Show Job Controls
Bid Cobra

MOORE US0087 (6493-61-001)

Items: 20

County: MOORE
Length: 0.0100 MILES
Highway: US0087
District: AMARILLO
Control Number: 6493-61-001
DBE Goal: 0.0%
Project: RMC - A00218353
Guaranty: $8,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $396,075.00
Date: 11/24/2025 (6 months ago) Changed
Contract Number: 11250401
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218353
Project Description: GUARDRAIL REPAIR DUMAS AE FY 26
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$396,075.00
$376,352.00
Over/Under Est: -4.98% -$19,723.00
$447,509.00
Over/Under Est: 12.99% $51,434.00
Amt Left: 18.91% $71,157.00

Bid Items & Bid Tabulations

20 Total 0 of 20
MOORE  |  US0087  |  AMARILLO  |  6493-61-001  |  11/24/2025  |  $396,075.00  |  RMC - A00218353  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
E.V.G. ENTERPRISE
HJC FARMS, INC.
MOBILIZATION (CALLOUT)
EA 12.000 $2,000.000 $1.000 $500.000
TMA (STATIONARY)
DAY 100.000 $150.000 $10.000 $0.010
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,500.000 $28.000 $27.000 $50.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $25.000 $20.000 $0.010
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 50.000 $25.000 $20.000 $0.010
REPLACE TIMBER POST W/O CONC FND
EA 10.000 $35.000 $1.000 $0.010
REPLACE STEEL POST W/O CONC FND
EA 250.000 $125.000 $190.000 $150.000
REPLACE TIMBER POST W/ CONC FND
EA 5.000 $55.000 $1.000 $0.010
REPLACE STEEL POST W/ CONC FND
EA 20.000 $75.000 $200.000 $200.000
REALIGN POSTS
EA 100.000 $33.000 $1.000 $0.010
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $30.000 $30.000 $0.010
REM OBSOLETE GET & REPL W/ SGT
EA 50.000 $4,000.000 $4,000.000 $4,500.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 100.000 $30.000 $80.000 $0.010
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $50.000 $1.000 $0.010
REPLACE BLOCKOUT
EA 400.000 $25.000 $35.000 $0.010
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $200.000 $1.000 $0.010
RESET SGT IMPACT HEAD
EA 5.000 $200.000 $1,000.000 $0.010
REPLACE SGT OBJECT MARKER
EA 50.000 $30.000 $1.000 $0.010
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $500.000 $1.000 $0.010
REPLACE HINGED TOP SGT POST (STEEL)
EA 5.000 $50.000 $1.000 $0.010
Totals: $396,075.000 $376,352.000 $447,509.000