NAVARRO FM 637 (0995-01-026)

Items: 87

County: NAVARRO
Length: N/A
Highway: FM 637
District: DALLAS
Control Number: 0995-01-026
DBE Goal: N/A
Project: BR 2021(538)
Guaranty: N/A
Time: 331 WORKING DAYS
Engineer's Estimate: $2,418,128.72
Date: 05/05/2021 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (9)
E
Engineer's Estimate
$2,418,128.72
Over/Under Est: 12.17% $294,272.88
Over/Under Est: 13.44% $324,925.76
Amt Left: 1.13% $30,652.88
$2,769,436.91
Over/Under Est: 14.53% $351,308.19
Amt Left: 2.1% $57,035.31
Delta: -0.96% -$26,382.43
Over/Under Est: 19.06% $460,814.62
Amt Left: 6.14% $166,541.74
Delta: -3.95% -$109,506.43
Over/Under Est: 21.71% $524,871.28
Amt Left: 8.5% $230,598.40
Delta: -2.23% -$64,056.66
Over/Under Est: 24.42% $590,513.94
Amt Left: 10.92% $296,241.06
Delta: -2.23% -$65,642.66
Over/Under Est: 24.44% $590,967.49
Amt Left: 10.94% $296,694.61
Delta: -0.02% -$453.55
Over/Under Est: 41.08% $993,284.94
Amt Left: 25.77% $699,012.06
Delta: -13.37% -$402,317.45
Over/Under Est: 95.39% $2,306,610.23
Amt Left: 74.19% $2,012,337.35
Delta: -38.50% -$1,313,325.29

Bid Items & Bid Tabulations

87 Total 0 of 87
NAVARRO  |  FM 637  |  DALLAS  |  0995-01-026  |  05/05/2021  |  $2,418,128.72  |  BR 2021(538)  |  BRIDGE REPL  |  331 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
ED BELL CONSTRUCTION COMPANY
A. L. HELMCAMP, INC.
KNIFE RIVER CORPORATION - SOUTH
NEW WORLD CONTRACTING, LLC
SEFBO PIPELINE BRIDGE, INCORPORATED
JAMES CONSTRUCTION GROUP, LLC
HIGHWAY 19 CONSTRUCTION LLC
FUQUA CONSTRUCTION CO., INC.
PREPARING ROW
STA 12.700 $3,000.000 $2,500.000 $11,550.000 $1,000.000 $4,000.000 $2,000.000 $5,000.000 $18,500.000 $2,500.000 $7,969.670
REMOV STAB BASE & ASPH PAV (8"-20")
SY 2,671.000 $6.000 $15.000 $1.000 $9.000 $9.000 $8.500 $2.500 $2.650 $8.000 $4.230
EXCAVATION (ROADWAY)
CY 3,373.000 $11.000 $10.000 $10.000 $12.000 $15.000 $14.500 $9.410 $8.400 $15.000 $11.410
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 3,995.000 $9.000 $15.000 $12.000 $15.000 $15.000 $20.000 $21.000 $7.240 $30.000 $11.200
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 273.000 $25.000 $15.000 $38.000 $25.000 $50.000 $25.000 $45.000 $11.870 $30.000 $36.920
COMPOST MANUF TOPSOIL (4")
SY 8,905.000 $2.000 $2.000 $1.050 $2.250 $1.050 $1.000 $4.650 $1.030 $1.500 $3.130
BLOCK SODDING
SY 8,905.000 $3.000 $5.000 $3.750 $4.750 $3.500 $3.500 $0.630 $3.080 $4.000 $8.370
DRILL SEED (TEMP)(WARM OR COOL)
SY 8,905.000 $0.160 $0.500 $0.030 $0.250 $0.270 $0.250 $0.100 $0.210 $0.500 $0.470
VEGETATIVE WATERING
MG 2,650.000 $13.000 $1.000 $2.100 $7.500 $1.000 $34.000 $79.550 $26.310 $10.000 $52.420
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
SY 4,179.000 $14.000 $20.000 $20.000 $23.000 $22.000 $22.000 $19.350 $23.900 $35.000 $17.550
LIME (HYDRATED LIME (SLURRY))
TON 99.000 $160.000 $250.000 $225.000 $200.000 $215.000 $250.000 $200.000 $210.260 $250.000 $307.830
LIME TRT (EXST MATL)(10")
SY 2,452.000 $3.500 $6.000 $4.500 $20.000 $7.750 $10.000 $4.100 $8.520 $7.000 $15.750
LIME TRT (EXIST MATL)(11")
SY 2,078.000 $4.000 $6.000 $5.000 $25.000 $9.000 $11.000 $4.520 $10.060 $8.000 $14.500
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 1,253.000 $6.000 $15.000 $16.000 $15.000 $7.000 $17.000 $4.500 $5.850 $10.000 $6.320
ASPH (CRS-2P)
