Show Job Controls
Bid Cobra

NUECES IH 37 (0074-06-219)

Items: 114

County: NUECES
Length: N/A
Highway: IH 37
District: CORPUS CHRISTI
Control Number: 0074-06-219
DBE Goal: N/A
Project: NH 2019(666)
Guaranty: N/A
Time: 143 WORKING DAYS
Engineer's Estimate: $9,899,337.00
Date: 03/05/2019 (7 years ago)
Contract Number: N/A
Type: MILL,UNDERSEAL,OVERLAY AND NOVACHIP
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$9,899,337.00
1
Awarded
$10,228,897.30
Over/Under Est: 3.33% $329,560.30
Over/Under Est: 6.64% $657,586.22
Amt Left: 3.21% $328,025.92
Over/Under Est: 15.03% $1,487,788.20
Amt Left: 11.32% $1,158,227.90
Delta: -7.86% -$830,201.98

Bid Items & Bid Tabulations

114 Total 0 of 114
NUECES  |  IH 37  |  CORPUS CHRISTI  |  0074-06-219  |  03/05/2019  |  $9,899,337.00  |  NH 2019(666)  |  MILL,UNDERSEAL,OVERLAY AND NOVACHIP  |  143 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
HAAS-ANDERSON CONSTRUCTION, LTD.
CLARK CONSTRUCTION OF TEXAS, INC.
REMOVING CONC (RIPRAP)
SY 86.000 $10.000 $30.000 $20.000 $30.000
REMOVING CONC (FLUME)
SY 207.000 $15.000 $39.000 $16.000 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 1,102.000 $10.000 $11.500 $6.200 $13.000
BACKFILL (TY A OR B)
STA 481.000 $100.000 $118.000 $115.000 $136.510
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 3,150.000 $75.000 $149.000 $159.000 $75.770
ASPH (AC-15P OR AC-20-5TR)
GAL 134,361.000 $3.300 $2.950 $2.800 $3.250
D-GR HMA TY-D PG76-22 (LEVEL-UP)
TON 7.000 $150.000 $720.000 $425.000 $261.430
D-GR HMA TY-B SAC-B PG 70-22
TON 47,596.000 $70.000 $82.000 $77.000 $104.680
TBWC (MEMBRANE)
GAL 68,909.000 $3.000 $3.200 $3.300 $3.000
TBWC (ASPHALT)
TON 967.000 $130.000 $120.000 $139.000 $143.120
TBWC (AGGREGATE)(TY C)
TON 16,294.000 $120.000 $120.000 $139.000 $143.120
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 2,745.000 $26.000 $35.000 $28.000 $23.270
PLANE ASPH CONC PAV (2")
SY 4,028.000 $1.600 $1.500 $2.450 $1.530
PLANE ASPH CONC PAV (3")
SY 340,441.000 $2.500 $1.440 $2.450 $1.530
DRILL SHAFT (SIGN MTS) (24 IN)
LF 39.000 $180.000 $180.000 $160.000 $250.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $230.000 $230.000 $205.000 $303.000
CL A CONC (MISC)
CY 34.000 $750.000 $840.000 $639.000 $495.000
RIPRAP (CONC)(4 IN)
CY 97.000 $490.000 $700.000 $652.000 $495.000
RIPRAP (CONC)(FLUME)
CY 29.000 $375.000 $680.000 $601.000 $495.000
RIPRAP (MOW STRIP)(4 IN)
CY 149.000 $500.000 $590.000 $388.000 $520.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,484.000 $23.000 $27.000 $41.000 $50.000
CLEAN EXIST CULVERTS
EA 5.000 $2,000.000 $5,900.000 $1,660.000 $500.000
MOBILIZATION
LS 1.000 $900,000.000 $469,000.000 $543,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $19,400.000 $20,100.000 $1,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,110.000 $4.000 $5.600 $5.300 $2.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,110.000 $1.250 $1.100 $1.050 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 390.000 $22.000 $84.000 $83.000 $65.000
CONC CURB & GUTTER TY II (MOD)
LF 32.000 $30.000 $97.000 $30.000 $110.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,050.000 $22.000 $29.000 $26.000 $23.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,200.000 $2,060.000 $1,800.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,300.000 $1,400.000 $1,280.000 $1,400.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $1,000.000 $930.000 $854.000 $44.000
