Show Job Controls
Bid Cobra

NUECES IH 37 (0074-06-221)

Items: 60

County: NUECES
Length: N/A
Highway: IH 37
District: CORPUS CHRISTI
Control Number: 0074-06-221
DBE Goal: N/A
Project: NH 2018(335)
Guaranty: N/A
Time: 85 WORKING DAYS
Engineer's Estimate: $4,515,457.51
Date: 12/05/2017 (8 years ago)
Contract Number: N/A
Type: MILL,UNDERSEAL,OVERLAY AND NOVACHIP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$4,515,457.51
1
Awarded
$4,615,768.33
Over/Under Est: 2.22% $100,310.82
Over/Under Est: 15.2% $686,154.34
Amt Left: 12.69% $585,843.52

Bid Items & Bid Tabulations

60 Total 0 of 60
NUECES  |  IH 37  |  CORPUS CHRISTI  |  0074-06-221  |  12/05/2017  |  $4,515,457.51  |  NH 2018(335)  |  MILL,UNDERSEAL,OVERLAY AND NOVACHIP  |  85 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
REMOVING CONC (RIPRAP)
SY 824.000 $14.000 $15.000 $20.000
BACKFILL (TY A OR B)
STA 280.000 $110.000 $70.000 $104.690
ASPH (MULTI OPTION)
GAL 67,635.000 $2.500 $2.700 $2.550
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 1,580.000 $80.000 $140.000 $78.870
D-GR HMA TY-B SAC-B PG 70-22
TON 23,848.000 $70.000 $79.000 $99.430
TBWC (MEMBRANE)
GAL 34,686.000 $2.800 $2.600 $2.100
TBWC (ASPHALT)
TON 480.000 $136.000 $110.000 $143.480
TBWC (AGGREGATE)(TY C)
TON 8,198.000 $140.000 $120.000 $143.480
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 4,660.000 $22.000 $28.000 $14.500
PLAN & TEXT ASPH CONC PAV(0" TO 3")
SY 173,411.000 $1.500 $1.400 $2.500
DRILL SHAFT (SIGN MTS) (24 IN)
LF 81.000 $130.000 $320.000 $286.000
CONC STR REPAIR (STANDARD)
SF 200.000 $170.000 $200.000 $160.000
RIPRAP (CONC)(4 IN)
CY 136.000 $380.000 $600.000 $581.140
RIPRAP (MOW STRIP)(4 IN)
CY 64.000 $460.000 $650.000 $650.000
CLEANING AND SEALING EXISTING JOINTS
LF 464.000 $30.000 $35.800 $32.000
MOBILIZATION
LS 1.000 $408,000.000 $200,000.000 $225,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,500.000 $22,500.000 $750.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 375.000 $3.000 $5.800 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 375.000 $1.000 $2.300 $2.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 212.000 $8.000 $7.500 $6.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 212.000 $1.500 $4.000 $3.750
MTL W-BEAM GD FEN (TIM POST)
LF 425.000 $20.000 $23.000 $20.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,550.000 $1,600.000 $1,727.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,000.000 $1,200.000 $1,041.810
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.500 $1.700 $1.500
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $180.000 $170.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $2,300.000 $3,000.000 $2,649.600
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $205.000 $280.000 $250.000
CRASH CUSH ATTEN (INSTL)
EA 3.000 $15,000.000 $18,000.000 $16,100.000
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $940.000 $1,100.000 $1,000.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 60.000 $25.000 $55.000 $40.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 802.500 $25.000 $41.000 $29.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 8.000 $460.000 $540.000 $479.960
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 22.000 $510.000 $660.000 $589.330
REMOVE SM RD SN SUP&AM
EA 30.000 $65.000 $95.000 $85.000
INSTALL LRSS (STRUCT STEEL)
LB 1,852.500 $6.000 $4.300 $3.650
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
EA 8.000 $700.000 $220.000 $480.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
EA 25.000 $55.000 $55.000 $49.510
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 24.000 $15.000 $16.500 $14.810
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 212.000 $15.000 $16.250 $14.470
INSTL DEL ASSM (D-DW)SZ 2(WC)GND
EA 35.000 $25.000 $57.000 $50.930
INSTL OM ASSM (OM-2Y)(WC)GND
EA 11.000 $60.000 $60.000 $53.530
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 9.000 $25.000 $22.000 $19.350
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 25,216.000 $0.250 $0.160 $0.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 81,360.000 $0.250 $0.160 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 5,468.000 $0.500 $0.500 $0.400
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 650.000 $0.750 $1.250 $2.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 56,182.000 $0.250 $0.160 $0.200
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,262.000 $4.000 $3.400 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,222.000 $1.000 $1.900 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,734.000 $0.750 $0.750 $0.950
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 325.000 $2.250 $3.600 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 12,608.000 $0.350 $0.400 $0.300
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 40,680.000 $0.250 $0.400 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 28,091.000 $0.260 $0.400 $0.300
PREFAB PAV MRK TY C (W) (WORD)
EA 12.000 $250.000 $270.000 $175.000
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 6.000 $315.000 $720.000 $500.000
REFL PAV MRKR TY II-C-R
EA 767.000 $3.000 $4.200 $5.000
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 1.000 $17,000.000 $9,100.000 $8,100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 130.000 $75.000 $71.000 $80.000
Totals: $4,515,457.510 $4,615,768.330 $5,201,611.855