $20.000 $58.000 $30.000 $60.000 $61.530
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $22.000 $24.000 $30.000 $23.000 $20.280
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $8.000 $6.900 $7.000 $12.000 $13.680
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,287.000 $5.000 $2.750 $4.000 $6.000 $4.210
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,287.000 $2.500 $0.600 $3.000 $1.000 $2.280
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $6.000 $5.700 $7.000 $19.000 $9.340
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $1.000 $1.200 $2.000 $1.000 $4.940
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,720.000 $27.000 $16.000 $55.000 $7.000 $95.720
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 3,640.000 $27.000 $22.000 $41.000 $15.000 $76.730
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $22.000 $22.000 $75.000 $15.000 $121.750
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 4,740.000 $10.000 $11.000 $11.000 $9.000 $9.230
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,120.000 $4.500 $9.600 $8.500 $9.000 $10.620
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 160.000 $15.000 $9.600 $60.000 $9.000 $33.480
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 3,720.000 $20.000 $17.000 $12.000 $12.000 $11.760
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 3,640.000 $9.000 $11.000 $9.000 $11.000 $12.010
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $19.000 $11.000 $45.000 $11.000 $56.580
DRIVEWAYS (ACP)
SY 66.000 $50.000 $99.000 $40.000 $110.000 $173.720
RUMBLE STRIPS (SHOULDER)
LF 16,718.000 $0.140 $0.450 $0.550 $1.000 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $25.000 $21.000 $27.000 $25.000 $21.210
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $1,820.000 $2,700.000 $2,300.000 $1,911.660
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,900.000 $1,400.000 $2,200.000 $1,500.000 $1,417.310
REMOVE METAL BEAM GUARD FENCE
LF 775.000 $3.750 $2.250 $2.250 $3.000 $2.350
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $270.000 $161.000 $300.000 $310.000 $181.030
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $1,700.000 $161.000 $300.000 $160.000 $181.030
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $150.000 $161.000 $300.000 $360.000 $213.330
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,700.000 $2,710.000 $3,250.000 $3,300.000 $2,723.190
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,163.000 $905.000 $1,800.000 $5,500.000 $950.330
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,000.000 $771.000 $1,000.000 $1,100.000 $818.330
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 3.000 $25,000.000 $22,600.000 $26,000.000 $31,800.000 $21,601.390
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,925.000 $7,730.000 $7,500.000 $12,000.000 $7,715.330
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 11.000 $4,000.000 $3,090.000 $3,024.000 $3,800.000 $3,089.790
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 19.000 $3,400.000 $4,050.000 $3,132.000 $4,100.000 $3,195.670
CONDT (PVC) (SCH 40) (2")
LF 5,390.000 $10.000 $7.200 $10.800 $12.000 $11.020
CONDT (PVC) (SCH 40) (3")
LF 15,134.000 $10.000 $7.750 $11.880 $26.000 $12.110
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,032.000 $25.000 $15.000 $43.200 $18.000 $44.100
CONDT (PVC) (SCH 80) (3")
LF 30.000 $17.000 $14.000 $55.080 $23.000 $59.690
CONDT (PVC) (SCH 80) (3") (BORE)
LF 7,950.000 $25.000 $22.000 $33.480 $25.000 $34.110
CONDT (RM) (3")
LF 670.000 $45.000 $44.000 $76.680 $83.000 $101.510
