NAVARRO FM 744 (1663-03-020)

Items: 111

County: NAVARRO
Length: N/A
Highway: FM 744
District: DALLAS
Control Number: 1663-03-020
DBE Goal: N/A
Project: C 1663-3-20
Guaranty: N/A
Time: 370 WORKING DAYS
Engineer's Estimate: $7,992,177.61
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$7,992,177.61
$5,714,506.65
Over/Under Est: -28.5% -$2,277,670.96
Over/Under Est: -17.13% -$1,369,034.08
Amt Left: 15.9% $908,636.88
Over/Under Est: -12.57% -$1,004,577.91
Amt Left: 22.28% $1,273,093.05
Delta: -5.50% -$364,456.17
Over/Under Est: -3.31% -$264,893.07
Amt Left: 35.22% $2,012,777.89
Delta: -10.59% -$739,684.84
Over/Under Est: 11.03% $881,712.93
Amt Left: 55.29% $3,159,383.89
Delta: -14.84% -$1,146,606.00
$10,307,029.63
Over/Under Est: 28.96% $2,314,852.02
Amt Left: 80.37% $4,592,522.98
Delta: -16.15% -$1,433,139.09

Bid Items & Bid Tabulations

111 Total 0 of 111
NAVARRO  |  FM 744  |  DALLAS  |  1663-03-020  |  09/01/2021  |  $7,992,177.61  |  C 1663-3-20  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  370 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
KNIFE RIVER CORPORATION - SOUTH
BIG CREEK CONSTRUCTION, LTD.
ED BELL CONSTRUCTION COMPANY
NEW WORLD CONTRACTING, LLC
ALTUS CONSTRUCTION LLC
PREPARING ROW
STA 318.900 $3,500.000 $300.000 $250.000 $500.000 $700.000 $673.000 $1,307.130
REMOVING CONC (PAV)
SY 8,917.000 $12.000 $9.000 $12.500 $16.500 $10.000 $9.000 $10.260
REMOVING CONC (DRIVEWAYS)
SY 854.000 $12.500 $20.000 $15.000 $5.000 $1.000 $9.000 $13.030
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 5,761.000 $5.500 $3.000 $6.000 $5.000 $0.600 $2.400 $9.230
REMOVING STAB BASE AND ASPH PAV(8")
SY 92,126.000 $4.000 $1.500 $1.100 $2.500 $0.800 $1.400 $4.500
EXCAVATION (ROADWAY)
CY 28,948.000 $7.500 $6.000 $7.000 $8.000 $0.100 $15.000 $18.560
SUBGRADE WIDENING (ORD COMP)
STA 318.900 $275.000 $130.000 $200.000 $500.000 $600.000 $85.000 $803.550
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 34,006.000 $9.000 $9.000 $11.250 $10.000 $10.000 $15.000 $16.130
BACKFILL (TY A OR B)
STA 318.900 $178.100 $90.000 $135.000 $150.000 $200.000 $243.000 $218.910
ROAD GRADER WORK (ORD COMP)
STA 318.900 $193.000 $80.000 $25.000 $100.000 $600.000 $252.000 $172.440
COMPOST MANUF TOPSOIL (4")
SY 229,471.000 $0.650 $0.100 $0.870 $1.250 $0.500 $1.000 $1.150
BLOCK SODDING
SY 1,631.000 $4.000 $3.900 $4.850 $5.000 $10.000 $5.000 $6.330
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 229,471.000 $0.170 $0.120 $0.140 $0.120 $0.080 $0.200 $0.180
DRILL SEED (TEMP)(WARM OR COOL)
SY 229,471.000 $0.180 $0.080 $0.130 $0.100 $0.050 $0.200 $0.160
VEGETATIVE WATERING
MG 68,333.000 $3.500 $0.100 $0.010 $0.010 $0.100 $10.000 $1.320
FL BS (RDWY DEL) (TY D GR 1-2)
TON 6,432.000 $22.000 $25.000 $26.500 $25.000 $31.500 $37.000 $37.850
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 99,214.000 $15.000 $17.000 $16.500 $17.000 $21.000 $21.000 $25.810
REWORK BS MTL (TY B) (8") (ORD COMP)
SY 3,860.000 $1.570 $3.400 $5.000 $7.000 $5.000 $5.000 $1.660
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 70,868.000 $2.100 $1.800 $1.350 $2.000 $1.500 $3.000 $2.040
CEMENT
TON 533.000 $154.430 $175.000 $160.000 $165.000 $175.000 $213.000 $238.650
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 106,301.000 $2.000 $1.500 $1.450 $1.500 $1.000 $1.200 $1.430
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 19,936.000 $4.500 $3.000 $2.300 $3.500 $3.500 $4.000 $4.620
