Show Job Controls
Bid Cobra

NAVARRO FM 2555 (2682-01-024)

Items: 53

County: NAVARRO
Length: 1.8180 MILES
Highway: FM 2555
District: DALLAS
Control Number: 2682-01-024
DBE Goal: 0.0%
Project: C 2682-1-24
Guaranty: $41,000.00
Time: 36 WORKING DAYS
Engineer's Estimate: $2,046,631.06
Date: 12/03/2025 (6 months ago)
Contract Number: 12253212
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00196240
Project Description: FULL-DEPTH CONCRETE REPAIR, MILL AND INLAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
NOLAN DELHIERRO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,046,631.06
$1,627,075.18
Over/Under Est: -20.5% -$419,555.88
Over/Under Est: -17.67% -$361,631.06
Amt Left: 3.56% $57,924.82
Over/Under Est: -15.39% -$315,037.66
Amt Left: 6.42% $104,518.22
Delta: -2.77% -$46,593.40
Over/Under Est: -7.91% -$161,990.16
Amt Left: 15.83% $257,565.72
Delta: -8.84% -$153,047.50
Over/Under Est: -6.96% -$142,393.58
Amt Left: 17.03% $277,162.30
Delta: -1.04% -$19,596.58
Over/Under Est: -0.26% -$5,285.06
Amt Left: 25.46% $414,270.82
Delta: -7.20% -$137,108.52
Over/Under Est: 16.56% $338,869.24
Amt Left: 46.61% $758,425.12
Delta: -16.86% -$344,154.30