GAL 2,475.000 $6.000 $10.000 $8.500 $8.000 $6.000 $9.000 $18.000 $4.580 $10.000 $6.980
ASPH (RC-250)
GAL 357.000 $15.000 $15.000 $15.850 $18.000 $11.000 $17.000 $9.680 $7.950 $4.500 $7.280
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 31.900 $156.000 $850.000 $850.000 $800.000 $350.000 $910.000 $137.000 $676.330 $350.000 $188.040
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 2,985.000 $5.000 $10.000 $8.750 $4.500 $5.750 $9.000 $3.800 $5.340 $5.000 $6.630
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 31.900 $210.000 $650.000 $650.000 $820.000 $570.000 $695.000 $140.000 $813.630 $250.000 $191.140
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 31.900 $145.000 $500.000 $500.000 $810.000 $530.000 $535.000 $135.000 $682.690 $250.000 $197.960
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 36.400 $310.000 $800.000 $800.000 $720.000 $490.000 $855.000 $130.000 $686.500 $200.000 $252.670
CEM STABIL BKFL
CY 30.000 $178.000 $250.000 $155.000 $575.000 $175.000 $149.000 $211.350 $194.250 $300.000 $98.560
TEMPORARY SPL SHORING
SF 2,271.000 $22.000 $25.000 $25.000 $30.000 $25.000 $17.000 $26.990 $40.000 $55.000 $26.000
DRILL SHAFT (18 IN)
LF 76.000 $65.000 $85.000 $150.000 $225.000 $165.000 $159.000 $139.750 $94.570 $225.000 $140.230
DRILL SHAFT (24 IN)
LF 504.000 $135.000 $145.000 $200.000 $150.000 $235.000 $199.000 $204.250 $158.490 $275.000 $274.840
DRILL SHAFT (36 IN)
LF 190.000 $240.000 $215.000 $300.000 $210.000 $490.000 $306.000 $252.630 $245.540 $325.000 $270.830
CL C CONC (ABUT)(HPC)
CY 87.800 $1,000.000 $1,000.000 $1,200.000 $1,100.000 $1,400.000 $950.000 $1,451.250 $1,222.050 $1,284.000 $1,435.550
CL C CONC (CAP)(HPC)
CY 21.800 $1,000.000 $1,000.000 $1,200.000 $1,600.000 $2,100.000 $1,400.000 $1,300.000 $2,077.780 $1,900.000 $1,537.140
CL C CONC (COLUMN)(HPC)
CY 13.200 $1,000.000 $1,200.000 $1,200.000 $1,700.000 $1,750.000 $1,800.000 $1,400.000 $1,634.660 $100.000 $1,377.250
REINF CONC SLAB (HPC)
SF 3,520.000 $20.000 $20.000 $25.000 $25.000 $29.000 $28.000 $21.000 $35.000 $24.000 $29.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 6,021.000 $18.000 $14.000 $15.000 $15.000 $19.000 $17.500 $20.000 $28.000 $17.000 $26.560
APPROACH SLAB (HPC)
CY 174.600 $500.000 $650.000 $500.000 $550.000 $600.000 $500.000 $550.000 $519.820 $550.000 $966.190
PRESTR CONC SLAB BEAM (4SB15)
LF 801.000 $150.000 $180.000 $165.000 $165.000 $185.000 $190.000 $220.000 $158.750 $168.000 $241.810
PRESTR CONC SLAB BEAM (5SB15)
LF 534.000 $180.000 $180.000 $200.000 $155.000 $200.000 $201.000 $220.000 $169.910 $168.000 $284.580
PRESTR CONC GIRDER (TX28)
LF 635.360 $170.000 $175.000 $200.000 $170.000 $175.000 $280.000 $180.600 $176.400 $176.000 $261.550
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,449.000 $115.000 $90.000 $105.000 $93.000 $102.000 $93.250 $95.680 $113.390 $180.000 $227.480
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $522.000 $450.000 $630.000 $700.000 $700.000 $650.000 $700.000 $601.140 $450.000 $666.380
RAIL (TY T223)(HPC)
LF 510.000 $110.000 $100.000 $105.000 $115.000 $128.000 $125.000 $145.000 $70.750 $100.000 $188.910
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 187.000 $96.000 $100.000 $75.000 $100.000 $110.000 $80.000 $83.970 $80.540 $180.000 $163.950
RC PIPE (CL III)(24 IN)
