PREPARING ROW
|
STA
|
120.000
|
$100.000
|
$479.000
|
$430.000
|
$21,500.000
|
$7,500.000
|
$33,370.580
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
958.000
|
$24.000
|
$7.850
|
$5.200
|
$5.500
|
$20.000
|
$17.410
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
7,480.000
|
$9.000
|
$3.850
|
$2.000
|
$4.500
|
$20.000
|
$4.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
65,946.000
|
$9.000
|
$5.900
|
$6.000
|
$7.000
|
$5.000
|
$3.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
514,568.000
|
$5.000
|
$16.000
|
$17.750
|
$4.750
|
$7.000
|
$9.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
90,378.000
|
$1.000
|
$0.100
|
$0.120
|
$0.140
|
$0.090
|
$0.090
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
90,378.000
|
$0.200
|
$0.050
|
$0.060
|
$0.130
|
$0.070
|
$0.070
|
|
|
FERTILIZER
|
AC
|
37.000
|
$628.000
|
$75.000
|
$130.000
|
$408.000
|
$250.000
|
$225.930
|
|
|
VEGETATIVE WATERING
|
MG
|
4,482.000
|
$20.000
|
$10.000
|
$17.500
|
$14.000
|
$25.000
|
$27.290
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
59,413.000
|
$1.200
|
$0.850
|
$1.200
|
$0.790
|
$0.780
|
$0.780
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
41,261.000
|
$47.000
|
$53.000
|
$52.000
|
$52.000
|
$48.000
|
$50.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,588.000
|
$100.000
|
$136.000
|
$180.000
|
$175.000
|
$175.000
|
$180.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
131,303.000
|
$1.500
|
$2.400
|
$1.700
|
$1.850
|
$2.750
|
$2.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,787.000
|
$3.000
|
$3.450
|
$3.500
|
$4.500
|
$4.000
|
$3.750
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
65,628.000
|
$2.000
|
$2.050
|
$2.400
|
$2.700
|
$3.750
|
$2.100
|
|
|
AGGR (MULTI OPTION)
|
CY
|
1,707.000
|
$90.000
|
$115.000
|
$93.000
|
$110.000
|
$110.000
|
$110.000
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
20,620.000
|
$62.000
|
$74.000
|
$70.000
|
$71.660
|
$77.000
|
$75.850
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
23,966.000
|
$50.000
|
$63.270
|
$65.000
|
$76.950
|
$72.000
|
$70.750
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
78,514.000
|
$1.000
|
$1.200
|
$1.400
|
$1.250
|
$2.000
|
$1.250
|
|
|
CEM STABIL BKFL
|
CY
|
1,629.000
|
$90.000
|
$60.000
|
$63.000
|
$65.000
|
$175.000
|
$70.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
3,636.000
|
$150.000
|
$55.000
|
$77.000
|
$45.000
|
$80.000
|
$60.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
24,259.000
|
$9.000
|
$1.250
|
$1.000
|
$0.500
|
$1.000
|
$1.080
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
329.000
|
$100.000
|
$54.000
|
$47.000
|
$45.000
|
$75.000
|
$44.830
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
6,195.000
|
$236.000
|
$158.000
|
$170.000
|
$140.000
|
$150.000
|
$136.640
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
231.000
|
$200.000
|
$540.000
|
$530.000
|
$445.000
|
$510.000
|
$510.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
140.000
|
$161.000
|
$238.000
|
$240.000
|
$175.000
|
$225.000
|
$225.000
|
|
|
CL C CONC (ABUT)
|
CY
|
417.300
|
$800.000
|
$692.000
|
$610.000
|
$150.000
|
$900.000
|
$1,050.000
|
|
|
CL C CONC (BENT)
|
CY
|
492.500
|
$800.000
|
$692.000
|
$680.000
|
$750.000
|
$900.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
71,040.000
|
$13.000
|
$17.500
|
$15.000
|
$15.500
|
$15.000
|
$19.000
|
|
|
APPROACH SLAB
|
CY
|
495.600
|
$400.000
|
$451.000
|
$460.000
|
$410.000
|
$475.000
|
$500.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
166,323.000
|
$40.000
|
$27.750
|
$28.000
|
$63.000
|
$55.000
|
$59.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
9,459.420
|
$110.000
|
$135.750
|
$140.000
|
$115.000
|
$110.000
|
$140.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
2,654.600
|
$300.000
|
$100.000
|
$500.000
|
$325.000
|
$425.000
|
$320.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
4.900
|
$300.000
|
$384.000
|
$440.000
|
$540.000
|
$800.000
|
$400.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
250.000
|
$500.000
|
$398.000
|
$490.000
|
$410.000
|
$525.000
|
$330.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
145.000
