|
|
PREPARING ROW
|
STA
|
161.200
|
$1,007.000
|
$750.000
|
$1,000.000
|
$400.000
|
$1,000.000
|
$2,815.000
|
$2,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
876.000
|
$7.850
|
$50.000
|
$15.000
|
$12.000
|
$25.000
|
$12.600
|
$20.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
64.000
|
$15.700
|
$25.000
|
$20.000
|
$20.000
|
$20.000
|
$31.500
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
97.000
|
$10.750
|
$25.000
|
$15.000
|
$20.000
|
$20.000
|
$16.800
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
2,384.000
|
$4.200
|
$8.200
|
$17.500
|
$4.500
|
$12.000
|
$14.700
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
1,752.000
|
$6.000
|
$12.000
|
$19.500
|
$6.000
|
$15.000
|
$12.600
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,141.000
|
$8.750
|
$20.000
|
$20.000
|
$9.000
|
$25.000
|
$18.900
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
161.200
|
$451.150
|
$650.000
|
$550.000
|
$3,150.000
|
$1,500.000
|
$735.000
|
$650.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
1,568.000
|
$11.250
|
$30.000
|
$20.000
|
$8.000
|
$25.000
|
$21.000
|
$35.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
161.200
|
$244.950
|
$150.000
|
$250.000
|
$130.000
|
$350.000
|
$420.000
|
$450.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
107,468.000
|
$1.350
|
$0.940
|
$1.400
|
$0.500
|
$1.500
|
$0.550
|
$2.500
|
|
|
BLOCK SODDING
|
SY
|
253.000
|
$3.500
|
$12.000
|
$7.000
|
$6.000
|
$3.600
|
$13.650
|
$5.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
107,468.000
|
$0.150
|
$0.110
|
$0.170
|
$0.130
|
$0.110
|
$0.120
|
$0.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
107,468.000
|
$0.200
|
$0.090
|
$0.170
|
$0.130
|
$0.110
|
$0.040
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
19,746.000
|
$15.650
|
$0.010
|
$5.250
|
$1.000
|
$0.010
|
$0.010
|
$38.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
162.000
|
$10.750
|
$25.000
|
$10.000
|
$1.000
|
$25.000
|
$35.000
|
$58.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$77.450
|
$85.000
|
$85.000
|
$80.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
720.000
|
$34.050
|
$30.000
|
$32.000
|
$24.500
|
$35.000
|
$27.000
|
$42.000
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(14")
|
SY
|
12,250.000
|
$25.500
|
$32.000
|
$29.000
|
$25.500
|
$38.000
|
$28.150
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY-D GR-1-2)(7")
|
SY
|
25,029.000
|
$10.200
|
$10.000
|
$15.000
|
$10.000
|
$12.000
|
$11.300
|
$14.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
24,499.000
|
$12.350
|
$15.000
|
$16.500
|
$12.000
|
$15.000
|
$13.250
|
$16.000
|
|
|
REWORKING BS MTRL(TY B)(11"-19")(OC)
|
SY
|
17,878.000
|
$3.000
|
$4.000
|
$3.500
|
$4.000
|
$5.500
|
$6.300
|
$6.000
|
|
|
LIME (HYDRATED OR COMMERCIAL)(SLURRY)
|
TON
|
456.000
|
$175.000
|
$169.000
|
$185.000
|
$165.000
|
$170.000
|
$178.500
|
$171.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
30,393.000
|
$3.800
|
$5.000
|
$3.500
|
$4.000
|
$5.000
|
$2.500
|
$4.000
|
|
|
CEMENT
|
TON
|
157.000
|
$144.450
|
$150.000
|
$145.000
|
$155.000
|
$160.000
|
$210.000
|
$171.000
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS) (6")
|
SY
|
26,817.000
|
$1.950
|
$2.150
|
$3.000
|
$3.000
|
$3.000
|
$2.000
|
$4.500
|
|
|
PRIME COAT & BLOTTER (MULTI OPTION)
|
GAL
|
9,906.000
|
$3.800
|
$3.900
|
$3.500
|
$2.300
|
$5.000
|
$6.600
|
$8.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
8,256.000
|
$3.250
|
$2.730
|
$3.000
|
$2.800
|
$3.000
|
$2.750
|
$8.000
|
|
|
ASPH (RC-250)
|
GAL
|
4,624.000
|
$3.900
|
$4.000
|
$3.500
|
$3.800
|
$4.000
|
$3.500
|
$8.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
133.000
|
$100.250
|
$214.000
|
$136.000
|
$200.000
|
$150.000
|
$142.000
|
$210.000
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
24,766.000
|
$2.950
|
$2.440
|
$3.050
|
$2.500
|
$3.000
|
$2.650
|
$8.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
|
CY
|
414.000
|
$85.600
|
$141.000
|
$136.000
|
$110.000
|
$120.000
|
$132.000
|
$210.000
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
316.000
|
$107.800
|
$153.000
|
$136.000
|
$110.000
|
$110.000
|
$137.000
|
$210.000
|
|
|
CUT & RESTORING PAV
|
SY
|
113.000
|
$50.000
|
$100.000
|
$130.000
|
$210.000
|
$350.000
|
$189.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
239.000
|
