PREPARING ROW
|
STA
|
103.000
|
$700.000
|
$400.000
|
$1,000.000
|
$600.000
|
$3,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
26,088.000
|
$11.000
|
$6.500
|
$25.000
|
$22.000
|
$30.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
131.000
|
$20.000
|
$135.000
|
$250.000
|
$84.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
11,803.000
|
$15.000
|
$26.000
|
$33.000
|
$12.000
|
$30.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
43.570
|
$600.000
|
$1,500.000
|
$1,200.000
|
$880.000
|
$700.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
21.790
|
$475.000
|
$850.000
|
$725.000
|
$880.000
|
$600.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
21.790
|
$550.000
|
$850.000
|
$725.000
|
$880.000
|
$600.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,771.600
|
$60.000
|
$450.000
|
$18.000
|
$20.000
|
$26.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
10,193.000
|
$65.000
|
$65.000
|
$100.000
|
$86.000
|
$100.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
855.000
|
$375.000
|
$275.000
|
$425.000
|
$400.000
|
$350.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
63,047.000
|
$5.000
|
$8.000
|
$4.000
|
$7.800
|
$15.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
10,997.000
|
$7.000
|
$8.500
|
$6.000
|
$9.500
|
$7.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
21,993.000
|
$7.000
|
$8.500
|
$6.000
|
$6.600
|
$6.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
442.000
|
$250.000
|
$250.000
|
$250.000
|
$350.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
22,710.000
|
$41.000
|
$50.000
|
$35.000
|
$58.000
|
$35.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,258.000
|
$8.000
|
$6.500
|
$10.000
|
$15.000
|
$15.000
|
|
|
CUT & RESTORING PAV
|
SY
|
828.000
|
$300.000
|
$140.000
|
$125.000
|
$93.500
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
416.000
|
$670.000
|
$450.000
|
$350.000
|
$385.000
|
$350.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
136.000
|
$40.000
|
$30.000
|
$10.000
|
$55.000
|
$50.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
410.000
|
$80.000
|
$50.000
|
$25.000
|
$93.500
|
$100.000
|
|
|
CLASS S CONC UTILITY PROTECTION PADDING
|
CY
|
2.000
|
$3,000.000
|
$1,500.000
|
$4,000.000
|
$7,150.000
|
$2,000.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.000
|
$750.000
|
$700.000
|
$650.000
|
$907.500
|
$825.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
32.000
|
$850.000
|
$800.000
|
$625.000
|
$907.500
|
$825.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
25.000
|
$800.000
|
$900.000
|
$825.000
|
$962.500
|
$700.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
186.000
|
$650.000
|
$625.000
|
$800.000
|
$1,100.000
|
$1,000.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
782.000
|
$220.000
|
$275.000
|
$225.000
|
$385.000
|
$350.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
84.000
|
$300.000
|
$325.000
|
$255.000
|
$434.500
|
$400.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
408.000
|
$400.000
|
$380.000
|
$300.000
|
$511.500
|
$500.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 4)
|
LF
|
816.000
|
$450.000
|
$450.000
|
$350.000
|
$550.000
|
$500.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 1)
|
LF
|
1,112.000
|
$350.000
|
$330.000
|
$275.000
|
$440.000
|
$400.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$30,000.000
|
$30,000.000
|
$30,000.000
|
$30,800.000
|
$30,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
1.000
|
$16,000.000
|
$16,000.000
|
$25,000.000
|
$27,500.000
|
$25,000.000
|
|
|
SET (TY II) (DES 1) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$1,800.000
|
$2,500.000
|
$3,500.000
|
$2,035.000
|
$2,000.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (C)
|
EA
|
22.000
|
$2,000.000
|
$2,600.000
|
$4,000.000
|
$2,200.000
|
$2,000.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
31.000
|
$2,100.000
|
$2,750.000
|
$4,500.000
|
$2,200.000
|
$2,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$3,100.000
|
$3,300.000
|
$7,500.000
|
$3,300.000
|
$3,000.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (C)
|
EA
|
14.000
|
$4,500.000
|
$3,700.000
|
$8,000.000
|
$4,950.000
|
$4,500.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$4,500.000
|
$3,600.000
|
$8,500.000
|
$3,300.000
|
$3,000.000
|
|
|
SET (TY II) (DES 4) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$5,500.000
|
$4,000.000
|
$10,000.000
|
$6,050.000
|
$5,500.000
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (C)
|
EA
|
10.000
|
$5,500.000
|
$4,200.000
|
$11,000.000
|
$8,415.000
|
$7,700.000
|
|
|
REMOV STR (SET)
|
EA
|
36.000
|
$900.000
|
$2,600.000
|
$2,500.000
|
$1,100.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,318.000
|
$50.000
|
$36.000
|
$40.000
|
$16.500
|
$20.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$1,800.000
|
$1,500.000
|
$3,000.000
|
$1,100.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,081,616.000
|
$530,000.000
|
$1,200,000.000
|
$1,164,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$13,500.000
|
$11,000.000
|
$35,000.000
|
$24,000.000
|
$75,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
985.000
|
$6.000
|
$4.000
|
$10.000
|
$11.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
985.000
|
$2.000
|
$2.000