ELEC CONDR (NO.14) INSULATED
LF 12,047.000 $1.200 $0.700 $0.970 $1.000 $1.000
ELEC CONDR (NO.8) BARE
LF 2,590.000 $1.500 $1.200 $1.240 $1.000 $1.310
ELEC CONDR (NO.8) INSULATED
LF 5,180.000 $1.250 $1.650 $1.190 $1.000 $1.230
ELEC CONDR (NO.6) BARE
LF 6,277.000 $1.700 $1.050 $1.510 $1.000 $1.560
ELEC CONDR (NO.6) INSULATED
LF 12,554.000 $1.850 $1.450 $1.510 $2.000 $1.550
GROUND BOX TY A (122311)W/APRON
EA 17.000 $950.000 $1,140.000 $864.000 $790.000 $886.330
REMOVE GROUND BOX
EA 4.000 $250.000 $266.000 $118.800 $330.000 $147.910
REMOVE ELECTRICAL SERVICES
EA 1.000 $500.000 $533.000 $540.000 $1,400.000 $657.660
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
EA 1.000 $7,000.000 $7,100.000 $8,208.000 $8,900.000 $8,467.660
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 2.000 $6,000.000 $8,440.000 $7,452.000 $7,900.000 $7,643.830
ELC SRV TY D 120/240 060(NS)SS(N)GC(U)
EA 1.000 $6,000.000 $7,770.000 $5,724.000 $7,900.000 $5,937.660
ALUMINUM SIGNS (TY G)
SF 63.250 $30.000 $24.000 $36.720 $33.000 $39.100
ALUMINUM SIGNS (TY O)
SF 985.000 $27.000 $37.000 $24.840 $26.000 $25.410
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 6.000 $550.000 $566.000 $550.800 $640.000 $578.940
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 26.000 $850.000 $660.000 $642.600 $750.000 $658.640
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,000.000 $1,290.000 $1,258.200 $1,500.000 $1,317.390
REMOVE SM RD SN SUP&AM
EA 16.000 $85.000 $89.000 $86.400 $100.000 $94.730
INSTALL LRSS (STRUCT STEEL)
LB 419.000 $6.000 $6.100 $4.700 $8.000 $5.040
REMOVE LRSA
EA 4.000 $1,200.000 $1,110.000 $572.400 $2,600.000 $609.910
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $30,000.000 $32,500.000 $24,300.000 $27,200.000 $24,857.660
INS OH SN SUP(30 FT CANT)
EA 2.000 $25,000.000 $25,500.000 $20,952.000 $25,000.000 $21,393.830
INS OH SN SUP(35 FT CANT)
EA 3.000 $22,000.000 $29,300.000 $21,708.000 $25,400.000 $22,145.890
INS OH SN SUP(40 FT CANT)
EA 1.000 $27,000.000 $30,300.000 $23,544.000 $27,300.000 $24,087.660
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 11.000 $75.000 $78.000 $75.600 $88.000 $86.790
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 9.000 $17.200 $28.000 $27.000 $31.000 $39.460
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 18.000 $26.250 $24.000 $23.760 $28.000 $30.180
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 65.000 $85.000 $72.000 $70.200 $82.000 $73.160
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 3.000 $28.200 $31.000 $30.240 $35.000 $66.690
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 3,173.000 $0.300 $0.350 $0.320 $1.000 $0.360
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 22,491.000 $0.300 $0.300 $0.300 $1.000 $0.310
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000 $58.000 $56.000 $54.000 $63.000 $72.940
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 2.000 $115.000 $139.000 $135.000 $160.000 $191.330
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 3.000 $65.000 $111.000 $108.000 $130.000 $145.890
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 22,423.000 $0.350 $0.300 $0.300 $1.000 $0.310
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 480.000 $1.400 $1.100 $1.080 $1.000 $1.320
WK ZN PAV MRK REMOV (W)(ARROW)
EA 2.000 $159.000 $194.000 $189.000 $220.000 $246.330
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 2.000 $162.000 $333.000 $324.000 $380.000 $383.830
WK ZN PAV MRK REMOV (W)(WORD)
EA 1.000 $201.000 $278.000 $270.000 $310.000 $382.660