REMOVE METAL BEAM GUARD FENCE
LF 2,075.000 $2.500 $2.400 $2.200 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $560.000 $480.000 $443.000 $170.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,900.000 $3,300.000 $3,080.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $180.000 $210.000 $194.000 $250.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $14,300.000 $27,800.000 $25,600.000 $20,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $850.000 $1,500.000 $1,380.000 $1,400.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 37.000 $700.000 $810.000 $719.000 $1,050.000
REPLACE LUMINAIRE W/LED (400W EQ)
EA 48.000 $600.000 $1,200.000 $1,050.000 $760.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 20.000 $1,475.000 $770.000 $692.000 $1,750.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 5.000 $1,500.000 $1,100.000 $968.000 $1,950.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $3,000.000 $4,000.000 $3,540.000 $3,750.000
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 5.000 $4,400.000 $5,200.000 $4,650.000 $4,950.000
CONDT (PVC) (SCH 40) (2")
LF 100.000 $10.000 $25.000 $22.000 $50.500
CONDT (RM) (3/4")
LF 1,880.000 $14.000 $21.000 $19.000 $39.000
CONDT (RM) (1 1/2")
LF 55.000 $17.000 $31.000 $28.000 $52.500
ELEC CONDR (NO.10) BARE
LF 1,460.000 $1.500 $2.100 $1.900 $1.850
ELEC CONDR (NO.10) INSULATED
LF 14,340.000 $1.500 $2.200 $2.000 $1.500
ELEC CONDR (NO.8) BARE
LF 25,388.000 $1.500 $1.350 $1.200 $2.100
ELEC CONDR (NO.8) INSULATED
LF 48,496.000 $1.500 $1.600 $1.450 $1.700
GROUND BOX TY A (122311)W/APRON
EA 33.000 $1,300.000 $970.000 $863.000 $1,420.000
GROUND BOX TY C (162911)W/APRON
EA 3.000 $950.000 $1,200.000 $1,050.000 $1,650.000
REMOVE GROUND BOX
EA 36.000 $150.000 $310.000 $277.000 $160.000
REMOVE ELECTRICAL SERVICES
EA 7.000 $700.000 $400.000 $354.000 $440.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 5.000 $8,300.000 $7,200.000 $6,470.000 $8,950.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
EA 1.000 $5,570.000 $5,500.000 $4,870.000 $7,250.000
ALUMINUM SIGNS (TY A)
SF 205.750 $25.000 $22.000 $20.000 $20.000
ALUMINUM SIGNS (TY G)
SF 438.750 $25.000 $31.000 $28.000 $22.500
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 76.000 $30.000 $22.000 $20.000 $72.500
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 1,718.250 $25.800 $31.000 $28.000 $26.500
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 3,344.500 $25.000 $43.000 $39.000 $27.500
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 25.000 $470.000 $530.000 $526.000 $975.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 37.000 $560.000 $860.000 $858.000 $975.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $865.000 $1,700.000 $1,720.000 $975.000
REMOVE SM RD SN SUP&AM
EA 64.000 $60.000 $73.000 $72.000 $90.000
INSTALL LRSS (STRUCT STEEL)
LB 2,066.400 $4.000 $6.200 $5.550 $3.600
REMOVE LRSA
EA 2.000 $1,200.000 $590.000 $526.000 $970.000
REMOVE SIGN WALKWAY
EA 3.000 $1,560.000 $8,100.000 $7,190.000 $2,600.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 36.000 $60.000 $73.000 $72.000 $98.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 86.000 $15.000 $13.500 $13.000 $32.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 474.000 $20.500 $12.250 $12.000 $32.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 114.000 $50.000 $67.000 $66.000 $70.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 18.000 $60.000 $84.000 $83.000 $70.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 36.000 $30.000 $20.000 $20.000 $30.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 23,760.000 $0.250 $0.150 $0.150 $0.140
