NAVARRO FM 636 (0574-02-022)

Items: 107

County: NAVARRO
Length: 0.2970 MILES
Highway: FM 636
District: DALLAS
Control Number: 0574-02-022
DBE Goal: 800.0%
Project: BR 2B25(119)
Guaranty: $100,000.00
Time: 588 WORKING DAYS
Engineer's Estimate: $10,486,886.95
Date: 09/05/2025 (9 months ago)
Contract Number: 9253211
Type: BRIDGE REPLACEMENT
Project ID: A00133456
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JUAN PAREDES
ELECIA MOORE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$10,486,886.95
$9,649,382.36
Over/Under Est: -7.99% -$837,504.59
$9,894,123.79
Over/Under Est: -5.65% -$592,763.16
Amt Left: 2.54% $244,741.43
Over/Under Est: -4.89% -$512,663.25
Amt Left: 3.37% $324,841.34
Delta: -0.81% -$80,099.91
Over/Under Est: 6.57% $689,027.65
Amt Left: 15.82% $1,526,532.24
Delta: -12.05% -$1,201,690.90
$11,812,159.30
Over/Under Est: 12.64% $1,325,272.35
Amt Left: 22.41% $2,162,776.94
Delta: -5.69% -$636,244.70
$11,932,160.83
Over/Under Est: 13.78% $1,445,273.88
Amt Left: 23.66% $2,282,778.47
Delta: -1.02% -$120,001.53
Over/Under Est: 14.39% $1,509,498.45
Amt Left: 24.32% $2,347,003.04
Delta: -0.54% -$64,224.57
Over/Under Est: 19.1% $2,003,491.67
Amt Left: 29.44% $2,840,996.26
Delta: -4.12% -$493,993.22
Subcontractor Percentage Amount
HILBASH INVESTMENT LLC 11.35% $1,106,062.39
HODGES AND SON CONSTRUCTION COMPANY, INC. 4.26% $415,138.83
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 2.35% $229,008.51
BUYERS BARRICADES, INC. 1.73% $168,589.25
FORTSON CONTRACTING, INC. 1.35% $131,558.08
HERMANOS STEEL, LLC 0.74% $72,113.32
TRP CONSTRUCTION GROUP, LLC 0.64% $62,368.28
ACT SAW CUTTING & REMOVAL 0.05% $4,872.52
Total: 22.47% $2,189,711.18

Bid Items & Bid Tabulations

107 Total 0 of 107
NAVARRO  |  FM 636  |  DALLAS  |  0574-02-022  |  09/05/2025  |  $10,486,886.95  |  BR 2B25(119)  |  BRIDGE REPL  |  588 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
SKYLINE BRIDGE LLC
HIGHWAY 19 CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
A. L. HELMCAMP, INC.
TALBERT COMPANIES LLC
GREY SKY CONSTRUCTION LLC
HARPER BROTHERS CONSTRUCTION LLC
PREPARING ROW
STA 28.000 $8,000.000 $14,000.000 $2,000.000 $5,000.000 $4,000.000 $250.000 $3,300.000 $35,000.000 $10,000.000
REMOV CONC (RIPRAP)
SY 871.000 $32.000 $15.000 $10.000 $25.000 $14.000 $60.000 $33.000 $50.000 $20.000
EXCAV (ROADWAY)
CY 5,740.000 $25.000 $18.000 $18.000 $20.000 $10.000 $11.000 $22.000 $20.000 $25.000
EMBANK (FNL)(DC)(TY C1)
CY 13,045.000 $25.000 $26.000 $27.000 $30.000 $25.000 $35.000 $33.000 $30.000 $35.000
EMBANK (FNL)(DC)(TY C2)
CY 801.000 $75.000 $327.000 $40.000 $50.000 $25.000 $110.000 $33.000 $40.000 $35.000
COMPOST MANUF TOPSOIL (4")
SY 22,220.000 $3.000 $2.200 $4.000 $2.000 $2.000 $2.000 $1.078 $3.000 $1.720
DRILL SEED (PERM_RURAL_CLAY)
SY 22,220.000 $0.500 $0.400 $0.750 $0.450 $0.500 $0.900 $0.418 $0.500 $0.460
DRILL SEED (TEMP_WARM_COOL)
SY 22,220.000 $0.500 $0.400 $0.750 $0.450 $0.500 $0.800 $0.396 $0.500 $0.450
VEGETATIVE WATERING
TGL 6,610.900 $20.000 $1.000 $0.250 $10.000 $1.000 $3.000 $17.600 $10.000 $35.000
