NOLAN IH 20 (0006-03-145)

Items: 66

County: NOLAN
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0006-03-145
DBE Goal: N/A
Project: BR 2023(687)
Guaranty: N/A
Time: 161 WORKING DAYS
Engineer's Estimate: $2,495,955.70
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
BRYCE TURENTINE
CHAD W CARTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$2,495,955.70
$2,739,348.25
Over/Under Est: 9.75% $243,392.55
Over/Under Est: 10.31% $257,438.70
Amt Left: 0.51% $14,046.15
Over/Under Est: 12.11% $302,196.00
Amt Left: 2.15% $58,803.45
Delta: -1.63% -$44,757.30
Over/Under Est: 14.9% $371,834.50
Amt Left: 4.69% $128,441.95
Delta: -2.49% -$69,638.50
Over/Under Est: 31.68% $790,743.30
Amt Left: 19.98% $547,350.75
Delta: -14.61% -$418,908.80
Subcontractor Percentage Amount
HJC FARMS, INC. 15.33% $419,942.09
BECK-REIT & SONS, LTD. 10.96% $300,232.57
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 5.94% $162,717.29
LINEAR TRAFFIC MARKINGS LLC 2.26% $61,909.27
GIBSON & ASSOCIATES, INC. 1.88% $51,499.75
FC TRAFFIC CONTROL, INC. 1.47% $40,268.42
Total: 37.84% $1,036,569.39