ASPH (CRS-2P)
GAL 47,850.000 $3.750 $2.700 $3.050 $3.500 $3.500 $4.000 $4.620
ASPH (RC-250)
GAL 9,295.000 $4.260 $2.700 $3.350 $4.000 $4.000 $4.000 $5.270
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 266.000 $150.000 $110.000 $137.000 $90.000 $135.000 $151.000 $178.030
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 34,452.000 $3.000 $3.500 $3.300 $3.250 $4.100 $5.000 $5.410
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 798.000 $130.000 $150.000 $137.000 $110.000 $155.500 $167.000 $205.060
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 277.000 $114.180 $125.000 $117.000 $90.000 $130.000 $146.000 $171.430
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 634.000 $160.090 $125.000 $111.000 $90.000 $135.000 $151.000 $178.030
PLANE ASPH CONC PAV (2")
SY 494.000 $7.000 $8.000 $12.750 $10.000 $20.000 $7.000 $22.420
CUT & RESTORE ASPH PAVING
SY 123.000 $200.000 $110.000 $685.000 $250.000 $133.130 $140.000 $106.980
TRENCH EXCAVATION PROTECTION
LF 89.000 $12.500 $11.000 $7.350 $10.000 $15.980 $17.000 $3.800
TEMPORARY SPL SHORING
SF 1,660.000 $23.080 $32.000 $20.000 $40.000 $53.250 $45.000 $94.220
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 229.000 $120.000 $83.000 $200.000 $150.000 $167.490 $112.000 $272.410
RIPRAP (MOW STRIP)(4 IN)
CY 43.000 $500.000 $530.000 $485.000 $550.000 $639.000 $673.000 $390.450
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
LF 10.000 $550.000 $530.000 $1,015.000 $650.000 $585.750 $617.000 $839.670
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 48.000 $628.000 $625.000 $490.000 $700.000 $692.250 $729.000 $740.580
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 33.000 $650.000 $725.000 $430.000 $750.000 $798.750 $842.000 $840.870
RC PIPE (CL III)(18 IN)
LF 1,568.000 $45.000 $47.000 $58.000 $60.000 $55.380 $54.000 $50.780
RC PIPE (CL III)(24 IN)
LF 581.000 $70.000 $105.000 $87.000 $80.000 $127.800 $112.000 $64.430
RC PIPE (CL III)(36 IN)
LF 126.000 $130.500 $210.000 $153.000 $150.000 $213.000 $224.000 $146.270
RC PIPE (CL III)(48 IN)
LF 110.000 $250.000 $360.000 $225.000 $250.000 $372.750 $393.000 $192.450
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 3.000 $5,250.000 $3,700.000 $9,500.000 $5,000.000 $4,260.000 $4,488.000 $6,563.320
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $5,750.000 $4,700.000 $8,100.000 $5,500.000 $5,325.000 $5,610.000 $8,028.210
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 5.000 $6,600.000 $6,300.000 $8,900.000 $10,000.000 $6,922.500 $7,293.000 $6,932.030
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 3.000 $7,600.000 $9,900.000 $10,500.000 $15,000.000 $11,182.500 $11,781.000 $8,777.360
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $7,000.000 $7,300.000 $8,900.000 $7,500.000 $7,987.500 $8,415.000 $9,125.960
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 2.000 $9,500.000 $12,000.000 $9,200.000 $25,000.000 $12,780.000 $13,464.000 $9,581.210
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $30,000.000 $23,000.000 $9,900.000 $15,000.000 $26,625.000 $26,928.000 $27,195.700
SET (TY I)(S= 5 FT)(HW= 2 FT)(3:1) (C)
EA 2.000 $8,000.000 $5,700.000 $11,000.000 $5,000.000 $6,922.500 $6,732.000 $12,606.810
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $7,000.000 $8,300.000 $5,300.000 $7,000.000 $9,585.000 $9,537.000 $19,495.720
