NACOGDOCHES SH0007 (6353-36-001)

Items: 34

County: NACOGDOCHES
Length: N/A
Highway: SH0007
District: LUFKIN
Control Number: 6353-36-001
DBE Goal: N/A
Project: RMC - 635336001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $268,060.00
Date: 01/15/2020 (6 years ago)
Contract Number: N/A
Type: REPAIR AND MAINTENANCE OF METAL BEAM GUARD FENCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$268,060.00
$237,135.00
Over/Under Est: -11.54% -$30,925.00
Over/Under Est: 4.75% $12,735.00
Amt Left: 18.41% $43,660.00

Bid Items & Bid Tabulations

34 Total 0 of 34
NACOGDOCHES  |  SH0007  |  LUFKIN  |  6353-36-001  |  01/15/2020  |  $268,060.00  |  RMC - 635336001  |  REPAIR AND MAINT OF METAL BEAM GUARD...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SJ&J CONSTRUCTION, LLC
ACE CONTRACTORS, INC.
REMOVING CONC (CURB)
LF 125.000 $15.000 $15.000 $20.000
RAIL (TY T631)
LF 75.000 $120.000 $140.000 $100.000
RAIL (TY T631LS)
LF 20.000 $75.000 $100.000 $75.000
MOBILIZATION (CALLOUT)
EA 24.000 $1,500.000 $1,000.000 $750.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,100.000 $25.000 $34.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $1,200.000 $1,800.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 8.000 $1,600.000 $1,200.000 $1,200.000
SHORT RADIUS
LF 50.000 $65.000 $35.000 $50.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 2.000 $1,000.000 $1,000.000 $750.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,200.000 $1,100.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 75.000 $75.000 $60.000 $5.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 3.000 $2,500.000 $1,300.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 2,000.000 $3.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 10.000 $170.000 $190.000 $1.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 40.000 $150.000 $120.000 $1.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 10.000 $175.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,200.000 $2,900.000 $4,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 10.000 $1,900.000 $1,200.000 $50.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $13,500.000 $3,000.000 $20,000.000
CRASH CUSH ATTEN (REMOVE)
EA 5.000 $1,450.000 $2,000.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 10.000 $35.000 $30.000 $20.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 10.000 $65.000 $60.000 $20.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 75.000 $85.000 $45.000 $50.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 15.000 $75.000 $55.000 $80.000
REALIGN POSTS
EA 30.000 $65.000 $20.000 $25.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 15.000 $35.000 $28.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 5.000 $20.000 $28.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $120.000 $60.000 $100.000
REPLACE TERMINAL ANCHOR POSTS
EA 20.000 $3.000 $60.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $3,150.000 $2,900.000 $4,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $450.000 $850.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 8.000 $120.000 $150.000 $500.000
REPLACE SGT OBJECT MARKER
EA 5.000 $3.000 $30.000 $50.000
TMA (STATIONARY)
DAY 24.000 $200.000 $100.000 $750.000
Totals: $268,060.000 $237,135.000 $280,795.000