$1.150
|
$6.500
|
$10.000
|
$17.000
|
$10.000
|
$11.550
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
4,236.000
|
$15.100
|
$22.000
|
$15.000
|
$40.000
|
$20.000
|
$33.300
|
$40.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
510.000
|
$52.500
|
$57.000
|
$15.000
|
$62.000
|
$75.000
|
$50.000
|
$50.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
5.000
|
$368.800
|
$515.000
|
$1,130.000
|
$1,000.000
|
$600.000
|
$735.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(8 IN)
|
CY
|
742.000
|
$241.550
|
$175.000
|
$190.000
|
$130.000
|
$180.000
|
$168.000
|
$180.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
383.000
|
$42.650
|
$36.000
|
$50.000
|
$58.000
|
$75.000
|
$46.000
|
$35.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
69.000
|
$67.000
|
$46.000
|
$60.000
|
$95.000
|
$115.000
|
$60.000
|
$55.000
|
|
|
CMP (GAL STL 36 IN)
|
LF
|
21.000
|
$74.550
|
$63.000
|
$120.000
|
$210.000
|
$130.000
|
$70.000
|
$75.000
|
|
|
CMP (GAL STL 15 IN)
|
LF
|
21.000
|
$87.550
|
$36.000
|
$78.000
|
$58.000
|
$75.000
|
$40.000
|
$35.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
91.000
|
$400.650
|
$450.000
|
$575.000
|
$530.000
|
$600.000
|
$420.000
|
$700.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
18.000
|
$526.150
|
$800.000
|
$635.000
|
$550.000
|
$700.000
|
$630.000
|
$750.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
56.000
|
$591.850
|
$360.000
|
$800.000
|
$630.000
|
$800.000
|
$525.000
|
$850.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
110.000
|
$1,900.450
|
$525.000
|
$920.000
|
$950.000
|
$1,400.000
|
$1,365.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
113.000
|
$43.000
|
$54.000
|
$58.000
|
$65.000
|
$75.000
|
$73.500
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
106.000
|
$55.700
|
$74.000
|
$80.000
|
$110.000
|
$95.000
|
$84.000
|
$85.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
177.000
|
$69.950
|
$100.000
|
$100.000
|
$150.000
|
$110.000
|
$116.500
|
$85.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
34.000
|
$106.950
|
$138.000
|
$160.000
|
$320.000
|
$150.000
|
$126.000
|
$105.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
144.000
|
$208.200
|
$368.000
|
$310.000
|
$460.000
|
$250.000
|
$420.000
|
$250.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
2.000
|
$4,100.000
|
$9,700.000
|
$8,000.000
|
$21,000.000
|
$19,100.000
|
$15,750.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
2.000
|
$6,232.400
|
$5,900.000
|
$5,700.000
|
$3,700.000
|
$7,500.000
|
$8,400.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
2.000
|
$12,000.000
|
$11,500.000
|
$19,500.000
|
$32,000.000
|
$27,500.000
|
$18,900.000
|
$12,500.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$6,978.650
|
$6,900.000
|
$5,700.000
|
$3,700.000
|
$6,000.000
|
$12,600.000
|
$6,000.000
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
1.000
|
$5,766.300
|
$8,800.000
|
$8,000.000
|
$9,000.000
|
$10,500.000
|
$16,800.000
|
$7,500.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$26,479.250
|
$26,000.000
|
$50,000.000
|
$61,000.000
|
$55,500.000
|
$52,500.000
|
$35,000.000
|
|
|
WINGWALL (PW - 2) (HW=4 FT)
|
EA
|
2.000
|
$9,369.350
|
$8,600.000
|
$6,700.000
|
$8,500.000
|
$11,000.000
|
$13,650.000
|
$9,500.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$11,219.850
|
$10,500.000
|
$14,900.000
|
$16,000.000
|
$22,500.000
|
$16,800.000
|
$13,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$16,326.450
|
$12,300.000
|
$43,000.000
|
$47,000.000
|
$28,000.000
|
$42,000.000
|
$14,000.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$662.800
|
$965.000
|
$900.000
|
$900.000
|
$650.000
|
$660.000
|
$550.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
40.000
|
$959.300
|
$1,000.000
|
$1,050.000
|
$1,000.000
|
$800.000
|
$690.000
|
$550.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$718.450
|
$900.000
|
$1,000.000
|
$1,000.000
|
$800.000
|
$650.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$1,276.950
|
$1,200.000
|
$1,050.000
|
$1,300.000
|
$1,150.000
|
$1,100.000
|
$800.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,075.200
|
$1,100.000
|
$1,275.000
|
$1,300.000
|
$1,150.000
|
$1,100.000
|
$800.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$3,500.000
|
$3,800.000
|
$4,600.000
|
$3,700.000
|
$5,200.000
|