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 7,064.000 $0.600 $1.000 $0.970 $1.000 $1.010
REFL PAV MRK TY I (W)12"(LNDP)(090MIL)
LF 333.000 $2.500 $2.750 $2.700 $3.000 $3.070
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 1,674.000 $2.500 $1.650 $1.620 $2.000 $1.710
REFL PAV MRK TY I (W)(ARROW)(090MIL)
EA 4.000 $130.000 $194.000 $189.000 $220.000 $219.410
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 4.000 $160.000 $278.000 $270.000 $310.000 $301.910
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 5,738.000 $1.100 $0.550 $0.520 $1.000 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 24,213.000 $0.450 $0.500 $0.480 $1.000 $0.490
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 25,055.000 $0.500 $0.500 $0.480 $1.000 $0.490
REFL PAV MRKR TY II-C-R
EA 522.000 $3.700 $5.000 $4.860 $6.000 $5.160
ELIM EXT PAV MRK & MRKS (4")
LF 6,082.000 $0.500 $1.400 $4.000 $2.000 $2.220
D-GR HMA TY-D SAC-B PG70-22
TON 5,548.000 $90.000 $105.000 $126.000 $120.000 $124.260
TACK COAT
GAL 997.000 $3.000 $3.300 $6.000 $5.000 $4.780
SP MIXES SP-B PG70-22
TON 4,019.000 $95.000 $105.000 $123.000 $110.000 $172.410
TACK COAT
GAL 2,263.000 $2.100 $3.300 $6.000 $5.000 $4.680
REMOVE CONDUCTOR
LF 4,135.000 $2.000 $1.300 $0.540 $1.000 $0.580
REMOVE ROADWAY ILLUM ASSEMBLY (LED)
EA 7.000 $550.000 $222.000 $270.000 $320.000 $290.380
REMOVE FOUNDATION
EA 7.000 $1,800.000 $580.000 $270.000 $1,100.000 $290.380
INSTALL CIRCUIT BREAKER
EA 3.000 $925.000 $1,030.000 $345.600 $140.000 $387.890
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 438.000 $140.000 $66.000 $100.000 $130.000 $110.250
ITS SYSTEM SUPPORT EQUIPMENT
LS 1.000 $12,000.000 $2,400.000 $1,080.000 $2,000.000 $1,207.660
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 465.000 $5.000 $1.450 $17.280 $26.000 $17.830
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 12,277.000 $5.000 $2.300 $6.750 $4.000 $6.880
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 4.000 $2,500.000 $1,550.000 $810.000 $1,000.000 $840.910
FIBER OPTIC CABLE ROAD MARKER
EA 20.000 $170.000 $189.000 $226.800 $230.000 $236.380
FIBER OPTIC PATCH PANEL (144 POSITION)
EA 4.000 $5,800.000 $5,330.000 $2,484.000 $5,900.000 $2,556.910
FO SPLICE ENCLOSURE (TYPE 3)
EA 6.000 $1,600.000 $2,000.000 $1,728.000 $2,000.000 $1,777.940
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 2.000 $9,200.000 $9,970.000 $11,772.000 $12,000.000 $12,043.830
CCTV FIELD EQUIPMENT (DIGITAL)
EA 1.000 $12,500.000 $11,100.000 $9,612.000 $6,400.000 $9,897.660
INSTALL DMS (FOUNDATION MTD CABINET)
EA 1.000 $15,000.000 $11,400.000 $15,336.000 $11,500.000 $15,727.660
ITS POLE (50 FT)(130 MPH)
EA 1.000 $15,000.000 $14,200.000 $13,284.000 $12,500.000 $13,637.660
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 1.000 $7,200.000 $6,940.000 $5,184.000 $6,900.000 $5,387.660
ETHERNET SWITCH (INSTALL ONLY)
EA 4.000 $500.000 $389.000 $680.400 $390.000 $715.210
MPEG 4 VIDEO ENCODER (INSTALL ONLY)
EA 3.000 $525.000 $333.000 $594.000 $390.000 $640.890
TMA (STATIONARY)
DAY 438.000 $175.000 $10.000 $215.000 $250.000 $66.250
TMA (MOBILE OPERATION)
HR 960.000 $75.000 $5.000 $20.000 $65.000 $44.110
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 20.000 $3,100.000 $3,330.000 $5,616.000 $3,700.000 $5,725.380
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 6.000 $4,500.000 $4,770.000 $10,152.000 $6,400.000 $10,357.940
SYSTEM INTEGRATION
LS 1.000 $10,000.000 $44,300.000 $19,224.000 $4,600.000 $19,687.660
Totals: $7,927,833.290 $7,712,829.030 $8,933,793.400 $9,281,332.350 $10,120,660.630