Show Job Controls
Bid Cobra

NOLAN CR 314 (0908-20-029)

Items: 32

County: NOLAN
Length: 0.0000 MILES
Highway: CR 314
District: ABILENE
Control Number: 0908-20-029
DBE Goal: 0.0%
Project: BR 2B23(305)
Guaranty: $25,000.00
Time: 149 WORKING DAYS
Engineer's Estimate: $1,233,119.30
Date: 10/09/2025 (8 months ago)
Contract Number: 10253232
Type: BRIDGE REPLACEMENT
Project ID: A00194081
Contract Type: Federal
Project Description: REPLACE BRIDGE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
RYAN SAYLES
LARISSA HALFORD
ANTHONY BOUCHER
JOSE CABRERA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$1,233,119.30
$918,428.50
Over/Under Est: -25.52% -$314,690.80
$929,934.80
Over/Under Est: -24.59% -$303,184.50
Amt Left: 1.25% $11,506.30
$944,491.00
Over/Under Est: -23.41% -$288,628.30
Amt Left: 2.84% $26,062.50
Delta: -1.57% -$14,556.20
Over/Under Est: -15.28% -$188,462.30
Amt Left: 13.74% $126,228.50
Delta: -10.61% -$100,166.00
$1,117,845.00
Over/Under Est: -9.35% -$115,274.30
Amt Left: 21.71% $199,416.50
Delta: -7.01% -$73,188.00
Over/Under Est: -6.04% -$74,504.00
Amt Left: 26.15% $240,186.80
Delta: -3.65% -$40,770.30
$1,229,981.87
Over/Under Est: -0.25% -$3,137.43
Amt Left: 33.92% $311,553.37
Delta: -6.16% -$71,366.57
Over/Under Est: 6.6% $81,400.42
Amt Left: 43.13% $396,091.22
Delta: -6.87% -$84,537.85
Subcontractor Percentage Amount
BARRICADES UNLIMITED 0.86% $7,898.49
Total: 0.86% $7,898.49

Bid Items & Bid Tabulations

32 Total 0 of 32
NOLAN  |  CR 314  |  ABILENE  |  0908-20-029  |  10/09/2025  |  $1,233,119.30  |  BR 2B23(305)  |  BRIDGE REPL  |  149 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
SKYLINE BRIDGE LLC
C & W SOUTHERN LLC
COPPELL CONSTRUCTION CO., INC.
STX CIVIL
HODGES AND SON CONSTRUCTION COMPANY, INC.
C. E. BARKER, LTD.
TEXAS STEEL INDUSTRIAL PLACING, LLC
PREPARING ROW
STA 7.000 $5,000.000 $750.000 $2,500.000 $5,000.000 $8,000.000 $2,800.000 $6,000.000 $18,000.000 $6,500.000
EXCAV (ROADWAY)
CY 304.000 $35.000 $40.000 $17.000 $20.000 $40.000 $30.000 $30.000 $63.880 $30.000
EXCAV (CHANNEL)
CY 163.000 $40.000 $40.000 $20.000 $40.000 $42.000 $35.000 $50.000 $58.330 $30.000
EMBANK (FNL)(DC)(TY C)
CY 112.000 $34.000 $25.000 $60.000 $20.000 $49.000 $40.000 $100.000 $58.330 $30.000
DRILL SEED (PERM_RURAL_SAND)
SY 1,166.000 $0.200 $1.000 $4.000 $3.700 $4.000 $1.250 $5.000 $2.220 $3.000
VEGETATIVE WATERING
TGL 22.800 $37.000 $50.000 $1.000 $1.000 $50.000 $50.000 $1.000 $116.660 $1.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(6")
SY 1,721.000 $40.000 $35.000 $55.000 $50.000 $25.000 $115.000 $50.000 $44.400 $50.000
CEM STABIL BKFL
CY 98.000 $300.000 $280.000 $300.000 $350.000 $335.000 $235.000 $350.000 $224.980 $275.000
DRILL SHAFT (24 IN)
LF 360.000 $320.000 $255.000 $275.000 $252.000 $290.000 $315.000 $305.000 $503.590 $575.000
CL C CONC (ABUT)
CY 44.000 $2,500.000 $1,800.000 $1,350.000 $1,200.000 $1,500.000 $1,300.000 $2,500.000 $2,374.010 $2,500.000
CL C CONC (MISC)
CY 14.900 $2,500.000 $1,500.000 $1,250.000 $1,000.000 $1,900.000 $1,500.000 $2,000.000 $2,374.010 $1,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $30.000 $30.000 $28.000 $35.000 $32.500 $35.000 $40.000 $39.230 $40.000
PRESTR CONC SLAB BEAM (5SB15)
LF 495.000 $267.000 $315.000 $325.000 $380.000 $235.000 $285.000 $350.000 $250.420 $400.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 236.000 $362.000 $225.000 $165.000 $250.000 $240.000 $220.000 $225.000 $58.330 $225.000
RAIL (TY T223)
LF 252.000 $235.000 $180.000 $180.000 $200.000 $160.000 $220.000 $220.000 $208.670 $175.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $50,000.000 $35,000.000 $15,000.000 $10,000.000 $30,000.000 $38,000.000 $30,000.000 $33,607.750 $40,000.000
MOBILIZATION
LS 1.000 $99,830.000 $80,250.000 $80,000.000 $120,000.000 $100,000.000 $100,000.000 $100,000.000 $100,000.000 $131,033.920
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $1,250.000 $3,000.000 $1,160.000 $10,000.000 $2,800.000 $8,600.000 $3,805.180 $2,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $47.000 $75.000 $55.000 $10.000 $100.000 $30.000 $1.000 $88.880 $60.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $16.000 $15.000 $10.000 $1.000 $25.000 $20.000 $1.000 $33.330 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,150.000 $5.000 $7.000 $3.900 $2.000 $10.000 $6.000 $1.000 $5.560 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,150.000 $2.000 $1.000 $1.000 $1.000 $2.000 $1.000 $1.000 $2.220 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 245.000 $12.000 $10.000 $12.000 $4.000 $10.000 $8.000 $1.000 $11.110 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 245.000 $2.500 $1.000 $6.000 $1.000 $5.000 $2.000 $1.000 $5.560 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 187.500 $32.000 $33.000 $32.000 $24.000 $24.000 $35.000 $25.000 $33.330 $30.000
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $2,400.000 $1,500.000 $1,500.000 $1,200.000 $1,200.000 $1,800.000 $1,400.000 $1,944.250 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,250.000 $3,500.000 $3,600.000 $3,125.000 $3,125.000 $3,700.000 $3,300.000 $4,027.380 $3,000.000
WIRE FENCE (TY C)
LF 610.000 $30.000 $25.000 $25.000 $10.000 $32.000 $30.000 $20.000 $33.330 $60.000
WIRE FENCE (TY D)
LF 852.000 $30.000 $25.000 $25.000 $12.000 $32.000 $30.000 $25.000 $33.330 $60.000
WIRE FENCE (WATER GAP)
LF 229.000 $55.000 $50.000 $150.000 $45.000 $90.000 $50.000 $35.000 $99.990 $60.000
WIRE FENCE (REMOVE)
LF 240.000 $2.500 $2.000 $10.000 $1.000 $4.000 $1.000 $5.000 $3.330 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $35.000 $30.000 $50.000 $45.000 $45.000 $50.000 $50.000 $27.780 $30.000
Totals: $1,233,119.300 $918,428.500 $929,934.800 $944,491.000 $1,044,657.000 $1,117,845.000 $1,158,615.300 $1,229,981.862 $1,314,519.720
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $6,000.00