Show Job Controls
Bid Cobra

NAVARRO IH0045 (6461-84-001)

Items: 55

County: NAVARRO
Length: N/A
Highway: IH0045
District: DALLAS
Control Number: 6461-84-001
DBE Goal: 0.0%
Project: RMC - 646184001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $1,065,700.00
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
JUAN PAREDES
JOSEPH LANOUE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,065,700.00
$635,909.00
Over/Under Est: -40.33% -$429,791.00
Over/Under Est: 18.16% $193,580.00
Amt Left: 98.03% $623,371.00
Over/Under Est: 22.88% $243,880.00
Amt Left: 105.94% $673,671.00
Delta: -3.99% -$50,300.00

Bid Items & Bid Tabulations

55 Total 0 of 55
NAVARRO  |  IH0045  |  DALLAS  |  6461-84-001  |  05/02/2024  |  $1,065,700.00  |  RMC - 646184001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
HAZMAT INTERNATIONAL, INC.
MARCOM'S MOWING SERVICE, LLC
REMOVING CONC (CURB)
LF 50.000 $13.000 $10.000 $5.000 $20.000
RIPRAP (MOW STRIP)(4 IN)
CY 75.000 $690.000 $450.000 $650.000 $550.000
MOBILIZATION (CALLOUT)
EA 260.000 $520.000 $1.000 $1.000 $1.000
CONC CURB (TY II)
LF 50.000 $45.000 $50.000 $15.000 $60.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 15.000 $30.000 $20.000 $30.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 15.000 $30.000 $2.000 $30.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 15.000 $30.000 $15.000 $30.000 $100.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 350.000 $20.000 $2.000 $30.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 35.000 $50.000 $100.000 $110.000 $110.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 35.000 $50.000 $20.000 $50.000 $15.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 81.000 $50.000 $20.000 $30.000 $60.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 81.000 $50.000 $2.000 $30.000 $60.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 81.000 $50.000 $20.000 $30.000 $50.000
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
EA 81.000 $50.000 $2.000 $30.000 $60.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 81.000 $50.000 $2.000 $30.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 200.000 $50.000 $15.000 $85.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
EA 200.000 $50.000 $15.000 $85.000 $100.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 200.000 $55.000 $15.000 $85.000 $100.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $55.000 $15.000 $85.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)(GF2)(BI)
EA 3,344.000 $10.000 $2.000 $30.000 $45.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,500.000 $25.000 $40.000 $30.000 $32.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 10.000 $100.000 $200.000 $30.000 $60.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 10.000 $80.000 $50.000 $40.000 $60.000
REM/REPAIR RAIL ELEMENT (CURVED RAIL)
LF 300.000 $30.000 $20.000 $35.000 $50.000
REM / REPL TIMBER POST W / O CONC FND
EA 320.000 $25.000 $1.000 $50.000 $48.000
REM / REPL STEEL POST W / O CONC FND
EA 125.000 $7.000 $10.000 $100.000 $70.000
REPAIR STEEL POST WITH BASE PLATE
EA 3.000 $100.000 $200.000 $300.000 $350.000
REALIGN POSTS
EA 200.000 $100.000 $1.000 $40.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 425.000 $45.000 $1.000 $30.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $40.000 $15.000 $30.000 $40.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 80.000 $75.000 $1.000 $30.000 $500.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 75.000 $3,200.000 $4,500.000 $4,500.000 $3,700.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $1,400.000 $800.000 $1,500.000 $1,250.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $200.000 $1.000 $200.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 25.000 $75.000 $10.000 $200.000 $80.000
REPLACE SGT CABLE ANCHOR
EA 25.000 $55.000 $10.000 $250.000 $80.000
REPLACE SGT STRUT
EA 14.000 $65.000 $10.000 $150.000 $80.000
REPLACE SGT OBJECT MARKER
EA 5.000 $45.000 $100.000 $75.000 $150.000
REMOVE AND REPLACE DAT
EA 3.000 $1,000.000 $1,200.000 $1,800.000 $1,250.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 250.000 $7.000 $1.000 $30.000 $30.000
REPLACE POSTS (TL-4)
EA 250.000 $225.000 $100.000 $325.000 $450.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $250.000 $100.000 $1,500.000 $325.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $200.000 $10.000 $25.000 $110.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 25.000 $1,125.000 $100.000 $6,000.000 $3,820.000
REPLACE CABLE (TL-4)
LF 1,000.000 $2.500 $1.000 $4.000 $5.000
CHECK / RE-TENSION CABLE
EA 20.000 $500.000 $2,000.000 $500.000 $250.000
REPAIR REACT (CYLINDERS)
EA 3.000 $3,000.000 $100.000 $3,000.000 $3,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 3.000 $25,000.000 $1,000.000 $35,000.000 $30,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $15,000.000 $10,000.000 $44,000.000 $45,000.000
REPAIR (FASTRACC) (BAY)
EA 5.000 $850.000 $100.000 $800.000 $500.000
REPAIR (SHORTRACC) (BAY)
EA 5.000 $850.000 $100.000 $100.000 $500.000
REPAIR (FASTRACC) (W) (BAY)
EA 5.000 $850.000 $100.000 $1,000.000 $500.000
REPAIR (SMTC) (N)
LF 81.000 $200.000 $50.000 $300.000 $500.000
REPAIR (SMTC) (W)
LF 30.000 $150.000 $50.000 $300.000 $500.000
TMA (STATIONARY)
DAY 260.000 $400.000 $1.000 $5.000 $150.000
Totals: $1,065,700.000 $635,909.000 $1,259,280.000 $1,309,580.000