NAVARRO BI 45-F (0092-13-033)

Items: 62

County: NAVARRO
Length: N/A
Highway: BI 45-F
District: DALLAS
Control Number: 0092-13-033
DBE Goal: 0.0%
Project: C 92-13-33
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $4,635,544.10
Date: 03/05/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
JUAN PAREDES
AMANDA MCKITTRICK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,635,544.10
$4,119,672.99
Over/Under Est: -11.13% -$515,871.11
Over/Under Est: -4.32% -$200,035.10
Amt Left: 7.67% $315,836.01
Over/Under Est: -3.25% -$150,650.12
Amt Left: 8.87% $365,220.99
Delta: -1.11% -$49,384.98
$6,008,536.00
Over/Under Est: 29.62% $1,372,991.90
Amt Left: 45.85% $1,888,863.01
Delta: -33.97% -$1,523,642.02
Subcontractor Percentage Amount
CEN-TREE SOLUTIONS LLC 0.00% $0.00
FORTSON CONTRACTING, INC. 0.00% $0.00
JR WEST TEXAS CONCRETE LLC 0.00% $0.00
SUPERIOR TRAFFIC CONTROL, LLC 0.00% $0.00
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.00% $0.00
WEST TEXAS ROCK RESOURCES, LLC 0.00% $0.00
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

62 Total 0 of 62
NAVARRO  |  BI 45-F  |  DALLAS  |  0092-13-033  |  03/05/2024  |  $4,635,544.10  |  C 92-13-33  |  REHAB EXIST ROADWAY  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
FNH CONSTRUCTION, LLC
REMOVING CONC (CURB)
LF 197.000 $12.000 $25.000 $50.000 $19.000 $20.000
BACKFILL (TY A OR B)
STA 227.000 $225.000 $260.000 $300.000 $236.000 $250.000
BLOCK SODDING
SY 823.000 $10.000 $7.500 $10.000 $10.000 $10.000
VEGETATIVE WATERING
MG 123.000 $25.000 $80.000 $35.000 $50.000 $50.000
FLEX PAVEMENT STRUCTURE REPAIR (5"-10")
SY 9,283.000 $80.000 $70.000 $80.000 $75.000 $95.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 165,099.000 $2.750 $2.350 $3.500 $2.500 $4.000
MOBILIZATION
LS 1.000 $421,413.100 $314,400.000 $375,000.000 $368,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $8,000.000 $1,030.000 $5,000.000 $10,000.000 $12,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $5.000 $6.000 $5.000 $20.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $1.000 $3.000 $2.000 $5.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $10.000 $6.000 $7.000 $15.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $3.000 $2.000 $5.000 $9.000
CONC CURB (TY II)
LF 261.000 $30.000 $52.000 $75.000 $75.000 $55.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 15,428.000 $0.400 $0.490 $0.500 $0.750 $0.500
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 7,582.000 $0.400 $1.260 $1.500 $0.750 $0.500
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $30.000 $22.500 $50.000 $50.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,750.000 $1,850.000 $2,500.000 $4,000.000 $1,850.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,150.000 $1,200.000 $2,200.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $10.000 $3.000 $5.000 $22.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $125.000 $250.000 $900.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 50.000 $45.000 $20.500 $30.000 $50.000 $100.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $100.000 $75.000 $100.000 $175.000 $100.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 11,330.000 $0.500 $0.300 $0.550 $0.560 $1.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 3,248.000 $0.600 $0.400 $1.000 $0.810 $1.250
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 1,577.000 $3.500 $0.480 $5.000 $4.350 $8.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 490.000 $7.000 $3.640 $10.000 $8.690 $10.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 21.000 $125.000 $87.000 $150.000 $157.000 $300.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 3.000 $225.000 $143.000 $400.000 $435.000 $1,000.000
WK ZN PAV MRK NON-REMOV (W)(SYMBOL)
EA 3.000 $150.000 $128.000 $300.000 $325.000 $500.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 19.000 $250.000 $126.000 $250.000 $239.000 $500.000
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI)
EA 33.000 $25.000 $51.000 $100.000 $82.000 $150.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 39,188.000 $0.500 $0.310 $0.500 $0.520 $1.000
WK ZN PAV MRK NON-REMOV (Y)12"(SLD)
LF 1,368.000 $3.500 $0.480 $5.000 $5.430 $8.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 3,399.000 $3.500 $0.960 $1.500 $1.500 $6.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,000.000 $1.600 $0.960 $1.500 $1.500 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,248.000 $1.600 $2.240 $1.000 $1.090 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,577.000 $5.250 $2.700 $5.000 $4.620 $7.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 490.000 $9.000 $5.000 $10.000 $10.870 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 21.000 $170.000 $185.000 $200.000 $179.000 $350.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 19.000 $225.000 $198.000 $250.000 $245.000 $350.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 3.000 $500.000 $255.000 $400.000 $435.000 $1,000.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 3.000 $350.000 $165.000 $300.000 $325.000 $500.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 33.000 $45.000 $38.000 $100.000 $82.000 $150.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 1,368.000 $5.500 $2.700 $5.000 $5.430 $10.000
PAVEMENT SEALER 6"
LF 5,558.000 $0.250 $0.330 $0.500 $0.380 $0.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 11,330.000 $0.800 $0.980 $0.750 $0.770 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 36,326.000 $0.800 $0.980 $0.750 $0.710 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 39,188.000 $0.800 $0.980 $0.750 $0.710 $1.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 14,288.000 $0.800 $0.970 $1.250 $1.250 $1.500
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 13,524.000 $0.800 $0.970 $1.250 $1.250 $1.500
REFL PAV MRKR TY I-C
EA 836.000 $5.000 $4.150 $6.000 $5.700 $6.000
REFL PAV MRKR TY II-A-A
EA 1,027.000 $5.000 $4.800 $6.000 $5.700 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 5,558.000 $0.350 $0.270 $1.000 $0.810 $1.250
PAV SURF PREP FOR MRK (6")
LF 5,558.000 $0.100 $0.200 $0.250 $0.110 $0.250
TREE REMOVAL (36" - 42" DIA)
EA 3.000 $1,000.000 $1,395.000 $10,500.000 $4,000.000 $10,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 720.000 $10.000 $25.000 $25.000 $20.000 $10.000
DRAIN INLET CLEANING
EA 10.000 $900.000 $2,000.000 $2,500.000 $1,500.000 $2,500.000
SP MIXES SP-C SAC-B PG70-22
TON 19,069.000 $130.000 $120.750 $111.000 $129.000 $160.000
TACK COAT
GAL 18,161.000 $3.500 $2.650 $4.000 $0.010 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $11,400.000 $12,500.000 $17,500.000 $16,500.000
TMA (STATIONARY)
DAY 125.000 $400.000 $216.500 $250.000 $250.000 $250.000
TMA (MOBILE OPERATION)
HR 224.000 $80.000 $40.000 $50.000 $40.000 $85.000
Totals: $4,635,544.100 $4,119,672.990 $4,435,509.000 $4,484,893.980 $6,008,536.000