$3,000.000
|
$2,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,617.850
|
$3,700.000
|
$4,600.000
|
$3,700.000
|
$5,200.000
|
$3,150.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$797.600
|
$500.000
|
$2,000.000
|
$3,200.000
|
$2,500.000
|
$3,000.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
10.000
|
$1,256.750
|
$875.000
|
$1,400.000
|
$1,500.000
|
$2,600.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
278.000
|
$18.350
|
$8.500
|
$15.000
|
$37.000
|
$25.000
|
$20.000
|
$30.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
36.000
|
$584.950
|
$385.000
|
$400.000
|
$900.000
|
$450.000
|
$425.000
|
$550.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$357,687.730
|
$385,000.000
|
$352,000.000
|
$400,000.000
|
$458,000.000
|
$440,000.000
|
$550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$1,200.000
|
$19,500.000
|
$5,000.000
|
$12,000.000
|
$6,000.000
|
$31,500.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
220.000
|
$28.400
|
$46.000
|
$25.000
|
$35.000
|
$35.000
|
$40.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
220.000
|
$9.100
|
$10.000
|
$2.000
|
$5.000
|
$10.000
|
$11.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$19.950
|
$20.000
|
$5.000
|
$15.000
|
$16.000
|
$25.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$7.850
|
$5.000
|
$1.000
|
$3.000
|
$5.000
|
$7.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,100.000
|
$2.450
|
$5.000
|
$5.000
|
$4.250
|
$3.000
|
$2.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,100.000
|
$0.600
|
$0.660
|
$1.000
|
$1.500
|
$1.000
|
$0.200
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
204.000
|
$4.050
|
$12.000
|
$3.500
|
$7.000
|
$6.000
|
$6.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
204.000
|
$1.600
|
$0.660
|
$1.000
|
$1.500
|
$3.000
|
$1.000
|
$8.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
615.000
|
$126.000
|
$35.000
|
$12.000
|
$35.000
|
$40.000
|
$43.000
|
$42.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,822.000
|
$75.700
|
$40.000
|
$12.000
|
$35.000
|
$40.000
|
$43.000
|
$42.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
106.000
|
$84.000
|
$132.000
|
$110.000
|
$140.000
|
$90.000
|
$126.000
|
$125.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$24.170
|
$33.000
|
$34.500
|
$36.000
|
$35.000
|
$38.960
|
$25.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,050.150
|
$2,500.000
|
$2,650.000
|
$2,100.000
|
$2,275.000
|
$2,221.240
|
$3,100.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$205.500
|
$440.000
|
$500.000
|
$370.000
|
$600.000
|
$654.980
|
$650.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
11.000
|
$205.500
|
$205.000
|
$300.000
|
$180.000
|
$300.000
|
$256.300
|
$650.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
19.000
|
$409.050
|
$330.000
|
$400.000
|
$420.000
|
$355.000
|
$398.680
|
$500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
8.000
|
$420.000
|
$385.000
|
$525.000
|
$420.000
|
$450.000
|
$512.590
|
$500.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
16.000
|
$76.000
|
$70.000
|
$75.000
|
$58.000
|
$55.000
|
$77.460
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,595.000
|
$0.350
|
$0.280
|
$0.300
|
$0.250
|
$0.300
|
$0.280
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
12,589.000
|
$0.300
|
$0.220
|
$0.250
|
$0.200
|
$0.300
|
$0.230
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,748.000
|
$1.750
|
$1.250
|
$1.000
|
$0.500
|
$1.000
|
$2.100
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
37.000
|
$6.300
|
$6.670
|
$7.000
|
$6.300
|
$6.000
|
$6.830
|
$10.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
31,784.000
|
$0.550
|
$0.390
|
$0.420
|
$0.370
|
$0.420
|
$0.400
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,595.000
|
$0.700
|
$0.440
|
$0.470
|
$0.420
|
$0.460
|
$0.460
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
12,589.000
|
$0.550
|
$0.440
|
$0.470
|
$0.420
|
$0.460
|
$0.460
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
348.000
|
$5.350
|
$3.890
|
$4.000
|
$3.700
|
$4.000
|
$3.990
|
$15.000
|
|
|
FULL - WIDTH MOWING
|
AC
|
57.000
|
$150.000
|
$100.000
|
$150.000
|
$100.000
|
$80.000
|
$210.000
|
$100.000
|
|
Totals: |
$3,934,106.350
|
$3,875,212.200
|
$4,061,487.630
|
$4,214,170.090
|
$4,587,110.340
|
$4,693,656.470
|
$5,839,088.500
|