Bid Cobra

NACOGDOCHES FM 1878 (1810-01-036)

Items: 87

County: NACOGDOCHES
Length: N/A
Highway: FM 1878
District: LUFKIN
Control Number: 1810-01-036
DBE Goal: N/A
Project: STP 2023(635)HES
Guaranty: N/A
Time: 152 WORKING DAYS
Engineer's Estimate: $4,151,943.75
Date: 05/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
RANDAL COOPER
CLEOPHA BLANTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$4,151,943.75
Over/Under Est: 17.2% $714,186.96
Over/Under Est: 20.43% $848,056.24
Amt Left: 2.75% $133,869.28
$5,718,414.72
Over/Under Est: 37.73% $1,566,470.97
Amt Left: 17.51% $852,284.01
Delta: -14.37% -$718,414.73
Subcontractor Percentage Amount
J & M CONTRACTING, COMPANY 21.37% $1,041,115.92
DREWERY BROS. TREE SERVICE, INC. 2.28% $111,078.35
STRIPING TECHNOLOGY, L.P. 1.82% $88,667.80
SOUTHWEST ENVIRONMENT SERVICES LLC 1.12% $54,564.80
ISAACS CONSTRUCTION SERVICES LLC 1.07% $52,128.87
FREDONIA SERVICES LLC 1.07% $52,128.87
AMERICAN REMEDIATION OPTIONS, INC. 0.75% $36,538.93
PANOLA SIGN & BARRICADE, INC. 0.32% $15,589.94
Total: 29.80% $1,451,813.48