Bid Items & Bid Tabulations

66 Total 0 of 66
NOLAN  |  IH 20  |  ABILENE  |  0006-03-145  |  05/05/2023  |  $2,495,955.70  |  BR 2023(687)  |  BRIDGE MAINT  |  161 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SCR CIVIL CONSTRUCTION, LLC
PATHFIELD INVESTMENTS LLC
MB WESTERN INDUSTRIAL CONTRACTING COMPANY
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
CROSS PLUS CONSTRUCTION, LLC
PREPARING ROW
AC 0.150 $20,000.000 $67,000.000 $20,000.000 $50,000.000 $32,868.000 $5,500.000
REMOVING CONC (RIPRAP)
SY 174.000 $45.000 $111.000 $120.000 $50.000 $47.000 $275.000
FLOWABLE BACKFILL
CY 52.000 $400.000 $700.000 $700.000 $250.000 $533.000 $275.000
CL B CONC (FLUME)
CY 11.000 $950.000 $3,000.000 $1,200.000 $1,000.000 $2,455.000 $550.000
PRECAST CL S CONC PEDESTAL FOR BRG REP
EA 24.000 $2,500.000 $865.000 $5,000.000 $5,000.000 $507.000 $6,600.000
PENETRATING CONCRETE SURFACE TREATMENT
SY 2,884.000 $20.000 $11.000 $25.000 $11.150 $22.000 $18.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,930.000 $160.000 $240.000 $120.000 $210.740 $185.000 $193.000
RIRRAP (STONE COMMON)(DRY)(15 IN)
CY 1,427.000 $160.000 $207.000 $230.000 $200.000 $246.000 $248.000
RIPRAP (MOW STRIP)(4 IN)
CY 98.000 $700.000 $770.000 $800.000 $550.000 $770.000 $550.000
ELASTOMERIC BEARING (LAMINATED)
EA 48.000 $2,500.000 $150.000 $7,500.000 $2,000.000 $210.000 $1,100.000
ELASTOMERIC BEARING (SPECIAL)
EA 24.000 $3,000.000 $1,500.000 $6,700.000 $5,000.000 $1,403.000 $2,200.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 592.000 $40.000 $82.000 $85.000 $46.170 $47.000 $83.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 490.000 $50.000 $102.000 $90.000 $58.320 $46.000 $50.000
STR STEEL (PEDESTAL)
LB 3,816.000 $70.000 $18.000 $32.000 $30.000 $10.000 $55.000
RETROFIT RAIL (TY SSTR)
LF 686.000 $225.000 $305.000 $35.000 $306.630 $345.000 $275.000
RETROFIT RAIL (TY C223)
LF 382.000 $300.000 $525.000 $45.000 $550.000 $606.000 $275.000
HEADER TYPE EXPANSION JOINT
CF 20.000 $425.000 $985.000 $300.000 $923.400 $946.000 $550.000
JOINT SEALANT
LF 76.000 $25.000 $102.000 $65.000 $25.520 $30.000 $55.000
RAISING EXIST STRUCT
LS 3.000 $27,500.000 $54,500.000 $10,000.000 $75,000.000 $40,679.000 $82,500.000
MOBILIZATION
LS 1.000 $217,087.000 $270,000.000 $200,000.000 $300,000.000 $286,746.000 $220,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $12,000.000 $10,400.000 $12,000.000 $2,500.000 $14,507.000 $6,600.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $6,500.000 $8,500.000 $7,500.000 $7,290.000 $8,210.000 $8,250.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 690.000 $25.000 $30.000 $35.000 $25.000 $30.000 $83.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 510.000 $15.000 $30.000 $10.000 $20.000 $32.000 $83.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 690.000 $20.000 $30.000 $10.000 $10.000 $30.000 $83.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,225.000 $35.000 $29.150 $43.000 $29.550 $32.000 $44.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,700.000 $2,502.500 $6,000.000 $2,536.630 $4,245.000 $2,750.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,700.000 $1,897.500 $1,800.000 $1,923.380 $2,068.000 $1,650.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $1,200.000 $1,292.500 $1,800.000 $1,310.130 $1,518.000 $5,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,225.000 $4.000 $2.750 $5.000 $2.790 $5.000 $6.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $350.000 $275.000 $1,250.000 $278.750 $593.000 $550.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 6.000 $390.000 $275.000 $400.000 $278.750 $364.000 $275.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,500.000 $3,657.500 $3,500.000 $3,707.380 $3,439.000 $4,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $425.000 $275.000 $300.000 $278.750 $364.000 $550.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $3,000.000 $2,750.000 $1,200.000 $2,787.500 $2,843.000 $5,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,400.000 $1,500.000 $300.000 $1,393.750 $1,593.000 $2,750.000
CRASH CUSH ATTEN (INSTL)(S)(W)(TL3)
EA 2.000 $11,000.000 $8,800.000 $12,000.000 $8,920.000 $8,343.000 $44,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $30.000 $26.400 $25.000 $26.760 $26.000 $6.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $80.000 $110.000 $95.000 $111.500 $102.000 $165.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $40.000 $32.000 $100.000 $5.000 $30.000 $11.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 8.000 $30.000 $32.000 $105.000 $32.340 $30.000 $11.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
EA 3.000 $30.000 $32.000 $100.000 $32.340 $31.000 $11.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 3.000 $30.000 $26.400 $100.000 $26.760 $26.000 $11.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
EA 3.000 $30.000 $26.400 $100.000 $26.760 $26.000 $11.000
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 75.000 $5.000 $11.000 $8.000 $4.460 $10.000 $11.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 173.000 $6.000 $6.600 $8.000 $4.460 $6.000 $11.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 626.000 $5.500 $6.600 $8.000 $4.460 $7.000 $11.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 521.000 $4.500 $2.200 $8.000 $3.900 $3.000 $11.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 2,105.000 $4.000 $2.200 $8.000 $3.900 $2.000 $11.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 3,375.000 $1.000 $1.650 $8.000 $1.510 $2.000 $11.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,534.000 $0.800 $1.650 $7.000 $1.510 $2.000 $11.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 24.000 $40.000 $27.500 $50.000 $27.880 $28.000 $11.000
REFL PAV MRKR TY II-A-A
EA 107.000 $6.000 $5.250 $10.000 $5.580 $8.000 $11.000
REFL PAV MRKR TY II-C-R
EA 19.000 $7.000 $5.250 $10.000 $5.580 $8.000 $11.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,772.000 $0.500 $1.650 $7.700 $0.970 $2.000 $11.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 320.000 $60.000 $55.000 $120.000 $37.910 $126.000 $66.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 861.000 $100.000 $49.000 $120.000 $42.370 $91.000 $66.000
REP STL BRIDGE MEMBER (BEAM)
EA 1.000 $20,000.000 $58,000.000 $110,000.000 $30,000.000 $67,636.000 $55,000.000
STEEL BRIDGE ZONE PAINTING REF STR #1
EA 1.000 $70,000.000 $73,700.000 $25,000.000 $79,705.000 $105,767.000 $85,800.000
STEEL BRIDGE ZONE PAINTING REF STR #2
EA 1.000 $70,000.000 $73,700.000 $25,000.000 $79,705.000 $105,767.000 $85,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $19,000.000 $300.000 $10,000.000 $21,479.000 $16,500.000
TMA (STATIONARY)
DAY 41.000 $300.000 $350.000 $400.000 $250.000 $785.000 $275.000
TMA (MOBILE OPERATION)
DAY 14.000 $750.000 $500.000 $500.000 $250.000 $1,690.000 $1,100.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 1
LS 1.000 $1,000.000 $10,000.000 $15,000.000 $5,000.000 $10,122.000 $11,000.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 2
LS 1.000 $10,000.000 $10,000.000 $15,000.000 $5,000.000 $14,772.000 $11,000.000
REML & DESPL DRIFTWOOD & DEBRIS-SITE 3
LS 1.000 $5,000.000 $10,000.000 $15,000.000 $5,000.000 $10,222.000 $11,000.000
Totals: $2,495,955.700 $2,739,348.250 $2,753,394.400 $2,798,151.700 $2,867,790.200 $3,286,699.000