NOLAN SH 70 (0264-02-029)

Items: 33

County: NOLAN
Length: N/A
Highway: SH 70
District: ABILENE
Control Number: 0264-02-029
DBE Goal: 300.0%
Project: F 2024(927)
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $5,667,844.93
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
RYAN SAYLES
LARISSA HALFORD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$5,667,844.93
1
$5,657,526.63
Over/Under Est: -0.18% -$10,318.30
$5,979,798.55
Over/Under Est: 5.5% $311,953.62
Amt Left: 5.7% $322,271.92
Over/Under Est: 27.13% $1,537,956.07
Amt Left: 27.37% $1,548,274.37
Delta: -20.50% -$1,226,002.45
Subcontractor Percentage Amount
HJC FARMS, INC. 5.61% $317,387.24
DOUBLE A CONTRACTING, L.P. 5.01% $283,442.08
TEXOP CONSTRUCTION 0.80% $45,260.21
CONTRACTORS SERVICE, LTD. 0.31% $17,538.33
Total: 11.73% $663,627.86

Bid Items & Bid Tabulations

33 Total 0 of 33
NOLAN  |  SH 70  |  ABILENE  |  0264-02-029  |  03/05/2024  |  $5,667,844.93  |  F 2024(927)  |  RESURF ROADWAY  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
REECE ALBERT, INC.
BONTKE BROTHERS CONSTRUCTION COMPANY
BACKFILL (TY A)
STA 797.100 $300.000 $235.880 $299.340 $400.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 3,398.000 $55.000 $60.280 $85.470 $55.000
PLANE ASPH CONC PAV(1" TO 2")
SY 6,660.000 $4.000 $12.750 $9.720 $10.000
MOBILIZATION
LS 1.000 $500,000.000 $352,704.550 $357,228.680 $650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $20,000.000 $29,291.030 $2,968.630 $8,000.000
RUMBLE STRIPS (SHOULDER)
LF 109,229.000 $0.220 $0.210 $0.080 $1.000
RUMBLE STRIPS (CENTERLINE)
LF 68,440.000 $0.220 $0.290 $0.080 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,950.000 $25.000 $27.440 $27.680 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,350.000 $2,660.000 $2,683.080 $2,750.000
REMOVE METAL BEAM GUARD FENCE
LF 5,025.000 $3.000 $2.240 $2.260 $2.500
REMOVE TERMINAL ANCHOR SECTION
EA 21.000 $350.000 $224.000 $225.940 $230.000
RM MTL BM GD FEN TRANS (T101)
EA 8.000 $350.000 $224.000 $225.940 $230.000
GUARDRAIL END TREATMENT (INSTALL)
EA 38.000 $3,300.000 $3,472.000 $3,502.120 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $350.000 $224.000 $225.940 $230.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 104.000 $45.000 $53.200 $53.660 $55.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,491.000 $1.500 $3.580 $2.440 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 5,666.000 $1.500 $3.920 $2.120 $1.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 3,892.000 $1.200 $1.680 $1.240 $1.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,445.000 $0.850 $0.950 $1.130 $1.500
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 157,662.000 $0.850 $0.840 $0.730 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 8,741.000 $0.850 $0.950 $1.130 $1.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 99,913.000 $0.850 $0.840 $0.730 $1.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 100.000 $18.000 $20.160 $21.460 $10.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 20.000 $500.000 $644.000 $677.830 $1,800.000
PREFAB PAV MRK TY C (W) (NUMBER)
EA 1.000 $325.000 $358.400 $129.920 $1,800.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $650.000 $392.000 $395.400 $2,000.000
REFL PAV MRKR TY I-C
EA 122.000 $4.000 $4.480 $9.040 $3.000
REFL PAV MRKR TY II-A-A
EA 1,716.000 $5.000 $4.480 $7.910 $3.000
TOM-C PG76-22 SAC-B
TON 18,431.000 $200.000 $207.000 $230.420 $250.000
TACK COAT
GAL 33,571.000 $7.000 $4.560 $3.320 $10.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $20.000 $28.000 $33.890 $2.000
TMA (STATIONARY)
DAY 101.000 $300.000 $25.270 $250.950 $500.000
TMA (MOBILE OPERATION)
DAY 20.000 $600.000 $456.830 $701.600 $1,000.000
Totals: $5,667,844.930 $5,657,526.638 $5,979,798.554 $7,205,801.000