MORRIS US 67 (0010-08-060)

Items: 26

County: MORRIS
Length: N/A
Highway: US 67
District: ATLANTA
Control Number: 0010-08-060
DBE Goal: 0.0%
Project: STP 2024(632)HES
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $956,205.50
Date: 05/02/2024 (2 years ago) Changed
Contract Number: N/A
Type: INSTALL ILLUMINATION
Mail/Deliver Bids To: N/A
CHRISTINA TROWLER
KENNETH BURNS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$956,205.50
$948,821.60
Over/Under Est: -0.77% -$7,383.90
Over/Under Est: 6.44% $61,548.50
Amt Left: 7.27% $68,932.40
Over/Under Est: 17.25% $164,900.30
Amt Left: 18.16% $172,284.20
Delta: -10.15% -$103,351.80
$1,174,096.00
Over/Under Est: 22.79% $217,890.50
Amt Left: 23.74% $225,274.40
Delta: -4.73% -$52,990.20
Over/Under Est: 47.44% $453,579.27
Amt Left: 48.58% $460,963.17
Delta: -20.07% -$235,688.77
Subcontractor Percentage Amount
SAFETEX,INC. 6.63% $62,906.87
Total: 6.63% $62,906.87

Bid Items & Bid Tabulations

26 Total 0 of 26
MORRIS  |  US 67  |  ATLANTA  |  0010-08-060  |  05/02/2024  |  $956,205.50  |  STP 2024(632)HES  |  INSTL ILLUM  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
STRIPING TECHNOLOGY, L.P.
WG ENGINEERING & CONSTRUCTION, LLC
YUNEX LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 430.000 $240.000 $325.000 $225.000 $218.000 $281.800 $429.500
RIPRAP (CONC)(CL B)
CY 23.000 $750.000 $700.000 $1,200.000 $842.000 $1,164.800 $1,415.620
MOBILIZATION
LS 1.000 $117,000.000 $100,000.000 $50,000.000 $100,585.000 $115,364.800 $90,562.500
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,200.000 $4,500.000 $6,000.000 $6,228.000 $8,805.900 $5,712.500
IN RD IL (TY SA) 40T-10 (250W EQ) LED
EA 11.000 $4,800.000 $5,000.000 $6,700.000 $4,577.000 $4,696.500 $6,330.000
IN RD IL (TY SA) 50T-10 (400W EQ) LED
EA 32.000 $5,200.000 $5,000.000 $6,800.000 $4,997.000 $5,042.400 $6,865.000
CONDT (PVC) (SCH 40) (2")
LF 4,626.000 $10.500 $12.000 $10.000 $18.000 $17.700 $33.380
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,448.000 $25.000 $17.000 $30.000 $30.850 $25.900 $35.190
ELEC CONDR (NO.6) BARE
LF 8,499.000 $1.900 $2.000 $2.000 $3.000 $2.400 $2.310
ELEC CONDR (NO.6) INSULATED
LF 17,282.000 $2.200 $2.300 $3.000 $3.000 $2.700 $2.940
GROUND BOX TY A (122311)W/APRON
EA 35.000 $1,200.000 $1,200.000 $850.000 $1,180.000 $1,547.100 $1,865.540
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,400.000 $1,200.000 $1,050.000 $1,325.000 $1,905.900 $2,251.880
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
EA 9.000 $6,300.000 $7,500.000 $7,200.000 $7,240.000 $10,770.600 $11,043.750
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 15.000 $965.000 $900.000 $1,500.000 $1,200.000 $1,342.400 $859.690
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $1,100.000 $1,200.000 $1,500.000 $1,300.000 $1,408.300 $892.500
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 19.000 $620.000 $750.000 $700.000 $865.000 $823.600 $557.520
REMOVE SM RD SN SUP&AM
EA 22.000 $250.000 $300.000 $250.000 $500.000 $150.000 $140.620
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 390.000 $18.000 $12.000 $20.000 $58.000 $56.500 $18.620
PREFAB PAV MRK TY C (W) (ARROW)
EA 11.000 $370.000 $290.000 $225.000 $798.000 $882.400 $279.150
PREFAB PAV MRK TY C (W) (WORD)
EA 49.000 $400.000 $410.000 $275.000 $1,185.000 $1,176.500 $304.890
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 26.000 $50.000 $410.000 $100.000 $269.000 $235.300 $41.340
ELIM EXT PAV MRK & MRKS (4")
LF 82.000 $2.000 $6.000 $5.000 $28.000 $29.500 $2.920
REMOVING TRAFFIC SIGNALS
EA 7.000 $4,000.000 $5,000.000 $6,500.000 $5,755.000 $5,000.000 $7,250.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 48.000 $150.000 $200.000 $200.000 $298.000 $106.800 $75.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 640.000 $12.000 $50.000 $20.000 $28.000 $11.800 $125.000
TMA (STATIONARY)
DAY 135.000 $375.000 $1.000 $300.000 $312.000 $239.700 $400.000
Totals: $956,205.500 $948,821.600 $1,017,754.000 $1,121,105.800 $1,174,096.000 $1,409,784.770