Show Job Controls
Bid Cobra

NAVARRO FM1394 (6337-60-001)

Items: 19

County: NAVARRO
Length: N/A
Highway: FM1394
District: DALLAS
Control Number: 6337-60-001
DBE Goal: N/A
Project: RMC - 633760001
Guaranty: N/A
Time: 365 W
Engineer's Estimate: $126,652.00
Date: 03/12/2019 (7 years ago)
Contract Number: N/A
Type: CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$126,652.00
$164,499.00
Over/Under Est: 29.88% $37,847.00
Over/Under Est: 67.23% $85,142.00
Amt Left: 28.75% $47,295.00
Over/Under Est: 97% $122,858.00
Amt Left: 51.68% $85,011.00
Delta: -17.81% -$37,716.00
Over/Under Est: 97.1% $122,978.00
Amt Left: 51.75% $85,131.00
Delta: -0.05% -$120.00

Bid Items & Bid Tabulations

19 Total 0 of 19
NAVARRO  |  FM1394  |  DALLAS  |  6337-60-001  |  03/12/2019  |  $126,652.00  |  RMC - 633760001  |  CROSS DRAIN STRUCTS REPAIR OR REPL  |  365 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
TALBRAN ENTERPRISES LLC
BEAR CREEK CONTRACTING, LLC
CHAMPION INFRASTRUCTURE, LLC
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW
AC 1.000 $100.000 $1,000.000 $2,911.000 $3,500.000 $5,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 90.000 $57.000 $50.000 $69.000 $55.000 $50.000
BLOCK SODDING
SY 118.000 $25.000 $7.500 $35.000 $15.000 $10.000
FLOWABLE BACKFILL
CY 15.000 $302.400 $400.000 $264.000 $300.000 $250.000
CL A CONC (COLLAR)
EA 8.000 $1,314.000 $800.000 $1,372.000 $1,200.000 $2,500.000
RIPRAP (CONC)(5 IN)
CY 5.000 $380.000 $400.000 $450.000 $980.000 $1,000.000
RC PIPE (CL III)(36 IN)
LF 68.000 $139.000 $122.000 $190.000 $240.000 $100.000
RC PIPE (CL III)(42 IN)
LF 48.000 $3.000 $165.000 $225.000 $320.000 $250.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 3.000 $5,400.000 $5,000.000 $8,196.000 $7,500.000 $7,000.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $5,000.000 $7,000.000 $9,959.000 $7,200.000 $6,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 3.000 $7,000.000 $7,700.000 $9,220.000 $8,200.000 $9,000.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $7,000.000 $7,700.000 $12,989.000 $8,400.000 $10,000.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $8,000.000 $8,500.000 $11,455.000 $9,400.000 $11,000.000
CLEAN EXIST CULVERTS
EA 7.000 $486.000 $1,250.000 $1,688.000 $3,000.000 $1,500.000
REMOV STR (HEADWALL)
EA 3.000 $1,000.000 $1,000.000 $1,233.000 $6,500.000 $500.000
REMOV STR (PIPE)
LF 158.000 $21.000 $6.000 $11.000 $45.000 $50.000
MOBILIZATION
LS 1.000 $9,600.000 $15,000.000 $27,778.000 $20,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 50.000 $139.000 $200.000 $50.000 $150.000 $100.000
TMA (STATIONARY)
EA 2.000 $229.000 $10,000.000 $6,000.000 $16,000.000 $15,000.000
Totals: $126,652.000 $164,499.000 $211,794.000 $249,510.000 $249,630.000