Show Job Controls
Bid Cobra

NOLAN SH 153 (0650-01-037)

Items: 96

County: NOLAN
Length: N/A
Highway: SH 153
District: ABILENE
Control Number: 0650-01-037
DBE Goal: N/A
Project: F 2B23(035)
Guaranty: N/A
Time: 324 WORKING DAYS
Engineer's Estimate: $11,888,216.35
Date: 06/02/2023 (3 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$11,888,216.35
Over/Under Est: 3.58% $426,008.05
$12,958,913.00
Over/Under Est: 9.01% $1,070,696.65
Amt Left: 5.24% $644,688.60
$14,051,467.33
Over/Under Est: 18.2% $2,163,250.98
Amt Left: 14.11% $1,737,242.93
Delta: -8.43% -$1,092,554.33
$15,252,078.43
Over/Under Est: 28.3% $3,363,862.08
Amt Left: 23.86% $2,937,854.03
Delta: -8.54% -$1,200,611.10
Subcontractor Percentage Amount
4-WAY HAULERS, LLC 14.34% $1,765,859.78
FLAT LINE, INC. 1.69% $208,110.39
CONTRACTORS SERVICE, LTD. 0.67% $82,505.30
DK CONTRACTING, LLC 0.36% $44,331.21
Total: 17.06% $2,100,806.68