Bid Items & Bid Tabulations

87 Total 0 of 87
NACOGDOCHES  |  FM 1878  |  LUFKIN  |  1810-01-036  |  05/05/2023  |  $4,151,943.75  |  STP 2023(635)HES  |  HAZARD ELIM & SAFETY  |  152 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PINTO CONSTRUCTION CO., INC.
A. L. HELMCAMP, INC.
PREPARING ROW
STA 122.000 $1,000.000 $1,325.000 $3,400.000 $4,000.000
REMOVING CONC (PAV)
SY 89.000 $25.000 $80.000 $31.900 $32.000
SUBGRADE WIDENING (ORD COMP)
STA 122.000 $400.000 $400.000 $481.810 $900.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 15,549.000 $20.000 $32.000 $21.000 $28.500
BLADING
STA 122.000 $200.000 $285.000 $398.560 $500.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 143.000 $175.000 $230.000 $150.000 $72.000
BLOCK SODDING
SY 1,455.000 $5.000 $6.300 $5.850 $6.500
BROADCAST SEED (TEMP) (WARM)
SY 47,048.000 $0.150 $0.160 $0.140 $0.200
BROADCAST SEED (TEMP) (COOL)
SY 47,048.000 $0.150 $0.160 $0.130 $0.200
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 94,095.000 $0.400 $0.400 $0.390 $0.440
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 400.000 $1.000 $2.650 $2.620 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 400.000 $1.000 $2.650 $2.620 $1.000
VEGETATIVE WATERING
MG 3,794.400 $10.000 $5.000 $0.010 $0.800
SPRINKLING (DUST CONTROL)
MG 381.000 $10.000 $5.000 $0.010 $9.250
FL BS (RDWY DEL) (TY D GR 1-2)
TON 13,617.000 $55.000 $53.000 $61.980 $71.000
CEMENT
TON 686.000 $250.000 $265.000 $269.280 $260.000
CEMENT TREAT(MX EXST MTL & NW BS)(12")
SY 37,069.000 $4.000 $6.500 $5.500 $6.500
EMULS ASPH (EROSN CONT)(SS-1)
GAL 28,229.000 $6.000 $4.000 $0.010 $4.400
FOG SEAL (SS-1 OR CSS-1)
GAL 1,483.000 $12.000 $9.000 $8.280 $8.500
ASPH (RC-250)
TON 42.000 $1,400.000 $1,100.000 $1,354.510 $1,100.000
AGGR (TY-PE, E, L OR PL GR 3)
CY 317.000 $300.000 $230.000 $205.590 $324.000
AGGR (TY E OR L GR 5)
CY 273.000 $300.000 $205.000 $185.770 $297.000
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 283.000 $200.000 $240.000 $155.940 $348.000
ASPH (AC-15P OR CRS-2P)
TON 152.000 $1,000.000 $1,100.000 $1,025.090 $1,000.000
CEM STABIL BKFL
CY 261.000 $150.000 $278.250 $291.500 $292.000
CUT & RESTORE ASPH PAVING
SY 79.000 $175.000 $152.250 $159.500 $160.000
TRENCH EXCAVATION PROTECTION
LF 7.000 $100.000 $50.000 $36.340 $36.000
TEMPORARY SPL SHORING
SF 2,710.000 $30.000 $47.000 $49.500 $50.000
CL C CONC (COLLAR)
EA 3.000 $1,300.000 $945.000 $990.000 $990.000
RIPRAP (CONC)(4 IN)
CY 90.000 $1,000.000 $997.500 $1,045.000 $1,045.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 293.000 $225.000 $210.000 $220.000 $220.000
CONC BOX CULV (8 FT X 7 FT)
LF 58.000 $1,200.000 $1,890.000 $1,980.000 $1,980.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 6.000 $850.000 $1,210.000 $1,155.000 $1,155.000
CONC BOX CULV (7 FT X 7 FT)(EXTEND)
LF 42.000 $1,200.000 $1,315.000 $1,155.000 $1,155.000
RC PIPE (CL III)(18 IN)
LF 954.000 $55.000 $85.000 $88.000 $88.000
RC PIPE (CL III)(24 IN)
LF 40.000 $80.000 $130.000 $132.000 $132.000
HEADWALL (CH - PW - 0) (DIA= 33 IN)
EA 1.000 $7,200.000 $9,000.000 $9,350.000 $9,350.000
HEADWALL (CH - PW - 0) (DIA= 48 IN)
EA 1.000 $11,500.000 $16,000.000 $16,500.000 $16,500.000
HEADWALL (CH - PW - 0) (DIA= 54 IN)
EA 1.000 $17,000.000 $21,000.000 $21,391.700 $21,391.700
HEADWALL (CH - PW - 0) (DIA= 66 IN)
EA 3.000 $19,000.000 $22,000.000 $23,100.000 $23,100.000
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 3.000 $21,000.000 $23,500.000 $24,200.000 $24,200.000
WINGWALL (PW - 2) (HW=8 FT)
EA 5.000 $24,000.000 $34,650.000 $36,300.000 $36,300.000
WINGWALL (PW - 2) (HW=9 FT)
EA 1.000 $27,000.000 $40,950.000 $42,900.000 $42,900.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $1,000.000 $1,045.000 $1,045.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 52.000 $750.000 $1,100.000 $1,100.000 $1,100.000
CLEAN EXIST CULVERTS
EA 3.000 $1,100.000 $1,900.000 $1,320.000 $1,320.000
REMOV STR (BOX CULVERT)
LF 40.000 $100.000 $262.500 $275.000 $275.000
REMOV STR (PIPE)
EA 26.000 $300.000 $472.500 $495.000 $495.000
MOBILIZATION
LS 1.000 $353,300.000 $425,000.000 $499,000.000 $470,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $2,500.000 $11,000.000 $3,500.000 $11,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 600.000 $30.000 $42.000 $17.000 $38.500
ROCK FILTER DAMS (REMOVE)
LF 600.000 $8.000 $13.000 $6.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 250.000 $20.000 $5.000 $1.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 250.000 $10.000 $1.000 $1.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,435.000 $3.000 $4.000 $10.000 $4.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,435.000 $1.000 $1.000 $4.000 $1.000
DRIVEWAYS (CONC)
SY 130.000 $165.000 $160.650 $168.300 $168.000
DRIVEWAYS (ACP)
SY 555.000 $70.000 $88.000 $59.120 $55.000
DRIVEWAYS (SURF TREAT)
SY 1,516.000 $55.000 $62.000 $59.120 $108.000
TURNOUTS (SURF TREAT)
SY 626.000 $50.000 $70.000 $66.170 $118.000
MTL W-BEAM GD FEN (TIM POST)
LF 375.000 $40.000 $25.000 $35.270 $33.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $3,150.000 $3,410.000 $3,200.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $540.000 $600.000 $721.600 $610.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 14.000 $400.000 $310.000 $309.100 $325.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $280.000 $310.000 $357.500 $325.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $670.000 $735.000 $781.000 $770.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,000.000 $1,250.000 $1,113.210 $1,300.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 12.000 $450.000 $460.000 $522.500 $479.000
REMOVE SM RD SN SUP&AM
EA 8.000 $100.000 $170.000 $103.400 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $35.000 $26.000 $35.200 $43.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 16.000 $120.000 $79.000 $148.500 $99.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 48,715.000 $0.350 $0.420 $0.440 $0.440
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 48,600.000 $0.350 $0.420 $0.440 $0.440
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,648.000 $1.200 $1.800 $2.000 $2.000
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 24,358.000 $1.750 $1.050 $1.100 $1.100
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 900.000 $3.000 $2.100 $2.200 $2.250
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 19,800.000 $2.000 $1.050 $1.100 $1.100
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 22.000 $35.000 $21.000 $22.000 $22.000
REFL PAV MRKR TY II-A-A
EA 293.000 $9.000 $5.250 $5.500 $5.500
SP MIXES SP-B PG64-22
TON 595.000 $200.000 $235.000 $288.750 $225.000
SP MIXES SP-D PG64-22 (EXEMPT)
TON 57.000 $300.000 $560.000 $370.640 $426.000
BONDING COURSE
GAL 91.000 $10.000 $8.000 $11.000 $39.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $100.000 $10.000 $1.000 $300.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $22,000.000 $60,000.000 $25,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 135.000 $15.000 $16.000 $16.500 $16.500
TMA (STATIONARY)
DAY 148.000 $250.000 $100.000 $300.000 $190.000
TMA (MOBILE OPERATION)
DAY 8.000 $200.000 $50.000 $50.000 $920.000
Totals: $4,151,943.750 $4,866,130.710 $4,999,999.994 $5,718,414.720