Show Job Controls
Bid Cobra

MOORE US 287 (0066-04-084)

Items: 52

County: MOORE
Length: 8.9060 MILES
Highway: US 287
District: AMARILLO
Control Number: 0066-04-084
DBE Goal: 0.0%
Project: C 66-4-84
Guaranty: $100,000.00
Time: 132 WORKING DAYS
Engineer's Estimate: $5,971,612.75
Date: 01/08/2025 (1 year ago)
Contract Number: 1253213
Type: HIGHWAY IMPROVEMENT
Project ID: A00207320
Project Description: INSTALL CABLE BARRIER; IMPROVE INTERSECTIONS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$5,971,612.75
$5,565,020.45
Over/Under Est: -6.81% -$406,592.30
Over/Under Est: 2.23% $133,254.00
Amt Left: 9.7% $539,846.30
Over/Under Est: 7.7% $459,826.00
Amt Left: 15.57% $866,418.30
Delta: -5.35% -$326,572.00
$8,746,595.30
Over/Under Est: 46.47% $2,774,982.55
Amt Left: 57.17% $3,181,574.85
Delta: -36.00% -$2,315,156.55
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 28.74% $1,599,386.88
TRP CONSTRUCTION GROUP, LLC 12.04% $670,028.46
J. LEE MILLIGAN, INC. 7.16% $398,455.46
WOLFE CONSTRUCTION GROUP, INCORPORATED 1.14% $63,441.23
FC TRAFFIC CONTROL, INC. 0.28% $15,582.06
Total: 49.36% $2,746,894.09