Bid Items & Bid Tabulations

96 Total 0 of 96
NOLAN  |  SH 153  |  ABILENE  |  0650-01-037  |  06/02/2023  |  $11,888,216.35  |  F 2B23(035)  |  WIDEN ROAD - ADD LANES  |  324 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BONTKE BROTHERS CONSTRUCTION COMPANY
CK NEWBERRY, LLC
A. L. HELMCAMP, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 103.000 $700.000 $400.000 $1,000.000 $600.000 $3,000.000
EXCAVATION (ROADWAY)
CY 26,088.000 $11.000 $6.500 $25.000 $22.000 $30.000
EXCAVATION (CHANNEL)
CY 131.000 $20.000 $135.000 $250.000 $84.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 11,803.000 $15.000 $26.000 $33.000 $12.000 $30.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
AC 43.570 $600.000 $1,500.000 $1,200.000 $880.000 $700.000
DRILL SEEDING (TEMP) (WARM)
AC 21.790 $475.000 $850.000 $725.000 $880.000 $600.000
DRILL SEEDING (TEMP) (COOL)
AC 21.790 $550.000 $850.000 $725.000 $880.000 $600.000
VEGETATIVE WATERING
MG 1,771.600 $60.000 $450.000 $18.000 $20.000 $26.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 10,193.000 $65.000 $65.000 $100.000 $86.000 $100.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 855.000 $375.000 $275.000 $425.000 $400.000 $350.000
LIME TRT (SUBGRADE)(6")
SY 63,047.000 $5.000 $8.000 $4.000 $7.800 $15.000
PRIME COAT (MC-30)
GAL 10,997.000 $7.000 $8.500 $6.000 $9.500 $7.500
ASPH (AC-20-5TR)
GAL 21,993.000 $7.000 $8.500 $6.000 $6.600 $6.000
AGGR(TY-PB GR-3 SAC-B)
CY 442.000 $250.000 $250.000 $250.000 $350.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 22,710.000 $41.000 $50.000 $35.000 $58.000 $35.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,258.000 $8.000 $6.500 $10.000 $15.000 $15.000
CUT & RESTORING PAV
SY 828.000 $300.000 $140.000 $125.000 $93.500 $100.000
FLOWABLE BACKFILL
CY 416.000 $670.000 $450.000 $350.000 $385.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 136.000 $40.000 $30.000 $10.000 $55.000 $50.000
TEMPORARY SPL SHORING
SF 410.000 $80.000 $50.000 $25.000 $93.500 $100.000
CLASS S CONC UTILITY PROTECTION PADDING
CY 2.000 $3,000.000 $1,500.000 $4,000.000 $7,150.000 $2,000.000
RIPRAP (CONC)(4 IN)
CY 5.000 $750.000 $700.000 $650.000 $907.500 $825.000
RIPRAP (CONC)(5 IN)
CY 32.000 $850.000 $800.000 $625.000 $907.500 $825.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $800.000 $900.000 $825.000 $962.500 $700.000
CONC BOX CULV (5 FT X 3 FT)
LF 186.000 $650.000 $625.000 $800.000 $1,100.000 $1,000.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 782.000 $220.000 $275.000 $225.000 $385.000 $350.000
RC PIPE (ARCH)(CL III)(DES 3)
LF 84.000 $300.000 $325.000 $255.000 $434.500 $400.000
RC PIPE (ARCH)(CL IV)(DES 3)
LF 408.000 $400.000 $380.000 $300.000 $511.500 $500.000
RC PIPE (ARCH)(CL IV)(DES 4)
LF 816.000 $450.000 $450.000 $350.000 $550.000 $500.000
RC PIPE (ARCH)(CL IV)(DES 1)
LF 1,112.000 $350.000 $330.000 $275.000 $440.000 $400.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $30,000.000 $30,000.000 $30,000.000 $30,800.000 $30,000.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $16,000.000 $16,000.000 $25,000.000 $27,500.000 $25,000.000
SET (TY II) (DES 1) (RCP) (4: 1) (C)
EA 12.000 $1,800.000 $2,500.000 $3,500.000 $2,035.000 $2,000.000
SET (TY II) (DES 1) (RCP) (6: 1) (C)
EA 22.000 $2,000.000 $2,600.000 $4,000.000 $2,200.000 $2,000.000
SET (TY II) (DES 1) (RCP) (6: 1) (P)
EA 31.000 $2,100.000 $2,750.000 $4,500.000 $2,200.000 $2,000.000
SET (TY II) (DES 3) (RCP) (4: 1) (C)
EA 8.000 $3,100.000 $3,300.000 $7,500.000 $3,300.000 $3,000.000
SET (TY II) (DES 3) (RCP) (6: 1) (C)
EA 14.000 $4,500.000 $3,700.000 $8,000.000 $4,950.000 $4,500.000
SET (TY II) (DES 3) (RCP) (6: 1) (P)
EA 4.000 $4,500.000 $3,600.000 $8,500.000 $3,300.000 $3,000.000
SET (TY II) (DES 4) (RCP) (4: 1) (C)
EA 8.000 $5,500.000 $4,000.000 $10,000.000 $6,050.000 $5,500.000
SET (TY II) (DES 4) (RCP) (6: 1) (C)
EA 10.000 $5,500.000 $4,200.000 $11,000.000 $8,415.000 $7,700.000
REMOV STR (SET)
EA 36.000 $900.000 $2,600.000 $2,500.000 $1,100.000 $1,000.000
REMOV STR (PIPE)
LF 1,318.000 $50.000 $36.000 $40.000 $16.500 $20.000
REMOV STR (PIPE)
EA 4.000 $1,800.000 $1,500.000 $3,000.000 $1,100.000 $1,000.000
MOBILIZATION