FL BS (CMP IN PLC)(TY D GR 1-2) (10")
SY 2,102.000 $30.000 $35.000 $55.000 $35.000 $60.000 $31.000 $38.500 $28.000 $55.000
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 7,651.000 $30.000 $36.000 $45.000 $36.000 $60.000 $37.000 $38.500 $32.000 $60.000
FL BS (RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 1,110.000 $100.000 $96.000 $100.000 $85.000 $85.000 $120.000 $289.300 $80.000 $125.000
REWORK BS MTL (TY C)(6")(ORD COMP)
SY 2,218.000 $3.000 $6.000 $14.000 $10.000 $25.000 $9.000 $22.000 $6.000 $20.000
REWORK BS MTL (TY C)(8")(ORD COMP)
SY 5,433.000 $3.000 $7.000 $10.000 $5.000 $25.000 $4.000 $33.000 $8.000 $20.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 57.220 $350.000 $360.000 $400.000 $350.000 $350.000 $450.000 $375.221 $400.000 $375.000
LIME TRT (EXIST MATL)(8")
SY 2,102.000 $10.000 $10.000 $30.000 $10.000 $15.000 $15.000 $22.000 $12.000 $15.000
CEMENT
TON 63.800 $250.000 $260.000 $350.000 $320.000 $400.000 $290.000 $254.837 $300.000 $275.000
CEMENT TRT (EXIST MATL & NEW BASE)(6")
SY 2,218.000 $2.500 $5.000 $24.000 $10.000 $15.000 $18.000 $22.000 $10.000 $7.500
CEMENT TRT (EXIST MATL & NEW BASE)(8")
SY 5,433.000 $3.500 $5.500 $22.000 $7.000 $15.000 $18.000 $27.500 $12.000 $7.500
SALV, HAUL & STKPL RCL APH PV (3")
SY 1,724.000 $1.000 $6.500 $15.000 $15.000 $25.000 $8.000 $4.400 $10.000 $10.000
PRIME COAT (MULTI OPTION)
GAL 411.000 $5.000 $24.000 $29.000 $22.000 $20.000 $16.000 $24.200 $5.000 $22.000
EMULS ASPH (PRIME)(AE-P)
GAL 1,531.000 $7.000 $28.000 $31.000 $25.000 $15.000 $14.000 $27.500 $5.000 $25.000
ASPH (CRS-2P)
GAL 4,642.000 $6.500 $30.000 $29.500 $27.000 $10.000 $6.000 $30.250 $5.000 $27.500
ASPH (RC-250)
GAL 714.000 $4.500 $56.000 $55.000 $51.000 $15.000 $13.000 $56.100 $5.000 $51.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 3,826.000 $5.500 $28.000 $30.000 $25.000 $15.000 $7.000 $27.500 $5.000 $25.000
AGGR (TY-B, GR-3)(SAC-B)
CY 48.000 $150.000 $1,200.000 $1,400.000 $1,100.000 $1,500.000 $555.000 $1,210.000 $250.000 $1,100.000
AGGR (TY-B, GR-5)(SAC-B)
CY 21.000 $120.000 $1,400.000 $1,500.000 $1,220.000 $1,500.000 $1,100.000 $1,342.000 $250.000 $1,220.000
AGGR (TY-PB, GR-4)(SAC-B)
CY 65.000 $150.000 $1,490.000 $1,600.000 $1,325.000 $1,000.000 $1,200.000 $1,457.500 $250.000 $1,325.000
SP MIXES SP-C SAC-B PG64-22
TON 339.000 $150.000 $266.000 $325.000 $244.000 $250.000 $270.000 $268.400 $200.000 $244.000
TACK COAT
GAL 123.000 $5.000 $1.700 $5.000 $2.000 $10.000 $12.000 $1.650 $6.000 $1.500
CEM STABIL BKFL
CY 151.000 $250.000 $273.000 $325.000 $350.000 $300.000 $350.000 $330.000 $250.000 $400.000
TRENCH EXCAVATION PROTECTION
LF 1,871.000 $10.000 $9.000 $8.000 $10.000 $5.000 $13.000 $9.900 $5.000 $15.000
TEMPORARY SPL SHORING
SF 8,106.000 $40.000 $33.000 $12.500 $55.000 $25.000 $75.000 $49.500 $55.000 $35.000
DRILL SHAFT (24 IN)
LF 2,235.000 $225.000 $184.000 $275.000 $300.000 $155.000 $300.000 $108.944 $225.000 $275.000
DRILL SHAFT (30 IN)
LF 320.000 $280.000 $216.000 $300.000 $350.000 $175.000 $420.000 $117.018 $275.000 $325.000
CL C CONC (ABUT)(HPC)
