Show Job Controls
Bid Cobra

NOLAN FM 1856 (0488-01-017)

Items: 60

County: NOLAN
Length: N/A
Highway: FM 1856
District: ABILENE
Control Number: 0488-01-017
DBE Goal: N/A
Project: CC 488-1-17
Guaranty: N/A
Time: 101 WORKING DAYS
Engineer's Estimate: $1,419,697.40
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: REHAB ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (6)
E
Engineer's Estimate
$1,419,697.40
$1,166,773.35
Over/Under Est: -17.82% -$252,924.05
$1,213,189.36
Over/Under Est: -14.55% -$206,508.04
Amt Left: 3.98% $46,416.01
$1,224,963.10
Over/Under Est: -13.72% -$194,734.30
Amt Left: 4.99% $58,189.75
Delta: -0.97% -$11,773.74
$1,489,817.35
Over/Under Est: 4.94% $70,119.95
Amt Left: 27.69% $323,044.00
Delta: -21.62% -$264,854.25
Over/Under Est: 8.46% $120,093.10
Amt Left: 31.97% $373,017.15
Delta: -3.35% -$49,973.15
Over/Under Est: 27.8% $394,640.90
Amt Left: 55.5% $647,564.95
Delta: -17.83% -$274,547.80

Bid Items & Bid Tabulations

60 Total 0 of 60
NOLAN  |  FM 1856  |  ABILENE  |  0488-01-017  |  09/01/2021  |  $1,419,697.40  |  CC 488-1-17  |  REHAB ROADWAY  |  101 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
J. H. STRAIN & SONS, INC.
A. L. HELMCAMP, INC.
CK NEWBERRY, LLC
CONTRACT PAVING CO.
NOBLES ROAD CONSTRUCTION, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
PREPARING ROW
STA 13.370 $1,500.000 $5,000.000 $5,000.000 $2,500.000 $2,000.000 $6,500.000 $2,673.950
REMOVING CONC (RIPRAP)
SY 30.000 $30.000 $25.000 $35.000 $50.000 $39.000 $65.000 $107.270
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 4,699.000 $7.000 $4.250 $7.500 $2.250 $7.000 $15.000 $12.090
EXCAVATION (ROADWAY)
CY 18,945.000 $25.000 $14.000 $17.000 $10.000 $12.000 $22.000 $16.930
EMBANKMENT (FINAL)(DENS CONT)(TY D)
CY 1,193.000 $15.000 $11.000 $11.000 $10.000 $25.000 $28.000 $23.600
FURNISHING AND PLACING TOPSOIL (4")
STA 12.970 $3,500.000 $630.000 $1,700.000 $1,500.000 $1,000.000 $1,000.000 $3,451.280
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 11,348.000 $0.500 $0.500 $0.250 $0.250 $1.500 $0.450 $0.530
DRILL SEED (TEMP)(WARM OR COOL)
SY 11,348.000 $0.300 $0.500 $0.220 $0.200 $1.500 $0.450 $0.450
VEGETATIVE WATERING
MG 91.000 $10.000 $65.000 $18.000 $25.000 $50.000 $100.000 $60.050
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 11,348.000 $5.000 $1.250 $1.200 $2.000 $3.000 $2.000 $2.060
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,516.000 $75.000 $56.000 $45.000 $70.000 $74.000 $52.000 $83.350
PRIME COAT (AE-P)
GAL 1,516.000 $5.000 $5.000 $4.250 $5.000 $7.000 $7.000 $5.490
ASPH (MULTI OPTION)
GAL 2,547.000 $5.000 $6.000 $4.000 $4.500 $8.000 $7.000 $4.990
AGGR(TY-B GR-3 SAC-B)
CY 49.000 $100.000 $200.000 $350.000 $250.000 $200.000 $200.000 $292.690
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 76.000 $210.000 $75.000 $135.000 $200.000 $110.000 $250.000 $348.090
RIPRAP (CONC)(5 IN)
CY 14.000 $750.000 $850.000 $893.000 $900.000 $575.000 $1,100.000 $1,009.090
CMP (GAL STL 24 IN)
LF 169.000 $110.000 $110.000 $237.000 $100.000 $75.000 $75.000 $126.770
CONC BOX CULV (7 FT X 7 FT)
LF 18.000 $900.000 $1,200.000 $2,100.000 $975.000 $750.000 $1,900.000 $2,418.330
SET (TY I)(S= 7 FT)(HW= 9 FT)(3:1) (C)
EA 1.000 $30,000.000 $18,000.000 $26,250.000 $35,000.000 $15,000.000 $58,000.000 $47,621.400
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 2.000 $3,500.000 $1,400.000 $2,100.000 $2,500.000 $1,600.000 $2,100.000 $1,368.300
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 2.000 $3,500.000 $1,600.000 $3,150.000 $2,600.000 $1,600.000 $2,500.000 $1,729.490
REMOV STR (WINGWALL)
EA 1.000 $1,000.000 $1,000.000 $2,625.000 $3,000.000 $1,800.000 $7,500.000 $4,115.890
MOBILIZATION
LS 1.000 $125,000.000 $110,000.000 $120,000.000 $275,000.000 $449,000.000 $148,000.000 $536,662.670
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $14,250.000 $8,000.000 $10,000.000 $6,000.000 $10,400.000 $1,432.290