Bid Items & Bid Tabulations

52 Total 0 of 52
MOORE  |  US 287  |  AMARILLO  |  0066-04-084  |  01/08/2025  |  $5,971,612.75  |  C 66-4-84  |  HWY IMPRV  |  132 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HJC FARMS, INC.
L A FULLER & SONS CONSTRUCTION, LTD.
O. TREVINO CONSTRUCTION, LLC
GILVIN-TERRILL, LTD.
REMOV CONC (PAV)
SY 3,012.000 $40.000 $33.300 $47.550 $47.000 $50.000
REMOV CONC (MOWSTRIP)
SY 18,402.000 $22.000 $15.000 $9.200 $22.000 $30.000
RMV (16") TRT/UNTRT BASE & ASPH PAV
SY 651.000 $35.000 $25.500 $16.350 $35.000 $50.000
SUBGR WIDEN (DC)
STA 50.790 $1,600.000 $2,665.000 $3,231.600 $1,500.000 $5,000.000
EMBANK (FNL)(DC)(TY B)
CY 743.000 $40.000 $72.150 $81.200 $43.000 $75.000
BLADING
HR 412.000 $100.000 $90.000 $177.950 $170.000 $160.000
DRILL SEED (PERM_RURAL_CLAY)
AC 58.250 $700.000 $550.000 $715.000 $675.000 $600.000
DRILL SEED (TEMP_WARM_COOL)
AC 58.250 $325.000 $405.000 $605.000 $500.000 $400.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 70,483.000 $4.100 $5.650 $3.700 $5.000 $7.000
CONC PVMT (CRCP) (13")
SY 7,301.000 $185.000 $180.000 $170.650 $145.000 $190.000
RIPRAP (MOW STRIP)(4 IN)
CY 2,107.000 $450.000 $500.000 $561.750 $550.000 $800.000
REMOV STR (SET)
EA 4.000 $800.000 $388.500 $1,282.650 $500.000 $2,500.000
REMOV STR (PIPE)
LF 98.000 $50.000 $22.250 $118.550 $54.000 $90.000
MOBILIZATION
LS 1.000 $700,000.000 $305,000.000 $612,567.100 $625,000.000 $865,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $16,000.000 $1,565.000 $11,500.000 $23,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $11,000.000 $39,684.750 $15,000.000 $18,500.000
TMA (STATIONARY)
DAY 130.000 $100.000 $225.000 $470.700 $250.000 $865.000
TMA (MOBILE OPERATION)
HR 40.000 $150.000 $70.000 $168.750 $100.000 $95.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 2,675.000 $5.000 $2.750 $5.500 $10.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,675.000 $2.000 $0.900 $1.100 $2.000 $1.000
FILL MILLED CONCR RUMBLE STRIPS (SHLDR)
LF 550.000 $20.000 $30.000 $47.300 $23.500 $50.000
MTL W-BEAM GD FEN (STEEL POST)
LF 2,650.000 $37.000 $30.000 $34.100 $37.000 $32.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $2,850.000 $2,625.000 $2,420.000 $2,700.000 $2,750.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $2,000.000 $1,370.000 $1,650.000 $1,800.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 2,689.000 $5.000 $1.000 $3.300 $3.600 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $315.000 $150.000 $330.000 $375.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $350.000 $150.000 $330.000 $360.000 $200.000
CABLE BARRIER SYSTEM (INSTALL)(TL-4)
LF 40,792.000 $12.250 $11.500 $11.850 $15.000 $30.000
CABLE BARRIER TERM SEC (INSTL)(TL-4)
EA 44.000 $3,000.000 $3,000.000 $3,272.500 $5,000.000 $5,000.000
CABLE BARRIER (REMOVE)
LF 31,040.000 $3.000 $1.000 $2.450 $3.000 $10.000
CABLE BARRIER TERMINAL SECTION (REMOVE)
EA 34.000 $750.000 $1,000.000 $1,189.900 $2,650.000 $5,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,645.000 $2,950.000 $3,575.000 $3,900.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $319.000 $100.000 $330.000 $375.000 $200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 85.000 $1,070.000 $795.000 $962.500 $1,000.000 $875.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,410.000 $1,350.000 $1,089.000 $1,150.000 $990.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 60.000 $1,350.000 $1,560.000 $1,089.000 $1,150.000 $990.000
REMOVE SM RD SN SUP&AM
EA 145.000 $115.000 $50.000 $110.000 $125.000 $100.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 27.000 $35.000 $45.000 $57.200 $65.000 $52.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 34.000 $150.000 $120.000 $86.900 $95.000 $79.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $30.000 $10.000 $22.000 $25.000 $20.000
RE PM TY III (W)(6")(SLD)
LF 92,440.000 $0.850 $1.000 $0.990 $0.800 $0.900
RE PM TY III (W)(8")(SLD)
LF 7,800.000 $1.100 $1.700 $1.650 $1.600 $1.500
RE PM TY III (W)(8")(DOT)
LF 240.000 $2.000 $2.250 $2.200 $3.500 $2.000
RE PM TY III (Y)(6")(SLD)
LF 90,940.000 $0.850 $1.000 $0.990 $0.800 $0.900
PREFAB PM TY C (W)(24")(SLD)
LF 492.000 $17.000 $17.750 $17.600 $16.000 $16.000
PREFAB PM TY C (W)(ARROW)
EA 32.000 $280.000 $261.000 $258.500 $285.000 $235.000
PREFAB PM TY C (W)(WORD)
EA 32.000 $300.000 $372.000 $368.500 $393.000 $335.000
PREFAB PM TY C (W)(36")(YLD TRI)
EA 228.000 $80.000 $66.750 $66.000 $90.000 $60.000
ELIM EXT PM & MRKS (6")
LF 206,120.000 $0.450 $0.850 $0.830 $0.600 $0.750
PAV SURF PREP FOR MRK (6")
LF 8,684.000 $0.200 $0.250 $0.220 $0.250 $0.200
PAV SURF PREP FOR MRK (8")
LF 4,262.000 $0.200 $0.300 $0.280 $0.400 $0.250
PREFB PV MK W/WNTY TY B(W)6"(BRK)CNTST
LF 22,740.000 $12.500 $14.500 $14.300 $18.420 $13.000
Totals: $5,971,612.750 $5,565,020.450 $6,104,866.754 $6,431,438.750 $8,746,595.300