LS 1.000 $1,081,616.000 $530,000.000 $1,200,000.000 $1,164,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $13,500.000 $11,000.000 $35,000.000 $24,000.000 $75,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 985.000 $6.000 $4.000 $10.000 $11.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 985.000 $2.000 $2.000 $5.000 $1.100 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,753.000 $6.000 $4.000 $8.000 $11.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,753.000 $2.000 $5.000 $3.000 $1.100 $1.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $10,000.000 $5,000.000 $10,000.000 $12,000.000 $6,000.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 390.000 $25.000 $20.000 $100.000 $60.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,730.000 $13.000 $20.000 $55.000 $46.000 $15.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 390.000 $25.000 $20.000 $100.000 $60.000 $20.000
DRIVEWAYS (ACP)
SY 2,308.000 $45.000 $120.000 $55.000 $45.000 $35.000
DRIVEWAYS (SURF TREAT)
SY 1,640.000 $40.000 $50.000 $40.000 $75.000 $20.000
DRIVEWAYS (BASE)
SY 453.000 $35.000 $25.000 $30.000 $42.000 $45.000
RUMBLE STRIPS (SHOULDER)
LF 67,390.000 $0.200 $0.750 $0.150 $0.280 $0.250
RUMBLE STRIPS (CENTERLINE)
LF 33,713.000 $0.200 $1.000 $0.200 $0.400 $0.350
MTL W-BEAM GD FEN (TIM POST)
LF 325.000 $30.000 $105.000 $40.000 $32.730 $30.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 25.000 $85.000 $105.000 $75.000 $59.680 $55.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,800.000 $5,000.000 $5,000.000 $3,712.500 $3,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 16.000 $2,500.000 $15,000.000 $3,000.000 $1,160.970 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,750.000 $7,500.000 $2,000.000 $1,160.970 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $22,000.000 $15,000.000 $11,850.390 $8,000.000
WIRE FENCE (TY A)
LF 30.000 $25.000 $250.000 $75.000 $96.700 $100.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $660.000 $1,500.000 $600.000 $550.000 $600.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 2.000 $300.000 $2,500.000 $500.000 $330.000 $350.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $1,010.000 $1,200.000 $1,000.000 $847.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $1,050.000 $1,200.000 $1,000.000 $880.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,400.000 $1,300.000 $1,200.000 $1,045.000 $1,300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 29.000 $570.000 $600.000 $600.000 $544.500 $350.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 4.000 $660.000 $620.000 $600.000 $550.000 $800.000
REMOVE SM RD SN SUP&AM
EA 43.000 $130.000 $300.000 $200.000 $110.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $500.000 $50.000 $47.300 $44.950
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 29.000 $85.000 $65.000 $100.000 $71.500 $135.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 8,380.000 $1.000 $0.750 $2.500 $2.200 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 7,042.000 $2.500 $1.500 $2.000 $0.700 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 627.000 $3.000 $2.500 $3.000 $0.880 $2.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 90,870.000 $0.500 $0.500 $0.500 $0.280 $0.230
REFL PAV MRK TY II (W) 24" (SLD)
LF 192.000 $9.000 $11.000 $15.000 $3.300 $3.550
REFL PAV MRK TY II (Y) 4" (SLD)
LF 108,152.000 $0.500 $0.500 $0.500 $0.310 $0.230
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 4,341.000 $1.500 $0.600 $1.000 $0.680 $0.900
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 67,290.000 $1.500 $0.600 $0.800 $0.680 $0.870
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 510.000 $1.000 $0.600 $1.000 $1.050 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 61,616.000 $1.500 $0.600 $0.900 $0.680 $0.870
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 152.000 $25.000 $25.000 $25.000 $16.500 $25.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $300.000 $1,200.000 $800.000 $330.000 $257.000
REFL PAV MRKR TY I-C
EA 254.000 $5.000 $5.000 $7.000 $7.700 $5.000
REFL PAV MRKR TY II-A-A
EA 829.000 $5.000 $4.800 $7.000 $6.600 $5.000
ELIM EXT PAV MRK & MRKS (4")
LF 136,450.000 $0.750 $0.520 $0.600 $0.420 $0.520
ELIM EXT PAV MRK & MRKS (24")
LF 192.000 $55.000 $12.000 $6.000 $2.640 $3.650
SP MIXES SP-C SAC-B PG70-22
TON 25,764.000 $145.000 $130.000 $135.000 $169.000 $160.000
TACK COAT
GAL 19,538.000 $6.000 $8.500 $6.000 $6.400 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 206.000 $160.000 $250.000 $250.000 $220.000 $200.000
TMA (STATIONARY)
DAY 250.000 $300.000 $350.000 $400.000 $360.000 $250.000
TMA (MOBILE OPERATION)
DAY 120.000 $380.000 $500.000 $119.660 $200.000 $950.000
Totals: $11,888,216.350 $12,314,224.400 $12,958,913.000 $14,051,467.330 $15,252,078.430