Show Job Controls
Bid Cobra

NOLAN CR (0908-20-026)

Items: 29

County: NOLAN
Length: N/A
Highway: CR
District: ABILENE
Control Number: 0908-20-026
DBE Goal: N/A
Project: BR 1902(088)
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $777,298.69
Date: 03/05/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$777,298.69
Over/Under Est: 6.86% $53,351.91
Over/Under Est: 28.33% $220,231.78
Amt Left: 20.09% $166,879.87
$1,083,381.90
Over/Under Est: 39.38% $306,083.21
Amt Left: 30.43% $252,731.30
Delta: -8.61% -$85,851.43

Bid Items & Bid Tabulations

29 Total 0 of 29
NOLAN  |  CR  |  ABILENE  |  0908-20-026  |  03/05/2020  |  $777,298.69  |  BR 1902(088)  |  BRIDGE REPL  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 6.500 $3,303.000 $4,600.000 $1,944.000 $10,000.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 333.000 $28.000 $30.000 $43.640 $30.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 684.000 $12.000 $25.000 $30.490 $40.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 2,210.000 $2.000 $3.000 $2.000 $6.500
CEM STABIL BKFL
CY 52.000 $185.000 $250.000 $162.420 $350.000
DRILL SHAFT (24 IN)
LF 354.000 $207.000 $250.000 $421.830 $185.000
CL C CONC (ABUT)
CY 41.400 $1,150.000 $1,500.000 $1,474.340 $1,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,210.000 $18.000 $28.000 $35.210 $20.000
PRESTR CONC SLAB BEAM (5SB12)
LF 172.500 $213.000 $260.000 $235.500 $280.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.410 $191.000 $260.000 $246.750 $290.000
RIPRAP (CONC)(5 IN)
CY 60.000 $542.000 $600.000 $764.590 $650.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 320.000 $141.000 $180.000 $227.080 $185.000
RAIL (TY T223)
LF 218.000 $225.000 $150.000 $205.220 $165.000
ARMOR JOINT (SEALED)
LF 90.000 $110.000 $75.000 $195.020 $500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $19,025.000 $15,000.000 $16,841.420 $50,000.000
REMOVE STR (RAIL)
LF 182.000 $25.000 $20.000 $38.550 $85.000
MOBILIZATION
LS 1.000 $56,871.380 $75,000.000 $138,331.460 $125,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $13,500.000 $2,500.000 $1,339.400 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 80.000 $61.000 $5.000 $51.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $15.000 $5.000 $10.300 $15.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,404.000 $11.000 $5.000 $11.640 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,404.000 $5.000 $1.000 $2.290 $9.000
MTL W-BEAM GD FEN (STEEL POST)
LF 200.000 $32.000 $26.000 $33.600 $35.000
MTL BEAM GD FEN TRANS (TL2)
EA 8.000 $1,200.000 $2,000.000 $1,664.960 $1,850.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,116.000 $2,800.000 $3,314.960 $3,000.000
WIRE FENCE (TY C)
LF 273.000 $18.000 $20.000 $16.940 $10.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 11.000 $140.000 $200.000 $120.880 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 24.000 $46.000 $50.000 $43.490 $100.000
SP MIXES SP-B PG64-22
TON 570.000 $150.000 $200.000 $176.970 $200.000
Totals: $777,298.690 $830,650.600 $997,530.484 $1,083,381.900