Show Job Controls
Bid Cobra

NAVARRO US 287 (0122-01-043)

Items: 50

County: NAVARRO
Length: N/A
Highway: US 287
District: DALLAS
Control Number: 0122-01-043
DBE Goal: N/A
Project: STP 1902(238)
Guaranty: N/A
Time: 88 WORKING DAYS
Engineer's Estimate: $2,972,501.16
Date: 11/05/2019 (6 years ago)
Contract Number: N/A
Type: PAVEMENT REPAIR, OVERLAY AND PAVEMENT MARKINGS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,972,501.16
$2,787,386.38
Over/Under Est: -6.23% -$185,114.78
Over/Under Est: -2.86% -$85,028.85
Amt Left: 3.59% $100,085.93
Over/Under Est: 1.67% $49,580.95
Amt Left: 8.42% $234,695.73
Delta: -4.66% -$134,609.80
Over/Under Est: 19.81% $588,745.29
Amt Left: 27.76% $773,860.07
Delta: -17.84% -$539,164.34
Over/Under Est: 21.09% $627,038.74
Amt Left: 29.14% $812,153.52
Delta: -1.08% -$38,293.45

Bid Items & Bid Tabulations

50 Total 0 of 50
NAVARRO  |  US 287  |  DALLAS  |  0122-01-043  |  11/05/2019  |  $2,972,501.16  |  STP 1902(238)  |  PAVMT REPAIR, OVERLAY AND PAVMT MRK  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
FOUTSCO PAVING COMPANY, LLC
TEXAS MATERIALS GROUP, INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
PREPARING ROW
STA 153.900 $300.000 $100.000 $25.000 $100.000 $150.000 $45.000
COMPOST MANUF TOPSOIL (4")
SY 744.000 $4.250 $6.000 $3.250 $10.000 $3.300 $14.350
BLOCK SODDING
SY 744.000 $5.000 $5.000 $5.500 $10.000 $8.750 $9.880
VEGETATIVE WATERING
MG 64.600 $36.000 $25.000 $30.000 $40.000 $30.000 $201.500
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 11,697.000 $91.750 $82.000 $85.000 $104.000 $100.100 $106.000
SUPERPAVE MIXTURES SP-C SAC-B PG64-22
TON 8,156.000 $82.750 $80.000 $85.000 $102.750 $96.000 $97.650
TACK COAT
GAL 12,634.000 $3.000 $3.000 $2.500 $3.200 $3.400 $3.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 471.000 $70.000 $47.000 $45.000 $65.000 $86.000 $66.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,439.000 $92.000 $77.000 $89.000 $95.000 $116.000 $88.000
FLEX PAVE STRUCTURE REPAIR (8"-10")
SY 214.000 $88.000 $67.000 $125.000 $115.000 $181.000 $125.000
PLANE ASPH CONC PAV (2")
SY 180,474.000 $1.450 $1.500 $1.850 $1.240 $2.350 $2.100
RIPRAP (MOW STRIP)(4 IN)
CY 175.000 $480.000 $650.000 $575.000 $575.000 $700.000 $750.000
MOBILIZATION
LS 1.000 $216,364.000 $200,000.000 $202,000.000 $87,000.000 $300,000.000 $355,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $10,000.000 $8,000.000 $6,000.000 $20,000.000 $18,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,375.000 $1.960 $3.000 $2.100 $1.500 $1.900 $3.700
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,375.000 $0.640 $0.650 $0.500 $0.400 $0.350 $1.390
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 900.000 $4.600 $6.000 $6.000 $4.000 $4.800 $5.940
BIODEG EROSN CONT LOGS (REMOVE)
LF 900.000 $1.390 $1.250 $1.000 $0.500 $0.750 $1.390
RUMBLE STRIPS (SHOULDER)
LF 87,099.000 $0.180 $0.200 $0.110 $0.120 $0.100 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,562.500 $18.200 $25.000 $22.000 $17.250 $23.000 $20.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $980.000 $1,500.000 $1,375.000 $850.000 $1,100.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 900.000 $2.890 $2.000 $2.200 $2.250 $5.450 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 28.000 $2,550.000 $2,400.000 $2,550.000 $2,450.000 $2,675.000 $2,375.000
GUARDRAIL END TREATMENT (REMOVE)
EA 28.000 $285.000 $225.000 $250.000 $200.000 $275.000 $225.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 42.000 $39.000 $25.000 $27.000 $25.000 $60.000 $25.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 10,850.000 $0.260 $0.400 $0.360 $0.300 $0.330 $0.360
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 526.000 $0.680 $0.500 $0.700 $0.600 $0.650 $0.700
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 88.000 $6.500 $2.000 $5.000 $6.000 $6.550 $5.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 7.000 $110.000 $50.000 $100.000 $140.000 $153.000 $100.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $98.000 $50.000 $125.000 $150.000 $175.000 $125.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,640.000 $0.270 $0.370 $0.360 $0.300 $0.330 $0.360
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 32,595.000 $0.240 $0.310 $0.300 $0.300 $0.330 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 7,050.000 $1.050 $1.000 $1.250 $1.250 $0.800 $1.050
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 3,775.000 $1.050 $1.000 $1.250 $1.250 $0.900 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,421.000 $0.980 $1.000 $1.220 $1.000 $0.850 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 88.000 $5.900 $12.000 $5.560 $6.000 $6.500 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 15.000 $135.000 $180.000 $138.000 $140.000 $155.000 $125.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 6.000 $160.000 $265.000 $160.000 $160.000 $175.000 $145.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 590.000 $3.920 $4.000 $3.330 $4.000 $3.800 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 10,847.000 $0.340 $0.450 $0.480 $0.400 $0.500 $0.430
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 71,457.000 $0.360 $0.410 $0.410 $0.400 $0.500 $0.370
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 2,640.000 $0.430 $0.440 $0.480 $0.500 $0.500 $0.430
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 65,434.000 $0.320 $0.440 $0.410 $0.400 $0.450 $0.370
REFL PAV MRKR TY I-C
EA 23.000 $6.100 $6.000 $4.250 $5.000 $5.500 $4.000
REFL PAV MRKR TY II-A-A
EA 858.000 $3.550 $5.000 $4.250 $5.000 $3.800 $4.000
REFL PAV MRKR TY II-C-R
EA 815.000 $3.820 $5.000 $4.250 $3.500 $3.800 $4.000
FULL - WIDTH MOWING
AC 149.000 $145.000 $100.000 $75.000 $75.000 $75.000 $185.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,500.000 $5,000.000 $2,500.000 $1,000.000 $5,000.000 $6,500.000
TMA (STATIONARY)
DAY 84.000 $250.000 $250.000 $200.000 $75.000 $440.000 $215.000
TMA (MOBILE OPERATION)
HR 250.000 $46.000 $25.000 $35.000 $10.000 $11.000 $65.000
Totals: $2,972,501.160 $2,787,386.380 $2,887,472.310 $3,022,082.115 $3,561,246.450 $3,599,539.900