CY 115.200 $1,500.000 $1,220.000 $1,400.000 $1,300.000 $2,000.000 $4,000.000 $1,705.000 $1,350.000 $3,000.000
CL C CONC (CAP)(HPC)
CY 101.700 $1,500.000 $1,430.000 $1,800.000 $1,550.000 $2,200.000 $4,200.000 $1,925.000 $2,000.000 $3,025.000
CL C CONC (COLUMN)(HPC)
CY 57.600 $2,000.000 $1,700.000 $2,000.000 $1,200.000 $2,200.000 $3,200.000 $1,925.000 $1,350.000 $4,000.000
REINF CONC SLAB (HPC)
SF 16,770.000 $26.000 $31.000 $28.000 $25.000 $24.000 $48.000 $29.700 $22.000 $50.000
APPROACH SLAB
CY 277.000 $800.000 $922.000 $800.000 $800.000 $1,000.000 $1,200.000 $935.000 $1,250.000 $1,100.000
RETAINING WALL (MSE)
SF 3,537.000 $127.000 $70.000 $125.000 $85.000 $120.000 $150.000 $141.900 $55.000 $200.000
PRESTR CONC SLAB BEAM (4SB12)
LF 1,726.020 $250.000 $214.000 $240.000 $250.000 $290.000 $240.000 $190.069 $210.000 $300.000
PRESTR CONC SLAB BEAM (5SB12)
LF 1,844.520 $270.000 $221.000 $240.000 $250.000 $290.000 $240.000 $190.069 $210.000 $300.000
RIPRAP (MOW STRIP)(4 IN)
CY 111.200 $750.000 $630.000 $750.050 $500.000 $700.000 $750.000 $880.000 $550.000 $750.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 322.000 $200.000 $132.000 $130.000 $130.000 $160.000 $130.000 $220.000 $185.000 $175.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 2,146.000 $185.000 $127.000 $130.000 $130.000 $180.000 $120.000 $231.000 $190.000 $175.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 5,929.000 $220.000 $127.000 $141.000 $135.000 $242.000 $120.000 $231.000 $200.000 $175.000
RIPRAP (STONE PROTECTION)(36 IN)
CY 2,761.000 $240.000 $127.000 $150.000 $140.000 $300.000 $120.000 $231.000 $250.000 $180.000
RAIL (TY T221)
LF 332.000 $200.000 $120.000 $165.000 $180.000 $170.000 $180.000 $209.000 $250.000 $250.000
RAIL (TY T223)(HPC)
LF 850.000 $150.000 $125.000 $175.000 $220.000 $170.000 $240.000 $220.000 $250.000 $250.000
TYPE A JOINT
LF 413.000 $165.000 $55.000 $95.000 $180.000 $100.000 $52.000 $132.000 $100.000 $10.000
RC PIPE (CL III)(24 IN)
LF 80.000 $115.000 $135.000 $100.000 $110.000 $120.000 $110.000 $143.000 $105.000 $175.000
RC PIPE (CL III)(30 IN)
LF 30.000 $140.000 $175.000 $150.000 $170.000 $125.000 $225.000 $176.000 $150.000 $275.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,700.000 $2,600.000 $3,500.000 $2,690.000 $3,500.000 $1,300.000 $2,420.000 $2,500.000 $4,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $3,200.000 $5,000.000 $6,000.000 $5,870.000 $3,500.000 $2,900.000 $6,050.000 $3,000.000 $5,225.000
REMOV STR (SET)
EA 2.000 $550.000 $1,000.000 $500.000 $500.000 $500.000 $1,600.000 $660.000 $50.000 $675.000
REMOV STR (PIPE)
LF 65.000 $25.000 $30.000 $20.000 $50.000 $10.000 $95.000 $30.800 $30.000 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $35,000.000 $23,000.000 $30,000.000 $50,000.000 $36,000.000 $95,000.000 $44,000.000 $50,000.000 $60,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $45,000.000 $40,000.000 $50,000.000 $50,000.000 $50,000.000 $150,000.000 $55,000.000 $250,000.000 $100,000.000
MOBILIZATION