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 114.000 $825.000 $800.000 $1,000.000 $800.000 $958.500 $898.000 $1,194.790
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $950.000 $880.000 $1,090.000 $1,000.000 $1,011.750 $1,010.000 $1,871.900
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 26.000 $1,202.120 $940.000 $1,375.000 $1,250.000 $1,065.000 $1,066.000 $1,777.770
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,550.000 $2,700.000 $1,425.000 $1,500.000 $2,662.500 $2,805.000 $3,335.660
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $2,550.000 $3,700.000 $2,325.000 $3,500.000 $3,727.500 $3,927.000 $2,769.940
SET (TY II) (48 IN) (RCP) (3: 1) (C)
EA 1.000 $4,400.000 $5,300.000 $4,725.000 $6,000.000 $5,857.500 $6,171.000 $4,693.290
CLEAN EXIST CULVERTS
EA 12.000 $1,483.000 $1,100.000 $1,250.000 $2,500.000 $1,597.500 $1,346.000 $2,358.850
REMOV STR (SET)
EA 4.000 $425.000 $670.000 $1,250.000 $1,500.000 $692.250 $729.000 $651.530
REMOV STR (WINGWALL)
EA 2.000 $1,404.500 $790.000 $1,250.000 $1,500.000 $2,130.000 $2,244.000 $1,515.880
REMOV STR (PIPE)
LF 570.000 $13.960 $20.000 $9.400 $15.000 $31.950 $22.000 $11.870
REMOV STR (DRIVEWAY CULVERT)
EA 73.000 $500.000 $630.000 $340.000 $300.000 $1,278.000 $954.000 $559.050
MOBILIZATION
LS 1.000 $800,000.000 $350,000.000 $660,000.000 $690,000.000 $734,000.000 $700,000.000 $1,021,995.730
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $10,000.000 $6,500.000 $15,000.000 $5,000.000 $21,000.000 $3,927.000 $13,187.040
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,364.000 $26.000 $30.000 $29.400 $25.000 $30.000 $31.000 $35.610
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 264.000 $60.000 $39.000 $68.000 $50.000 $35.000 $56.000 $52.750
ROCK FILTER DAMS (REMOVE)
LF 1,628.000 $6.330 $9.000 $9.000 $5.000 $15.000 $10.000 $11.870
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 246.000 $24.550 $5.000 $14.000 $25.000 $21.000 $28.000 $32.970
CONSTRUCTION EXITS (REMOVE)
SY 246.000 $8.000 $1.000 $3.000 $5.000 $10.000 $11.000 $11.870
TEMP SEDMT CONT FENCE (INSTALL)
LF 17,237.000 $2.300 $1.950 $3.100 $3.500 $1.600 $3.000 $2.970
TEMP SEDMT CONT FENCE (REMOVE)
LF 17,237.000 $0.600 $0.800 $0.450 $0.500 $0.100 $0.120 $0.660
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 649.000 $5.900 $4.800 $7.000 $5.000 $4.250 $6.000 $5.930
BIODEG EROSN CONT LOGS (REMOVE)
LF 649.000 $1.500 $1.000 $1.000 $1.000 $1.500 $1.000 $0.990
CONSTRUCTING DETOURS
SY 160.000 $50.000 $80.000 $185.000 $110.000 $210.000 $197.000 $59.120
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 600.000 $25.000 $25.000 $22.000 $60.000 $31.500 $64.000 $16.680
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 600.000 $10.000 $25.000 $18.000 $25.000 $15.750 $9.000 $21.760
DRIVEWAYS (ACP)
SY 853.000 $45.000 $35.000 $40.000 $35.000 $55.430 $40.000 $63.470
DRIVEWAYS (SURF TREAT)
SY 4,909.000 $27.000 $20.000 $33.000 $20.000 $56.770 $43.000 $34.290
DRIVEWAYS (CONC) (HES)
SY 45.000 $150.000 $150.000 $220.000 $150.000 $252.000 $168.000 $100.410
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 2,040.000 $0.500 $2.300 $1.600 $3.500 $1.650 $2.000 $1.320
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 1,020.000 $0.170 $2.300 $1.900 $3.500 $1.970 $2.000 $1.320
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $2,000.000 $850.000 $3,000.000 $2,000.000 $2,100.000 $1,683.000 $1,626.820