|
$5.000
|
$1.100
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,753.000
|
$6.000
|
$4.000
|
$8.000
|
$11.000
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,753.000
|
$2.000
|
$5.000
|
$3.000
|
$1.100
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$10,000.000
|
$5,000.000
|
$10,000.000
|
$12,000.000
|
$6,000.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
390.000
|
$25.000
|
$20.000
|
$100.000
|
$60.000
|
$20.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,730.000
|
$13.000
|
$20.000
|
$55.000
|
$46.000
|
$15.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
390.000
|
$25.000
|
$20.000
|
$100.000
|
$60.000
|
$20.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,308.000
|
$45.000
|
$120.000
|
$55.000
|
$45.000
|
$35.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,640.000
|
$40.000
|
$50.000
|
$40.000
|
$75.000
|
$20.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
453.000
|
$35.000
|
$25.000
|
$30.000
|
$42.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
67,390.000
|
$0.200
|
$0.750
|
$0.150
|
$0.280
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,713.000
|
$0.200
|
$1.000
|
$0.200
|
$0.400
|
$0.350
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
325.000
|
$30.000
|
$105.000
|
$40.000
|
$32.730
|
$30.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
25.000
|
$85.000
|
$105.000
|
$75.000
|
$59.680
|
$55.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,800.000
|
$5,000.000
|
$5,000.000
|
$3,712.500
|
$3,400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
16.000
|
$2,500.000
|
$15,000.000
|
$3,000.000
|
$1,160.970
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,750.000
|
$7,500.000
|
$2,000.000
|
$1,160.970
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$22,000.000
|
$15,000.000
|
$11,850.390
|
$8,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
30.000
|
$25.000
|
$250.000
|
$75.000
|
$96.700
|
$100.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$660.000
|
$1,500.000
|
$600.000
|
$550.000
|
$600.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
2.000
|
$300.000
|
$2,500.000
|
$500.000
|
$330.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$1,010.000
|
$1,200.000
|
$1,000.000
|
$847.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$1,050.000
|
$1,200.000
|
$1,000.000
|
$880.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,400.000
|
$1,300.000
|
$1,200.000
|
$1,045.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
29.000
|
$570.000
|
$600.000
|
$600.000
|
$544.500
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
4.000
|
$660.000
|
$620.000
|
$600.000
|
$550.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
43.000
|
$130.000
|
$300.000
|
$200.000
|
$110.000
|
$200.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$40.000
|
$500.000
|
$50.000
|
$47.300
|
$44.950
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
29.000
|
$85.000
|
$65.000
|
$100.000
|
$71.500
|
$135.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,380.000
|
$1.000
|
$0.750
|
$2.500
|
$2.200
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,042.000
|
$2.500
|
$1.500
|
$2.000
|
$0.700
|
$1.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
627.000
|
$3.000
|
$2.500
|
$3.000
|
$0.880
|
$2.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
90,870.000
|
$0.500
|
$0.500
|
$0.500
|
$0.280
|
$0.230
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
192.000
|
$9.000
|
$11.000
|
$15.000
|
$3.300
|
$3.550
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
108,152.000
|
$0.500
|
$0.500
|
$0.500
|
$0.310
|
$0.230
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
4,341.000
|
$1.500
|
$0.600
|
$1.000
|
$0.680
|
$0.900
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
67,290.000
|
$1.500
|
$0.600
|
$0.800
|
$0.680
|
$0.870
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
510.000
|
$1.000
|
$0.600
|
$1.000
|
$1.050
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
61,616.000
|
$1.500
|
$0.600
|
$0.900
|
$0.680
|
$0.870
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
152.000
|
$25.000
|
$25.000
|
$25.000
|
$16.500
|
$25.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$300.000
|
$1,200.000
|
$800.000
|
$330.000
|
$257.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
254.000
|
$5.000
|
$5.000
|
$7.000
|
$7.700
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
829.000
|
$5.000
|
$4.800
|
$7.000
|
$6.600
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
136,450.000
|
$0.750
|
$0.520
|
$0.600
|
$0.420
|
$0.520
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
192.000
|
$55.000
|
$12.000
|
$6.000
|
$2.640
|
$3.650
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
25,764.000
|
$145.000
|
$130.000
|
$135.000
|
$169.000
|
$160.000
|
|
|
TACK COAT
|
GAL
|
19,538.000
|
$6.000
|
$8.500
|
$6.000
|
$6.400
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
206.000
|
$160.000
|
$250.000
|
$250.000
|
$220.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$300.000
|
$350.000
|
$400.000
|
$360.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
120.000
|
$380.000
|
$500.000
|
$119.660
|
$200.000
|
$950.000
|
|
Totals: |
$11,888,216.350
|
$12,314,224.400
|
$12,958,913.000
|
$14,051,467.330
|
$15,252,078.430
|