LS 1.000 $930,000.000 $961,038.960 $800,000.000 $400,000.000 $1,015,000.000 $1,100,000.000 $1,171,733.330 $1,000,000.000 $599,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $6,500.000 $7,700.000 $2,000.000 $5,000.000 $2,500.000 $5,050.000 $5,500.000 $10,000.000 $6,675.000
TMA (STATIONARY)
DAY 4.000 $215.000 $400.000 $400.000 $1,000.000 $350.000 $450.000 $300.058 $250.000 $200.000
TMA (MOBILE OPERATION)
DAY 4.000 $200.000 $800.000 $150.000 $1,000.000 $350.000 $780.000 $434.126 $550.000 $895.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 709.000 $45.000 $40.000 $40.000 $45.000 $1.000 $41.000 $47.938 $30.000 $55.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 260.000 $80.000 $90.000 $55.000 $65.000 $1.000 $80.000 $94.897 $50.000 $143.750
ROCK FILTER DAMS (REMOVE)
LF 969.000 $15.000 $12.000 $5.000 $15.000 $1.000 $13.000 $22.649 $20.000 $38.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,956.000 $35.000 $40.000 $15.000 $25.000 $1.000 $35.000 $39.369 $50.000 $45.100
CONSTRUCTION EXITS (REMOVE)
SY 1,956.000 $12.000 $12.000 $5.000 $15.000 $1.000 $10.000 $15.312 $20.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,230.000 $4.000 $4.000 $3.500 $4.000 $1.000 $4.300 $5.489 $4.000 $3.900
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,230.000 $1.000 $1.200 $1.000 $1.000 $1.000 $1.000 $1.760 $2.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 440.000 $6.000 $7.000 $12.000 $10.000 $5.000 $6.500 $8.107 $10.000 $21.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 440.000 $1.500 $1.400 $6.000 $1.000 $1.000 $2.200 $2.431 $5.000 $10.000
CONSTRUCTING DETOURS
SY 1,565.000 $125.000 $115.000 $135.000 $180.000 $100.000 $110.000 $110.000 $50.000 $185.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 35.000 $5,500.000 $3,300.000 $3,000.000 $7,500.000 $4,000.000 $5,500.000 $6,285.719 $6,500.000 $3,700.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 4,560.000 $45.000 $40.000 $49.000 $75.000 $80.000 $62.000 $59.158 $100.000 $10.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,250.000 $15.000 $8.000 $50.000 $25.000 $20.000 $22.000 $18.458 $20.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 4,560.000 $15.000 $14.000 $11.000 $25.000 $35.000 $25.000 $25.454 $20.000 $5.000
DRIVEWAYS (ACP)
SY 240.000 $60.000 $156.000 $150.000 $70.000 $50.000 $125.000 $104.500 $50.000 $135.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 450.000 $0.500 $14.000 $10.000 $6.000 $30.000 $9.000 $9.350 $0.500 $17.500
RIGHT OF WAY MARKERS
EA 25.000 $400.000 $230.000 $500.000 $100.000 $80.000 $900.000 $476.146 $500.000 $500.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,525.000 $26.000 $32.000 $34.000 $27.000 $30.000 $30.000 $31.350 $30.000 $31.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 13.000 $2,300.000 $2,500.000 $2,000.000 $1,850.000 $2,000.000 $2,300.000 $2,420.000 $1,850.000 $2,175.000
SHORT RADIUS (28")
LF 42.000 $50.000 $34.000 $150.000 $55.000 $35.000 $32.000 $33.000 $100.000 $54.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,300.000 $2,000.000 $2,100.000 $1,500.000 $1,300.000 $1,320.000 $1,850.000 $1,550.000
REMOVE METAL BEAM GUARD FENCE