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 32.000 $50.000 $70.000 $57.000 $75.000 $50.000 $66.000 $84.200
ROCK FILTER DAMS (REMOVE)
LF 32.000 $10.000 $15.000 $12.000 $30.000 $20.000 $16.000 $49.060
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 634.000 $5.000 $7.500 $4.000 $6.000 $3.750 $4.500 $10.430
BIODEG EROSN CONT LOGS (REMOVE)
LF 634.000 $1.500 $1.500 $1.050 $3.000 $2.000 $2.200 $4.360
DRIVEWAYS (ACP)
SY 753.000 $55.000 $75.000 $55.000 $65.000 $88.000 $68.000 $92.460
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 1.000 $700.000 $230.000 $263.000 $300.000 $207.000 $230.000 $395.770
CONDT (PVC) (SCH 80) (1")
LF 40.000 $20.000 $16.000 $16.000 $20.000 $15.000 $17.000 $19.520
ELEC CONDR (NO.12) INSULATED
LF 92.000 $2.000 $102.000 $1.100 $2.000 $1.000 $1.500 $2.410
ELEC CONDR (NO.8) BARE
LF 46.000 $2.000 $2.200 $2.150 $3.000 $2.000 $2.500 $4.830
GROUND BOX TY BATTERY (162915)W/APRON
EA 2.000 $1,500.000 $3,850.000 $3,675.000 $4,000.000 $3,500.000 $4,000.000 $3,910.390
ALUMINUM SIGNS (TY A)
SF 47.000 $35.000 $35.000 $30.500 $35.000 $29.000 $50.000 $52.070
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $650.000 $644.000 $631.000 $700.000 $585.000 $650.000 $847.730
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 12.000 $950.000 $740.000 $856.000 $800.000 $672.000 $750.000 $944.470
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $800.000 $985.000 $1,040.000 $1,050.000 $895.000 $1,000.000 $1,779.410
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
EA 1.000 $2,000.000 $1,015.000 $961.000 $1,075.000 $925.000 $1,100.000 $1,843.370
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,500.000 $1,000.000 $1,355.000 $1,075.000 $912.000 $1,100.000 $2,199.770
REMOVE SM RD SN SUP&AM
EA 12.000 $75.000 $100.000 $132.000 $125.000 $250.000 $120.000 $147.560
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 17.000 $125.000 $60.000 $79.000 $65.000 $55.000 $65.000 $205.100
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $100.000 $60.000 $82.000 $65.000 $55.000 $65.000 $90.690
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,430.000 $2.000 $1.100 $1.050 $1.100 $3.000 $1.500 $1.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 2,700.000 $2.000 $1.100 $1.050 $1.100 $10.000 $1.500 $1.140
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 135.000 $2.000 $2.500 $0.900 $1.750 $1.710 $1.500 $3.670
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,639.000 $1.000 $2.200 $1.600 $1.750 $1.000 $1.500 $1.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,585.000 $1.000 $2.200 $1.600 $1.750 $1.200 $1.500 $1.700
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 150.000 $50.000 $33.000 $27.000 $30.000 $15.000 $30.000 $28.310
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $750.000 $880.000 $893.000 $1,000.000 $1,500.000 $950.000 $995.390
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
EA 8.000 $50.000 $44.000 $53.000 $55.000 $40.000 $60.000 $70.100
REFL PAV MRKR TY II-A-A
EA 66.000 $5.000 $22.000 $11.000 $12.000 $10.000 $15.000 $12.830
VEH SIG SEC (12")LED(YEL)
EA 4.000 $400.000 $385.000 $368.000 $55.000 $350.000 $385.000 $415.190
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,500.000 $11,000.000 $10,500.000 $450.000 $10,000.000 $11,000.000 $11,060.390
SP MIXES SP-D SAC-B PG70-22
TON 1,294.000 $120.000 $110.000 $110.000 $150.000 $120.000 $138.000 $126.360
TACK COAT
GAL 595.000 $5.000 $3.000 $3.000 $5.000 $12.000 $6.000 $6.560
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $15,000.000 $17,000.000 $12,000.000 $6,000.000 $11,000.000 $16,500.000 $11,655.000
TMA (STATIONARY)
DAY 11.000 $500.000 $300.000 $350.000 $250.000 $400.000 $550.000 $840.700
TMA (MOBILE OPERATION)
DAY 12.000 $500.000 $300.000 $500.000 $250.000 $400.000 $550.000 $1,355.180
SOLAR POWERED LED WARNING SIGN
EA 1.000 $1,000.000 $3,600.000 $4,200.000 $4,000.000 $3,263.000 $4,400.000 $6,646.520
Totals: $1,419,697.400 $1,166,773.350 $1,213,189.360 $1,224,963.100 $1,489,817.350 $1,539,790.500 $1,814,338.303