Items: 62

County: NACOGDOCHES
Length: N/A
Highway: US 59
District: LUFKIN
Control Number: 0176-01-112
DBE Goal: N/A
Project: NH 2020(882)
Guaranty: N/A
Time: 52 WORKING DAYS
Engineer's Estimate: $1,353,958.25
Date: 06/05/2020 (6 years ago)
Contract Number: N/A
Type: WIDENING EXIST PAVEMENT FOR ACCELERATION LANE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,353,958.25
Over/Under Est: -21.14% -$286,230.27
Over/Under Est: -13.42% -$181,703.24
Amt Left: 9.79% $104,527.03
$1,327,295.77
Over/Under Est: -1.97% -$26,662.48
Amt Left: 24.31% $259,567.79
Delta: -13.23% -$155,040.76
$1,372,606.82
Over/Under Est: 1.38% $18,648.57
Amt Left: 28.55% $304,878.84
Delta: -3.41% -$45,311.05
Over/Under Est: 3.43% $46,448.92
Amt Left: 31.16% $332,679.19
Delta: -2.03% -$27,800.35

Bid Items & Bid Tabulations

62 Total 0 of 62
NACOGDOCHES  |  US 59  |  LUFKIN  |  0176-01-112  |  06/05/2020  |  $1,353,958.25  |  NH 2020(882)  |  WIDENING EXIST PAVMT FOR ACCELERATIO...  |  52 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MOORE BROTHERS CONSTRUCTION COMPANY
LONGVIEW BRIDGE AND ROAD, LTD.
DREWERY & WHEATON, LLC
A. L. HELMCAMP, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 11.000 $1,000.000 $2,075.000 $1,000.000 $2,750.000 $10,000.000 $5,000.000
REMOVING STAB BASE AND ASPH PAV (11")
SY 1,025.000 $10.000 $8.100 $17.000 $28.000 $25.000 $20.000
EXCAVATION (ROADWAY)
CY 1,871.000 $10.000 $13.100 $10.000 $18.000 $19.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 1,452.000 $15.000 $9.550 $16.000 $17.000 $20.000 $20.000
FURNISHING AND PLACING TOPSOIL (4")
SY 6,729.000 $5.000 $1.800 $2.000 $4.200 $2.000 $2.000
BLOCK SODDING
SY 584.000 $10.000 $5.500 $5.500 $5.250 $5.500 $7.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 6,111.000 $0.750 $0.220 $0.220 $0.200 $0.220 $0.330
BROADCAST SEED (TEMP) (WARM)
SY 3,056.000 $0.500 $0.100 $0.270 $0.250 $0.250 $0.330
BROADCAST SEED (TEMP) (COOL)
SY 3,056.000 $0.500 $0.280 $0.270 $0.250 $0.250 $0.330
VEGETATIVE WATERING
MG 34.000 $50.000 $30.000 $30.000 $52.000 $22.000 $12.000
CEMENT
TON 66.000 $200.000 $175.000 $190.000 $200.000 $165.000 $200.000
CEMENT TREAT (EXIST MATL)(12")
SY 3,900.000 $10.000 $5.000 $3.500 $12.000 $7.500 $6.000
AGGR (TY PE OR PL GR 4)
CY 122.000 $200.000 $220.000 $190.000 $290.000 $300.000 $250.000
ASPH (AC-15P OR AC-10-2TR)
GAL 4,387.000 $10.000 $4.230 $3.100 $4.010 $4.500 $6.000
PLANE ASPH CONC PAV(0" TO 4")
SY 7,340.000 $5.000 $4.050 $3.850 $6.450 $3.500 $5.000
CEM STABIL BKFL
CY 44.000 $250.000 $210.000 $200.000 $225.000 $200.000 $200.000
RC PIPE (CL IV)(24 IN)
LF 92.000 $100.000 $101.000 $80.000 $103.000 $97.000 $100.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $1,675.000 $1,100.000 $1,300.000 $1,600.000 $1,000.000
MOBILIZATION
LS 1.000 $125,000.000 $87,000.000 $110,000.000 $70,000.000 $130,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $5,000.000 $2,200.000 $2,500.000 $2,600.000 $12,000.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 88.000 $45.000 $38.000 $38.000 $36.000 $36.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 88.000 $10.000 $10.000 $10.000 $9.500 $9.000 $13.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $30.000 $35.500 $33.000 $34.000 $34.000 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $9.000 $10.000 $10.000 $9.500 $9.000 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,564.000 $2.000 $3.100 $3.250 $3.000 $3.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,564.000 $1.000 $0.970 $1.000 $0.900 $0.900 $1.100