Bid Items & Bid Tabulations

53 Total 0 of 53
NAVARRO  |  FM 2555  |  DALLAS  |  2682-01-024  |  12/03/2025  |  $2,046,631.06  |  C 2682-1-24  |  REHAB EXIST ROADWAY  |  36 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
PEACHTREE CONSTRUCTION, LTD.
FIREMAN EXCAVATING, INC.
GREY SKY CONSTRUCTION LLC
GARRET SHIELDS INFRASTRUCTURE
REMOV CONC (RIPRAP)
SY 7.000 $200.000 $85.000 $160.000 $50.000 $89.300 $90.140 $100.000 $50.000
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
SY 1,812.000 $9.000 $6.300 $7.000 $12.500 $8.950 $8.480 $12.000 $40.000
BLOCK SODDING
SY 52.000 $8.000 $25.000 $15.950 $15.000 $16.000 $56.480 $10.000 $10.000
VEGETATIVE WATERING
TGL 8.000 $20.000 $240.000 $1.000 $100.000 $200.000 $30.000 $500.000 $500.000
SP MIXES SP-C SAC-B PG64-22
TON 5,607.000 $135.000 $123.000 $113.120 $103.000 $143.900 $140.000 $145.000 $200.000
TACK COAT
GAL 5,340.000 $5.000 $2.650 $3.200 $3.500 $1.000 $6.190 $5.000 $5.000
PLANE ASPH CONC PAV(2")
SY 48,517.000 $3.000 $1.800 $2.350 $3.000 $2.850 $2.670 $3.000 $4.000
FULL - DEPTH REPAIR CRCP (11"-12")
SY 533.000 $450.000 $395.320 $357.450 $475.000 $356.000 $320.000 $450.000 $350.000
CUT & RESTORE ASPH PAVING
SY 210.000 $500.000 $80.000 $352.500 $300.000 $84.800 $168.060 $150.000 $300.000
TRENCH EXCAVATION PROTECTION
LF 55.000 $8.000 $100.000 $12.750 $50.000 $106.000 $60.020 $10.000 $10.000
TEMPORARY SPL SHORING
SF 100.000 $60.000 $60.000 $42.550 $100.000 $63.600 $37.040 $85.000 $80.000
RIPRAP (CONC)(4 IN)
CY 2.000 $1,200.000 $1,200.000 $905.000 $1,500.000 $1,275.000 $613.600 $550.000 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $900.000 $900.000 $1,010.000 $760.000 $975.000 $613.600 $550.000 $600.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 7.000 $400.000 $450.000 $240.000 $500.000 $477.000 $216.570 $185.000 $300.000
RC PIPE (CL III)(18 IN)
LF 371.000 $100.000 $63.000 $65.950 $90.000 $66.800 $109.970 $85.000 $80.000
RC PIPE (CL III)(24 IN)
LF 342.000 $130.000 $92.000 $138.300 $125.000 $97.500 $130.270 $105.000 $120.000
RC PIPE (CL III)(42 IN)
LF 186.000 $340.000 $315.000 $345.750 $250.000 $338.000 $283.980 $250.000 $200.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 1.000 $20,000.000 $24,000.000 $15,956.980 $25,000.000 $25,450.000 $48,288.000 $15,200.000 $10,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $1,000.000 $1,360.000 $957.450 $1,000.000 $1,283.000 $2,472.100 $1,250.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,500.000 $1,780.000 $2,660.000 $1,500.000 $1,887.000 $2,861.500 $2,200.000 $1,500.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 3.000 $5,000.000 $4,500.000 $5,319.000 $5,000.000 $4,770.000 $10,454.610 $12,500.000 $4,000.000
REMOV STR (SET)
EA 13.000 $1,000.000 $210.000 $797.850 $600.000 $222.500 $1,030.190 $500.000 $500.000
REMOV STR (HEADWALL)
EA 1.000 $4,000.000 $1,800.000 $1,595.700 $2,500.000 $1,908.000 $7,569.440 $2,500.000 $2,000.000
REMOV STR (PIPE)
LF 928.000 $22.000 $10.000 $31.900 $20.000 $10.600 $49.070 $30.000 $10.000
MOBILIZATION
LS 1.000 $186,057.460 $100,000.000 $137,592.000 $170,000.000 $165,000.000 $89,226.000 $200,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $10,000.000 $1,975.000 $5,800.000 $3,000.000 $8,500.000 $4,988.750 $8,500.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $5,900.000 $1,000.000 $5,000.000 $11,000.000 $6,819.630 $15,000.000 $1,000.000
TMA (STATIONARY)
DAY 28.000 $250.000 $112.000 $480.000 $500.000 $150.000 $598.020 $250.000 $300.000
TMA (MOBILE OPERATION)
HR 48.000 $90.000 $61.000 $92.000 $100.000 $47.000 $284.150 $55.000 $50.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $45.000 $60.000 $53.200 $55.000 $46.000 $85.680 $50.000 $20.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $15.000 $15.000 $21.300 $12.000 $19.000 $85.680 $20.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $4.500 $8.000 $12.600 $6.000 $4.750 $3.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.200 $2.000 $2.150 $2.000 $1.500 $3.000 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $6.800 $10.000 $6.400 $7.000 $6.500 $42.840 $18.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.900 $2.000 $2.150 $2.000 $1.300 $42.840 $9.000 $1.000
DRIVEWAYS (ACP)
SY 1,812.000 $50.000 $75.000 $45.150 $50.000 $73.200 $42.040 $45.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $40.000 $22.500 $23.950 $30.000 $27.600 $32.000 $25.000 $40.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $15.000 $2.500 $2.650 $3.000 $3.200 $12.000 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,800.000 $2,950.000 $3,138.000 $3,500.000 $3,280.000 $3,250.000 $3,850.000 $4,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $250.000 $265.950 $250.000 $320.000 $360.000 $1,500.000 $500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 4.000 $250.000 $721.000 $767.000 $500.000 $750.000 $360.000 $1,150.000 $300.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 6.000 $55.000 $25.000 $26.600 $40.000 $47.500 $36.000 $100.000 $10.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 155.000 $1.500 $1.000 $1.060 $1.500 $2.000 $0.930 $6.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 967.000 $1.500 $1.000 $1.060 $1.500 $2.000 $0.930 $6.000 $0.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 285.000 $2.000 $1.000 $1.060 $1.000 $1.800 $4.690 $6.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 903.000 $1.400 $0.820 $0.870 $1.000 $1.050 $1.940 $6.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,119.000 $8.000 $6.000 $6.400 $6.000 $6.800 $8.190 $12.000 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 18.000 $185.000 $120.000 $127.000 $120.000 $131.000 $231.250 $250.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 7.000 $225.000 $149.000 $158.000 $150.000 $159.000 $268.750 $250.000 $200.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 18,849.000 $0.800 $0.520 $0.550 $0.550 $0.600 $0.680 $1.000 $0.600
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 19,299.000 $0.800 $0.520 $0.550 $0.550 $0.600 $0.670 $1.000 $0.600
REFL PAV MRKR TY I-C
EA 77.000 $5.500 $4.000 $4.250 $5.000 $3.600 $5.000 $6.000 $6.000
REFL PAV MRKR TY II-A-A
EA 193.000 $5.500 $4.000 $4.250 $5.000 $3.600 $4.940 $6.000 $6.000
Totals: $2,046,631.060 $1,627,075.180 $1,685,000.000 $1,731,593.400 $1,884,640.900 $1,904,237.480 $2,041,346.000 $2,385,500.300