CRASH CUSH ATTEN (REMOVE)
EA 3.000 $750.000 $1,400.000 $1,000.000 $1,000.000 $840.000 $898.000 $880.790
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 3.000 $7,000.000 $3,000.000 $25,000.000 $26,500.000 $21,000.000 $29,172.000 $16,585.840
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 34.000 $243.890 $300.000 $235.000 $250.000 $310.000 $252.000 $303.560
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $568.500 $495.000 $575.000 $550.000 $506.000 $729.000 $622.730
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 87.000 $503.450 $540.000 $575.000 $600.000 $549.000 $628.000 $595.700
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $645.000 $655.000 $680.000 $600.000 $671.000 $794.000 $729.630
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $815.000 $700.000 $680.000 $700.000 $714.000 $909.000 $1,317.200
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $887.000 $820.000 $730.000 $700.000 $842.000 $917.000 $977.250
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $925.000 $930.000 $800.000 $800.000 $948.000 $1,207.000 $985.460
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 6.000 $929.110 $970.000 $940.000 $1,000.000 $991.000 $1,268.000 $1,017.530
REMOVE SM RD SN SUP&AM
EA 103.000 $82.350 $80.000 $100.000 $100.000 $80.000 $84.000 $104.920
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $27.000 $32.000 $42.000 $25.000 $32.000 $28.000 $32.640
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 32.000 $95.330 $60.000 $78.000 $50.000 $57.000 $49.000 $257.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 64,080.000 $0.400 $0.210 $0.210 $0.250 $0.210 $0.220 $0.370
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 6,408.000 $1.100 $0.750 $1.300 $1.000 $2.000 $2.000 $9.230
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 118.000 $13.000 $6.300 $6.320 $7.000 $6.390 $7.000 $7.070
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,040.000 $0.320 $0.420 $0.410 $0.500 $0.420 $0.430 $0.470
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 100.000 $0.580 $0.600 $0.590 $0.600 $0.600 $1.000 $2.640
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,240.000 $0.360 $0.420 $0.410 $0.400 $0.420 $0.430 $0.470
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 61,740.000 $0.700 $0.600 $0.580 $0.600 $0.590 $1.000 $0.790
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 4,010.000 $0.500 $0.700 $0.680 $0.700 $0.690 $1.000 $0.900
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 40,450.000 $0.600 $0.600 $0.580 $0.600 $0.590 $1.000 $0.790
REFL PAV MRKR TY II-A-A
EA 689.000 $3.330 $4.000 $3.950 $4.000 $3.990 $4.000 $5.270
FULL - WIDTH MOWING
CYC 4.000 $3,015.000 $2,000.000 $3,200.000 $2,500.000 $7,500.000 $5,610.000 $4,478.730
SP MIXES SP-C SAC-B PG64-22
TON 430.000 $100.000 $120.000 $135.000 $93.000 $166.000 $162.000 $189.890
TACK COAT
GAL 430.000 $2.000 $3.000 $2.500 $3.500 $3.150 $3.400 $4.090
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,429.000 $10,000.000 $10,000.000 $14,500.000 $18,900.000 $12,118.000 $5,274.820
TMA (STATIONARY)
DAY 100.000 $100.000 $200.000 $50.000 $450.000 $157.500 $289.000 $197.810
TMA (MOBILE OPERATION)
HR 110.000 $60.000 $55.000 $65.000 $50.000 $73.500 $214.000 $131.870
Totals: $7,992,177.610 $5,714,506.650 $6,623,143.530 $6,987,599.700 $7,727,284.540 $8,873,890.540 $10,307,029.657