PREPARING ROW
|
STA
|
11.000
|
$3,500.000
|
$4,545.000
|
$10,000.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
94.000
|
$10.000
|
$25.000
|
$25.000
|
|
|
REMOVE STAB BASE AND ASPH PAV (1"-3")
|
SY
|
2,878.000
|
$10.000
|
$4.950
|
$7.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
430.000
|
$12.000
|
$33.500
|
$65.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
1,802.000
|
$10.000
|
$15.000
|
$13.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
4,729.000
|
$24.000
|
$30.000
|
$29.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,739.000
|
$0.150
|
$0.520
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,739.000
|
$0.150
|
$0.520
|
$2.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
3,478.000
|
$0.380
|
$0.780
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
30.000
|
$17.000
|
$130.000
|
$100.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$40.000
|
$95.000
|
$100.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
4,522.000
|
$18.000
|
$26.000
|
$50.000
|
|
|
REWRK BS MATL (TY B)(10")(DENS CONT)
|
SY
|
2,878.000
|
$2.500
|
$8.000
|
$2.570
|
|
|
CEMENT
|
TON
|
51.000
|
$180.000
|
$266.000
|
$200.000
|
|
|
CEMENT TREAT (NEW BASE) (8")
|
SY
|
4,522.000
|
$2.500
|
$7.600
|
$5.680
|
|
|
ASPH (RC-250)
|
GAL
|
887.000
|
$4.000
|
$7.000
|
$7.000
|
|
|
AGGR(TY-L GR-5 SAC-B)
|
CY
|
36.000
|
$145.000
|
$780.000
|
$400.000
|
|
|
CEM STABIL BKFL
|
CY
|
100.000
|
$90.000
|
$196.000
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,775.000
|
$26.000
|
$60.000
|
$33.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
1,120.000
|
$143.000
|
$135.000
|
$243.000
|
|
|
PRESTR CONC PIL (20 IN SQ)
|
LF
|
432.000
|
$165.000
|
$202.000
|
$353.000
|
|
|
CL C CONC (ABUT)
|
CY
|
50.800
|
$1,296.000
|
$1,792.000
|
$1,147.000
|
|
|
CL C CONC (CAP)
|
CY
|
21.300
|
$1,346.000
|
$3,230.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
5,062.000
|
$21.000
|
$42.000
|
$25.000
|
|
|
APPROACH SLAB
|
CY
|
70.700
|
$350.000
|
$612.000
|
$622.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
654.000
|
$150.000
|
$207.000
|
$331.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
374.000
|
$184.000
|
$181.000
|
$332.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$450.000
|
$598.000
|
$641.000
|
|
|
RAIL (TY SSTR)
|
LF
|
260.000
|
$42.000
|
$145.000
|
$150.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
91.000
|
$110.000
|
$200.000
|
$156.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$36,000.000
|
$40,000.000
|
$50,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,000.000
|
$215,480.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$5,000.000
|
$1,600.000
|
$1,900.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
60.000
|
$60.000
|
$53.000
|
$168.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
60.000
|
$10.000
|
$16.000
|
$22.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,060.000
|
$3.000
|
$3.250
|
$9.540
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,060.000
|
$1.000
|
$1.050
|
$2.490
|
|
|
CONSTRUCTING DETOURS
|
SY
|
316.000
|
$69.000
|
$130.000
|
$300.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
10.000
|
$2,500.000
|
$5,727.000
|
$7,063.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,020.000
|
$40.000
|
$66.000
|
$91.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
840.000
|
$6.000
|
$11.750
|
$16.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,020.000
|
$10.000
|
$16.750
|
$24.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$30.000
|
$30.000
|
$32.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,500.000
|
$2,113.000
|
$1,283.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
720.000
|
$3.000
|
$2.550
|
$10.690
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$2,980.000
|
$4,236.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$253.000
|
$1,283.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,800.000
|
$1,905.000
|
$2,567.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$950.000
|
$925.000
|
$320.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,000.000
|
$9,900.000
|
$26,967.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$700.000
|
$678.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$778.000
|
$158.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$120.000
|
$102.000
|
$0.710
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
2.000
|
$24.000
|
$15.500
|
$3.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$32.000
|
$37.500
|
$0.710
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,204.000
|
$0.800
|
$1.510
|
$0.320
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
88.000
|
$8.000
|
$26.150
|
$0.870
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
564.000
|
$0.800
|
$1.880
|
$0.900
|
|
|
PAVEMENT SEALER 4"
|
LF
|
600.000
|
$0.150
|
$0.660
|
$0.900
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,845.000
|
$0.500
|
$1.670
|
$0.870
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
360.000
|
$0.500
|
$1.670
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
697.000
|
$0.500
|
$1.670
|
$3.000
|
|
PREFAB PAV MRK TY C (W) (12") (SLD)
|
LF
|
32.000
|
$12.000
|
$22.500
|
$17.900
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
28.000
|
$3.500
|
$8.050
|
$6.420
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,783.000
|
$0.400
|
$2.000
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
600.000
|
$0.050
|
$2.530
|
$1.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
366.000
|
$220.000
|
$187.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
266.000
|
$4.000
|
$12.000
|
$12.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$14,500.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
16.000
|
$350.000
|
$355.000
|
$600.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$450.000
|
$600.000
|
$600.000
|
|
Totals: |
$1,617,643.540
|
$2,254,911.000
|
$2,839,452.460
|