LF 48.000 $105.000 $100.000 $100.000 $150.000 $80.000 $85.000 $100.000 $88.710 $110.000 $121.520
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $1,295.000 $1,500.000 $1,000.000 $1,200.000 $1,385.000 $1,085.000 $1,900.000 $1,099.380 $950.000 $2,192.060
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,265.000 $1,600.000 $1,250.000 $1,500.000 $1,500.000 $1,250.000 $2,300.000 $1,668.670 $1,200.000 $2,245.310
REMOV STR (PIPE)
LF 37.000 $32.000 $20.000 $25.000 $35.000 $17.000 $30.000 $91.000 $51.210 $50.000 $23.690
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $30,000.000 $16,500.000 $25,000.000 $30,000.000 $14,861.720 $59,125.000 $60,000.000 $75,000.000 $27,864.730
MOBILIZATION
LS 1.000 $217,648.000 $245,000.000 $275,000.000 $100,000.000 $280,000.000 $137,387.760 $100,000.000 $297,690.000 $200,000.000 $820,295.710
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 16.000 $1,500.000 $2,500.000 $6,300.000 $10,000.000 $1,500.000 $3,500.000 $1,126.050 $1,837.630 $5,000.000 $13,203.940
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 135.000 $32.000 $1.000 $27.500 $35.000 $34.000 $35.000 $45.000 $32.740 $35.000 $90.890
ROCK FILTER DAMS (REMOVE)
LF 135.000 $11.000 $1.000 $12.500 $7.000 $15.000 $13.000 $30.420 $12.260 $10.000 $30.140
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 968.000 $20.000 $1.000 $5.250 $15.000 $12.450 $34.000 $15.000 $31.570 $30.000 $76.170
CONSTRUCTION EXITS (REMOVE)
SY 968.000 $7.000 $1.000 $2.100 $3.000 $2.480 $8.550 $3.000 $8.000 $5.000 $22.280
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,010.000 $2.000 $1.000 $2.100 $2.500 $5.000 $2.900 $2.690 $2.700 $3.000 $7.410
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,010.000 $0.650 $1.000 $0.210 $1.000 $0.800 $0.700 $0.540 $0.640 $1.000 $2.000
CONSTRUCTING DETOURS
SY 854.000 $80.000 $65.000 $65.000 $100.000 $95.000 $68.000 $67.850 $93.150 $81.000 $92.220
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 16.000 $1,250.000 $4,000.000 $1,500.000 $2,500.000 $4,500.000 $2,400.000 $3,500.000 $2,067.670 $5,000.000 $7,666.950
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,290.000 $30.000 $60.000 $25.000 $40.000 $28.000 $85.000 $41.000 $12.510 $50.000 $38.330
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,110.000 $12.000 $5.000 $4.000 $15.000 $20.000 $6.000 $11.500 $6.000 $15.000 $9.110
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,290.000 $11.000 $20.000 $10.000 $15.000 $15.000 $6.000 $23.000 $12.090 $50.000 $9.660
DRIVEWAYS (ACP)
SY 197.000 $46.000 $80.000 $100.000 $125.000 $35.000 $80.000 $55.100 $40.260 $55.000 $65.610
MTL W-BEAM GD FEN (TIM POST)
LF 200.000 $23.000 $25.000 $21.000 $23.100 $22.000 $23.000 $23.110 $21.870 $22.000 $33.110
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,590.000 $1,600.000 $1,575.000 $1,758.750 $2,200.000 $1,445.000 $1,451.250 $1,373.230 $1,500.000 $2,823.410
REMOVE METAL BEAM GUARD FENCE
LF 170.000 $4.000 $4.000 $5.250 $5.250 $4.350 $1.000 $1.080 $1.020 $1.000 $3.980
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,400.000 $2,700.000 $2,520.000 $2,677.500 $2,770.000 $2,335.000 $2,343.500 $2,217.500 $2,180.000 $4,165.060
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $265.000 $500.000 $315.000 $262.500 $430.000 $128.500 $129.000 $122.070 $120.000 $516.140