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 75,210.000 $0.250 $0.140 $0.150 $0.120
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 12,171.000 $0.500 $0.270 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)12"(LNDP)
LF 454.000 $1.500 $0.500 $0.500 $0.450
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 12,171.000 $1.250 $0.440 $0.450 $0.400
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 73.000 $2.250 $1.100 $1.100 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 51,550.000 $0.250 $0.140 $0.150 $0.120
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,913.000 $3.000 $3.100 $3.050 $2.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 17,946.000 $0.700 $1.050 $1.100 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,171.000 $1.500 $0.650 $0.650 $0.600
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 454.000 $1.500 $1.250 $1.200 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 620.000 $2.000 $1.100 $1.100 $1.000
REFL PAV MRK TY II (W) 4" (BRK)
LF 23,760.000 $0.150 $0.150 $0.150 $0.140
REFL PAV MRK TY II (W) 4" (SLD)
LF 75,210.000 $0.150 $0.140 $0.150 $0.120
REFL PAV MRK TY II (W) 8" (SLD)
LF 12,171.000 $0.300 $0.270 $0.250 $0.240
REFL PAV MRK TY II (W) 12" (LNDP)
LF 1,813.000 $0.650 $0.500 $0.500 $0.450
REFL PAV MRK TY II (W) 12" (SLD)
LF 620.000 $0.650 $0.440 $0.450 $0.400
REFL PAV MRK TY II (Y) 4" (SLD)
LF 51,550.000 $0.150 $0.140 $0.150 $0.120
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 23,760.000 $0.300 $0.360 $0.350 $0.320
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 75,210.000 $0.250 $0.340 $0.350 $0.300
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 51,550.000 $0.250 $0.340 $0.350 $0.300
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 73.000 $12.000 $13.500 $13.000 $12.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 10.000 $200.000 $270.000 $271.000 $245.000
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $270.000 $380.000 $382.000 $345.000
PREFAB PAV MRK TY C (W) (SYMBOL)
EA 4.000 $230.000 $220.000 $216.000 $195.000
REFL PAV MRKR TY I-R
EA 210.000 $5.000 $3.400 $3.300 $3.000
REFL PAV MRKR TY II-C-R
EA 3,101.000 $3.000 $3.100 $3.050 $2.750
DRAIN INLET CLEANING
EA 9.000 $285.000 $2,200.000 $984.000 $500.000
REMOVE ABOVE-GROUND CONDUIT
LF 2,064.000 $12.000 $8.100 $7.200 $11.500
REMOVE UNDERGROUND CONDUIT
LF 55.000 $5.000 $31.000 $28.000 $10.500
REMOVE CONDUCTOR
LF 88,110.000 $3.000 $0.950 $0.850 $1.000
REMOVE UNDERPASS LUMINAIRE (HPS)
EA 23.000 $275.000 $350.000 $315.000 $340.000
REMOVE INDUCTION FLUORESCENT FIXTURE
EA 10.000 $300.000 $150.000 $138.000 $340.000
REPLACE BREAKAWAY FUSE HOLDER
EA 100.000 $200.000 $320.000 $282.000 $230.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 282.000 $100.000 $71.000 $72.000 $100.000
CONDUIT (PREPARE)
LF 24,223.000 $2.000 $3.400 $3.050 $2.000
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 2.000 $16,300.000 $13,000.000 $11,600.000 $16,100.000
TMA (STATIONARY)
DAY 600.000 $120.000 $230.000 $240.000 $400.000
TMA (MOBILE OPERATION)
HR 600.000 $40.000 $23.000 $1.000 $50.000
Totals: $9,899,337.000 $10,228,897.300 $10,556,923.220 $11,387,125.210