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 1,960.000 $50.000 $15.630 $75.000 $70.000 $65.000 $80.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 3,220.000 $10.000 $12.600 $1.000 $9.000 $8.000 $5.000
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 1,960.000 $5.000 $9.420 $10.000 $11.000 $12.000 $7.000
INTERSECTIONS (ACP)
SY 120.000 $100.000 $266.840 $162.000 $145.000 $87.000 $80.000
RUMBLE STRIPS (SHOULDER)
LF 2,183.000 $2.000 $3.300 $1.250 $3.800 $2.500 $3.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 3.000 $1,800.000 $2,100.000 $2,100.000 $2,000.000 $3,300.000 $4,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,250.000 $1,000.000 $1,000.000 $950.000 $3,300.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $9,625.000 $10,000.000 $9,200.000 $13,000.000 $12,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $620.000 $850.000 $850.000 $810.000 $510.000 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $700.000 $855.000 $850.000 $815.000 $560.000 $800.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 7.000 $365.000 $440.000 $440.000 $415.000 $270.000 $500.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $80.000 $82.000 $110.000 $100.000 $150.000
INSTL OM ASSM (OM-2Z)(FLX)SRF
EA 2.000 $105.000 $80.000 $82.000 $80.000 $79.000 $400.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 660.000 $2.000 $1.250 $2.200 $2.100 $1.200 $2.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 3,156.000 $1.000 $1.050 $2.000 $1.600 $1.000 $2.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,156.000 $1.000 $1.050 $2.000 $1.600 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,416.000 $2.000 $1.600 $1.320 $1.050 $1.600 $1.100
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 620.000 $3.000 $1.110 $2.200 $2.100 $1.050 $2.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,136.000 $3.000 $1.100 $1.650 $1.600 $1.050 $1.600
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,998.000 $3.000 $1.120 $2.200 $2.100 $1.050 $2.200
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $220.000 $325.000 $264.000 $210.000 $310.000 $220.000
PREFAB PAV MRK TY C (W) (U-LT ARROW)
EA 2.000 $250.000 $440.000 $495.000 $475.000 $420.000 $500.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $330.000 $335.000 $330.000 $315.000 $320.000 $330.000
REFL PAV MRKR TY II-C-R
EA 100.000 $5.000 $4.500 $5.500 $5.250 $4.300 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 6,972.000 $1.500 $0.600 $0.440 $0.450 $0.600 $0.440
PAV SURF PREP FOR MRK (4")
LF 4,754.000 $0.500 $0.110 $0.110 $0.100 $0.110 $0.110
PAV SURF PREP FOR MRK (8")
LF 1,416.000 $0.500 $0.240 $0.110 $0.100 $0.210 $0.110
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $20.000 $11.000 $82.500 $80.000 $10.500 $100.000
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 2.000 $25.000 $11.000 $110.000 $105.000 $10.500 $110.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $25.000 $11.000 $82.500 $80.000 $10.500 $100.000
SP MIXES SP-B PG64-22
TON 3,158.000 $120.000 $107.250 $110.000 $118.000 $105.000 $115.000
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 395.000 $200.000 $144.540 $130.000 $190.000 $125.000 $130.000
SP MIXES SP-C SAC-A PG76-22
TON 1,207.000 $150.000 $120.950 $120.000 $122.000 $116.000 $120.000
TACK COAT
GAL 1,097.000 $10.000 $4.500 $3.200 $3.300 $6.000 $4.000
TMA (STATIONARY)
DAY 122.000 $150.000 $25.000 $200.000 $150.000 $200.000 $300.000
TMA (MOBILE OPERATION)
DAY 10.000 $50.000 $50.000 $132.000 $105.000 $75.000 $300.000
Totals: $1,353,958.250 $1,067,727.980 $1,172,255.010 $1,327,295.770 $1,372,606.820 $1,400,407.170