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $1,400.000 $2,000.000 $1,575.000 $800.000 $2,200.000 $964.000 $967.500 $915.480 $1,000.000 $2,502.420
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $750.000 $1,000.000 $735.000 $500.000 $1,000.000 $428.500 $430.000 $406.880 $500.000 $1,284.580
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 6.000 $7,700.000 $10,000.000 $9,450.000 $7,500.000 $8,700.000 $8,570.000 $8,600.000 $8,137.630 $7,500.000 $12,073.060
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $440.000 $250.000 $300.000 $750.000 $265.000 $182.000 $182.750 $170.000 $190.000 $409.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $500.000 $800.000 $525.000 $450.000 $650.000 $550.000 $551.480 $513.000 $550.000 $838.660
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $630.000 $800.000 $630.000 $525.000 $750.000 $557.000 $559.000 $520.000 $575.000 $1,047.860
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $800.000 $840.000 $630.000 $750.000 $760.450 $763.250 $710.000 $800.000 $1,935.690
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $22.000 $30.000 $30.000 $26.250 $25.000 $21.450 $21.500 $20.000 $35.000 $36.770
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 8.000 $24.000 $30.000 $30.000 $26.250 $30.000 $21.450 $21.500 $20.000 $55.000 $44.450
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 300.000 $4.500 $5.000 $7.350 $4.200 $5.380 $4.300 $5.200 $5.000 $4.000 $5.830
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 5,243.000 $1.000 $1.500 $1.500 $1.580 $1.350 $1.600 $0.500 $1.250 $1.500 $1.160
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 96.000 $7.500 $10.000 $10.000 $10.500 $8.720 $10.700 $220.000 $8.100 $10.000 $12.080
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 12,000.000 $1.000 $1.000 $1.250 $1.580 $1.080 $1.600 $0.500 $1.000 $1.500 $1.140
PAVEMENT SEALER 4"
LF 1,272.000 $0.350 $1.000 $1.250 $0.530 $1.080 $0.550 $0.150 $1.000 $50.000 $0.190
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 2,530.000 $1.500 $2.000 $2.000 $1.580 $1.610 $1.600 $1.080 $1.500 $1.500 $0.830
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 15,488.000 $0.700 $1.500 $1.500 $1.580 $1.350 $1.600 $1.500 $1.250 $1.500 $0.860
REFL PAV MRKR TY II-A-A
EA 195.000 $5.000 $5.000 $7.350 $6.300 $5.380 $6.450 $43.000 $5.000 $6.000 $4.700
ELIM EXT PAV MRK & MRKS (4")
LF 7,744.000 $0.580 $0.750 $0.630 $0.580 $0.540 $0.600 $0.400 $0.500 $0.550 $0.560
PAV SURF PREP FOR MRK (4")
LF 18,018.000 $0.100 $0.500 $0.320 $0.050 $0.270 $0.050 $1.080 $0.250 $0.050 $0.080
FULL - WIDTH MOWING
AC 1.800 $439.000 $1.000 $500.000 $1,000.000 $750.000 $250.000 $250.000 $973.290 $1,000.000 $183.440
LITTER REMOVAL
AC 3.800 $350.000 $1.000 $500.000 $900.000 $500.000 $745.000 $150.000 $317.990 $500.000 $156.250
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $9,970.000 $19,500.000 $5,250.000 $5,000.000 $5,000.000 $15,000.000 $11,287.500 $4,282.660 $17,000.000 $13,543.720
TMA (STATIONARY)
DAY 542.000 $190.000 $100.000 $25.000 $150.000 $1.000 $195.000 $283.170 $1.070 $100.000 $276.980
TMA (MOBILE OPERATION)
DAY 4.000 $400.000 $150.000 $525.000 $600.000 $700.000 $5,000.000 $1,247.540 $72.820 $500.000 $319.720
Totals: $2,418,128.720 $2,712,401.600 $2,743,054.480 $2,769,436.910 $2,878,943.340 $2,943,000.000 $3,008,642.666 $3,009,096.241 $3,411,413.660 $4,724,738.999