LF 1,600.000 $3.500 $4.500 $5.000 $3.000 $2.000 $4.000 $4.400 $3.000 $4.250
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $350.000 $255.000 $250.000 $2,750.000 $100.000 $270.000 $275.000 $500.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $3,200.000 $3,000.000 $3,400.000 $3,200.000 $3,000.000 $3,100.000 $3,245.000 $3,850.000 $2,975.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $350.000 $255.000 $500.000 $350.000 $500.000 $260.000 $275.000 $1,500.000 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,700.000 $1,250.000 $2,000.000 $2,000.000 $2,500.000 $1,300.000 $1,320.000 $6,500.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $900.000 $900.000 $1,000.000 $2,500.000 $1,000.000 $900.000 $935.000 $2,500.000 $1,250.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 11.000 $9,000.000 $9,000.000 $9,250.000 $7,500.000 $9,000.000 $8,000.000 $8,250.000 $21,000.000 $4,500.000
PIPE UNDERDRAINS (TY 7) (6")
LF 358.000 $40.000 $42.000 $100.000 $35.000 $40.000 $42.000 $66.000 $60.000 $75.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $290.000 $312.000 $750.000 $350.000 $2,500.000 $980.000 $341.000 $850.000 $320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $725.000 $660.000 $1,200.000 $850.000 $2,000.000 $1,300.000 $825.000 $1,150.000 $720.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 33.000 $25.000 $42.000 $30.000 $35.000 $45.000 $45.000 $44.000 $100.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 37.000 $30.000 $46.000 $30.000 $35.000 $45.000 $48.000 $44.000 $100.000 $65.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 217.000 $5.500 $7.000 $6.000 $8.000 $10.000 $5.500 $4.785 $6.000 $8.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 17,739.000 $1.500 $1.500 $1.500 $2.500 $2.500 $1.100 $0.924 $1.000 $2.500
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 120.000 $12.000 $10.000 $15.000 $10.000 $15.000 $8.000 $6.985 $20.000 $10.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 16,500.000 $1.000 $1.400 $1.500 $2.500 $2.500 $1.100 $0.924 $1.000 $2.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,644.000 $1.500 $1.400 $1.500 $1.000 $2.000 $4.000 $4.400 $6.000 $2.380
PAVEMENT SLER 4"
LF 10,776.000 $0.500 $0.500 $0.750 $0.500 $0.600 $0.400 $0.330 $1.000 $0.500
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 5,388.000 $1.000 $1.300 $1.500 $3.000 $3.000 $1.000 $0.869 $2.000 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 5,388.000 $1.000 $1.300 $1.500 $3.000 $3.000 $1.000 $0.869 $2.000 $3.000
REFL PAV MRKR TY II-A-A
EA 73.000 $5.500 $17.000 $20.000 $10.000 $15.000 $13.000 $11.000 $6.000 $10.000
ELIM EXT PM & MRKS (4")
LF 23,966.000 $0.500 $1.100 $0.900 $0.700 $1.000 $0.700 $0.660 $1.000 $0.700
FULL - WIDTH MOWING
AC 1.530 $35.000 $4,000.000 $1,000.000 $5,000.000 $100.000 $6,000.000 $4,400.000 $1,000.000 $5,000.000
Totals: $10,486,886.950 $9,649,382.360 $9,894,123.785 $9,974,223.700 $11,175,914.600 $11,812,159.300 $11,932,160.828 $11,996,385.400 $12,490,378.620
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $100,000.00