|
$400.000
|
$450.000
|
$460.000
|
$405.000
|
$575.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
750.000
|
$400.000
|
$428.000
|
$470.000
|
$370.000
|
$525.000
|
$410.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
84.000
|
$7.000
|
$22.000
|
$17.250
|
$50.000
|
$0.010
|
$12.820
|
|
|
RAIL (TY SSTR)
|
LF
|
12,362.000
|
$70.000
|
$59.000
|
$59.000
|
$30.000
|
$50.000
|
$58.100
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
620.000
|
$80.000
|
$59.000
|
$60.000
|
$80.000
|
$85.000
|
$65.650
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
4,465.000
|
$220.000
|
$233.000
|
$180.000
|
$185.000
|
$225.000
|
$189.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
11,500.000
|
$200.000
|
$285.000
|
$220.000
|
$220.000
|
$265.000
|
$229.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
4,457.000
|
$370.000
|
$330.000
|
$270.000
|
$260.000
|
$325.000
|
$277.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)
|
LF
|
1,492.000
|
$500.000
|
$377.000
|
$300.000
|
$290.000
|
$375.000
|
$315.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,358.000
|
$68.000
|
$75.000
|
$66.000
|
$50.000
|
$125.000
|
$57.150
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
360.000
|
$117.000
|
$114.000
|
$80.000
|
$75.000
|
$125.000
|
$90.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
38.000
|
$3,000.000
|
$2,680.000
|
$2,500.000
|
$3,200.000
|
$6,000.000
|
$3,325.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
25.000
|
$4,000.000
|
$3,280.000
|
$3,400.000
|
$4,000.000
|
$5,300.000
|
$4,850.000
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
4.000
|
$3,766.000
|
$5,620.000
|
$3,800.000
|
$4,000.000
|
$6,000.000
|
$3,800.000
|
|
|
INLET (STG I)(PSL)(S1)(4FTX4FT-4FTX4FT)
|
EA
|
34.000
|
$1,200.000
|
$2,670.000
|
$3,500.000
|
$2,500.000
|
$3,700.000
|
$3,600.000
|
|
|
INLET (COMPL)(RWI)(TY I)
|
EA
|
40.000
|
$3,000.000
|
$2,070.000
|
$3,400.000
|
$3,700.000
|
$2,600.000
|
$3,000.000
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
3.000
|
$6,000.000
|
$9,850.000
|
$4,000.000
|
$6,000.000
|
$6,000.000
|
$13,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$7,400.000
|
$9,850.000
|
$7,600.000
|
$10,500.000
|
$9,000.000
|
$15,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$1,195.000
|
$1,530.000
|
$950.000
|
$1,125.000
|
$1,200.000
|
$1,475.000
|
|
|
PIPE (PVC) (SCH 40) (18 IN)
|
LF
|
1,233.000
|
$30.000
|
$101.000
|
$81.000
|
$35.000
|
$40.000
|
$64.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$350.000
|
$276.000
|
$820.000
|
$325.000
|
$500.000
|
$400.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,000.000
|
$639.000
|
$1,300.000
|
$1,250.000
|
$1,000.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,346.000
|
$19.000
|
$11.000
|
$16.750
|
$12.500
|
$20.000
|
$10.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
434.000
|
$50.000
|
$44.000
|
$53.000
|
$40.000
|
$75.000
|
$21.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,100,000.000
|
$2,990,000.000
|
$3,950,000.000
|
$4,000,000.000
|
$4,000,000.000
|
$4,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
38.000
|
$7,800.000
|
$2,100.000
|
$4,500.000
|
$20,000.000
|
$7,000.000
|
$5,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$21.000
|
$24.000
|
$34.000
|
$26.000
|
$50.700
|
$50.700
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$8.000
|
$7.250
|
$23.000
|
$12.000
|
$11.400
|
$11.440
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,092.000
|
$2.000
|
$4.600
|
$2.400
|
$3.750
|
$4.330
|
$4.330
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,092.000
|
$1.000
|
$0.550
|
$0.950
|
$1.500
|
$0.510
|
$0.510
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,255.000
|
$5.000
|
$3.250
|
$3.000
|
$3.000
|
$3.090
|
$3.090
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,255.000
|
$1.000
|
$0.400
|
$1.000
|
$1.500
|
$0.360
|
$0.360
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,361.000
|
$50.000
|
$52.000
|
$41.000
|
$55.000
|
$55.000
|
$54.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,270.000
|
$55.000
|
$7.900
|
$24.000
|
$60.000
|
$25.000
|
$37.530
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
12,120.000
|
$7.000
|
$6.150
|
$9.400
|
$7.000
|
$0.010
|
$6.360
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,270.000
|
$9.000
|
$7.300
|
$8.300
|
$7.000
|
$5.000
|
$10.990
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
2,614.000
|
$75.000
|
$74.000
|
$70.000
|
$60.000
|
$75.000
|
$59.000
|
|
|
CONC CURB (TY II)
|
LF
|
1,166.000
|
$19.000
|
$18.000
|
$25.000
|
$8.000
|
$15.000
|
$20.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
595.000
|
$20.000
|
$23.000
|
$32.000
|
$20.000
|
$20.000
|
$22.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,156.000
|
$18.000
|
$25.000
|
$19.750
|
$20.000
|
$23.310
|
$20.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
7.000
|
$1,400.000
|
$1,640.000
|
$1,400.000
|
$650.000
|
$1,553.000
|
$1,560.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$900.000
|
$1,110.000
|
$840.000
|
$650.000
|
$1,046.000
|
$950.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
10,676.000
|
$12.000
|
$13.000
|
$17.250
|
$16.500
|
$12.520
|
$9.850
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
10.000
|
$2,800.000
|
$2,490.000
|
$2,300.000
|
$2,200.000
|
$2,350.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
11.000
|
$2,190.000
|
$3,140.000
|
$2,200.000
|
$2,178.000
|
$2,962.000
|
$2,340.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
6.000
|
$11,936.000
|
$7,500.000
|
$9,400.000
|
$8,648.500
|
$7,080.000
|
$8,600.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$2,059.000
|
$1,160.000
|
$1,400.000
|
$2,047.440
|
$1,100.000
|
$1,695.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$909.000
|
$318.000
|
$870.000
|
$911.190
|
$300.000
|
$990.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
8.000
|
$734.000
|
$249.000
|
$250.000
|
$400.000
|
$235.000
|
$235.000
|
|
|
REPLACE LUMINAIRE W/LED (250W EQ)
|
EA
|
8.000
|
$708.000
|
$741.000
|
$730.000
|
$800.000
|
$700.000
|
$700.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
16.000
|
$1,302.000
|
$1,430.000
|
$1,400.000
|
$1,650.000
|
$1,350.000
|
$1,350.000
|
|
|
IN RD IL (TY SA) 40S-8 (250W EQ) LED
|
EA
|
7.000
|
$2,774.000
|
$3,180.000
|
$3,100.000
|
$3,500.000
|
$3,000.000
|
$3,000.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
14.000
|
$2,719.000
|
$2,970.000
|
$2,900.000
|
$3,700.000
|
$2,800.000
|
$2,800.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
5,637.000
|
$11.000
|
$11.000
|
$10.500
|
$6.000
|
$10.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,243.000
|
$22.000
|
$41.000
|
$41.000
|
$35.000
|
$39.000
|
$39.000
|
|
|
CONDT (RM) (3/4")
|
LF
|
1,113.000
|
$16.000
|
$13.000
|
$12.500
|
$17.000
|
$12.000
|
$12.000
|
|
|
CONDT (RM) (2")
|
LF
|
330.000
|
$29.000
|
$53.000
|
$52.000
|
$20.000
|
$50.000
|
$50.000
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
790.000
|
$1.400
|
$1.550
|
$1.500
|
$0.900
|
$1.450
|
$1.450
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
2,658.000
|
$1.200
|
$1.450
|
$1.400
|
$0.900
|
$1.350
|
$1.350
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,629.000
|
$1.000
|
$1.300
|
$1.300
|
$0.950
|
$1.250
|
$1.250
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
15,408.000
|
$1.600
|
$1.250
|
$1.250
|
$0.950
|
$1.200
|
$1.200
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
15.000
|
$926.000
|
$879.000
|
$870.000
|
$750.000
|
$830.000
|
$830.000
|
|
|
REMOVE GROUND BOX
|
EA
|
5.000
|
$196.000
|
$127.000
|
$130.000
|
$100.000
|
$120.000
|
$120.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$580.000
|
$233.000
|
$230.000
|
$300.000
|
$220.000
|
$220.000
|
|
|
ELC SRV TY A 240/480 060(SS)SS(E)GC(O)
|
EA
|
2.000
|
$5,450.000
|
$7,940.000
|
$7,900.000
|
$5,000.000
|
$7,500.000
|
$7,500.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,486.000
|
$32.000
|
$20.000
|
$20.000
|
$20.000
|
$19.000
|
$25.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
39.000
|
$518.000
|
$547.000
|
$500.000
|
$460.000
|
$495.000
|
$495.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
20.000
|
$559.000
|
$685.000
|
$620.000
|
$540.000
|
$620.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$644.000
|
$868.000
|
$620.000
|
$725.000
|
$785.000
|
$785.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$823.000
|
$1,090.000
|
$970.000
|
$975.000
|
$985.000
|
$985.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
3.000
|
$1,650.000
|
$1,650.000
|
$1,300.000
|
$1,100.000
|
$1,490.000
|
$1,490.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
8.000
|
$1,837.000
|
$1,570.000
|
$1,800.000
|
$1,330.000
|
$1,420.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
10.000
|
$2,759.000
|
$2,980.000
|
$3,000.000
|
$3,300.000
|
$2,700.000
|
$2,700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
26.000
|
$90.000
|
$88.000
|
$89.000
|
$45.000
|
$80.000
|
$80.000
|
|
|
REMOVE LRSA
|
EA
|
4.000
|
$771.000
|
$741.000
|
$730.000
|
$600.000
|
$700.000
|
$700.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$13,488.000
|
$19,200.000
|
$19,000.000
|
$19,000.000
|
$18,100.000
|
$18,100.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
7.000
|
$15,399.000
|
$22,800.000
|
$22,500.000
|
$22,000.000
|
$21,500.000
|
$21,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
46.000
|
$19.000
|
$22.000
|
$26.000
|
$18.270
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
12.000
|
$19.000
|
$22.000
|
$26.000
|
$16.310
|
$20.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
16.000
|
$31.000
|
$38.000
|
$26.000
|
$32.650
|
$34.000
|
$34.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
261.000
|
$3.000
|
$3.700
|
$3.700
|
$3.500
|
$3.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
3,473.000
|
$1.000
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
20,626.000
|
$1.000
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$7.000
|
$3.200
|
$3.100
|
$3.000
|
$3.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
24,012.000
|
$1.000
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.390
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,670.000
|
$1.000
|
$1.100
|
$2.200
|
$2.000
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
81.000
|
$0.900
|
$0.300
|
$0.300
|
$0.280
|
$0.280
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
10,723.000
|
$0.900
|
$0.550
|
$0.500
|
$0.500
|
$0.500
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,040.000
|
$3.000
|
$0.800
|
$0.800
|
$0.750
|
$0.750
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
11,390.000
|
$0.400
|
$0.300
|
$0.300
|
$0.280
|
$0.280
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
43,788.000
|
$0.300
|
$0.300
|
$0.300
|
$0.280
|
$0.280
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
46,806.000
|
$0.400
|
$0.300
|
$0.300
|
$0.280
|
$0.280
|
$0.400
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
369.000
|
$13.000
|
$11.000
|
$10.500
|
$10.000
|
$10.000
|
$13.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
3.000
|
$203.000
|
$196.000
|
$190.000
|
$182.000
|
$185.000
|
$220.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
10.000
|
$344.000
|
$400.000
|
$400.000
|
$385.000
|
$385.000
|
$380.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
21.000
|
$271.000
|
$300.000
|
$300.000
|
$285.000
|
$285.000
|
$300.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
199.000
|
$12.000
|
$12.000
|
$11.500
|
$11.000
|
$11.000
|
$12.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
7.000
|
$3.000
|
$2.900
|
$2.900
|
$2.750
|
$2.750
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
62.000
|
$3.000
|
$2.900
|
$2.900
|
$2.750
|
$2.750
|
$8.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,207.000
|
$3.000
|
$2.900
|
$2.900
|
$2.750
|
$2.750
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
35,825.000
|
$1.000
|
$0.950
|
$1.150
|
$0.500
|
$0.500
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
48.000
|
$3.000
|
$3.000
|
$17.500
|
$2.000
|
$5.000
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$10,000.000
|
$19,300.000
|
$16,000.000
|
$7,500.000
|
$15,696.250
|
|
|
TMA (STATIONARY)
|
DAY
|
2,580.000
|
$125.000
|
$1.000
|
$41.000
|
$10.000
|
$0.010
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
50.000
|
$25.000
|
$32.500
|
$50.000
|
$150.000
|
$250.000
|
$100.000
|
|
Totals: |
$33,992,726.700
|
$37,950,858.385
|
$39,908,099.190
|
$40,942,426.070
|
$41,177,555.270
|
$46,372,107.460
|