MOORE US 287 (0066-04-081)

Items: 70

County: MOORE
Length: 0.2750 MILES
Highway: US 287
District: AMARILLO
Control Number: 0066-04-081
DBE Goal: 6.5%
Project: BR 2025(617)
Guaranty: $84,000.00
Time: 161 WORKING DAYS
Engineer's Estimate: $4,198,524.50
Date: 04/04/2025 (1 year ago)
Contract Number: 4253216
Type: BRIDGE MAINTENANCE
Project ID: A00197805
Contract Type: Federal
Project Description: REMOVE ACP, HYDRODEMO 1", CONCRETE OVERLAY,INSTALL HEADER JOINT, REMOVE AND REPLACE BRIDGE RAIL, SUBSTRUCTURE SPALL REPAIR, RELOCATE BACKWALLS, REMOVE AND REPLACE APPROACH SLABS, EROSION MITIGATION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,198,524.50
$3,547,551.90
Over/Under Est: -15.5% -$650,972.60
Over/Under Est: -13.11% -$550,432.10
Amt Left: 2.83% $100,540.50
$4,037,046.00
Over/Under Est: -3.85% -$161,478.50
Amt Left: 13.8% $489,494.10
Delta: -10.66% -$388,953.60
Over/Under Est: 6.75% $283,297.80
Amt Left: 26.34% $934,270.40
Delta: -11.02% -$444,776.30
Over/Under Est: 32.25% $1,354,166.52
Amt Left: 56.52% $2,005,139.12
Delta: -23.89% -$1,070,868.72
Subcontractor Percentage Amount
ONE WAY CONCRETE CONSTRUCTION, LLC 34.88% $1,328,271.28
HYDRO TECHNOLOGIES, INC. 5.25% $199,926.15
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 5.16% $196,498.85
TRP CONSTRUCTION GROUP, LLC 3.14% $119,574.88
TRUMBLE CRANE & RIGGING 1.48% $56,360.13
DUSTROL, INC. 1.28% $48,743.90
TEXOP CONSTRUCTION 1.14% $43,412.54
BARRICADES UNLIMITED 0.48% $18,278.96
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.29% $11,043.54
Total: 53.10% $2,022,110.23

Bid Items & Bid Tabulations

70 Total 0 of 70
MOORE  |  US 287  |  AMARILLO  |  0066-04-081  |  04/04/2025  |  $4,198,524.50  |  BR 2025(617)  |  BRIDGE MAINT  |  161 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
ICOS MANAGEMENT, LLC
GIBSON & ASSOCIATES, INC.
RAGLE CONSTRUCTION, INC.
REMOV CONC (RIPRAP)
SY 55.000 $80.000 $41.300 $25.000 $165.000 $150.000 $100.000
REMOV CONC (ABUTMENT BACKWALL)
CY 28.000 $1,650.000 $531.000 $50.000 $66.000 $3,000.000 $500.000
EXCAV (CHANNEL)
CY 60.000 $75.000 $147.500 $100.000 $66.000 $50.000 $150.000
EMBANK (FNL)(OC)(TY B)
CY 564.000 $75.000 $29.500 $25.000 $55.000 $50.000 $257.000
DRILL SEED (PERM_RURAL_CLAY)
SY 4,310.000 $0.600 $4.720 $1.550 $1.000 $4.840 $0.660
PLANE ASPH CONC PAV(0" TO 3")
SY 6,118.000 $10.000 $8.260 $17.000 $38.000 $13.750 $25.000
FULL - DEPTH REPAIR CRCP (13")
CY 14.000 $400.000 $1,416.000 $1,000.000 $2,160.000 $1,500.000 $2,000.000
STRUCT EXCAV (BRIDGE)
CY 226.000 $75.000 $147.500 $20.000 $86.000 $180.000 $56.000
CEM STABIL BKFL
CY 226.000 $400.000 $484.960 $300.000 $302.000 $360.000 $186.000
FLOWABLE BACKFILL
CY 19.000 $650.000 $472.000 $300.000 $302.000 $715.000 $431.000
TEMPORARY SPL SHORING
SF 960.000 $45.000 $41.300 $65.000 $10.000 $1.200 $71.000
CL C CONC (ABUT)
CY 48.000 $2,250.000 $1,178.820 $700.000 $1,760.000 $3,900.000 $1,700.000
APPROACH SLAB
CY 60.000 $1,300.000 $1,003.000 $700.000 $1,100.000 $1,560.000 $950.000
EPOXY WATERPROOF FINISH (TY X)
SF 10,229.000 $13.500 $17.700 $10.000 $8.000 $7.700 $7.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 1,652.000 $100.000 $171.100 $320.000 $121.000 $25.000 $25.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 551.000 $180.000 $194.700 $300.000 $132.000 $50.000 $92.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 408.000 $195.000 $208.860 $230.000 $165.000 $220.000 $150.000
RIPRAP (CONC)(4 IN)
CY 258.000 $725.000 $531.000 $550.000 $540.000 $588.630 $750.000
RIPRAP (CONC)(5 IN)
CY 48.000 $700.000 $767.000 $600.000 $756.000 $664.490 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $725.000 $885.000 $500.000 $756.000 $595.540 $675.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 6.000 $500.000 $1,180.000 $250.000 $432.000 $750.000 $650.000
CLEANING AND SEALING JOINTS (FOAM)
LF 251.000 $80.000 $413.000 $100.000 $55.000 $154.000 $88.000
CONCRETE OVERLAY (2.5 IN)
SY 6,118.000 $128.000 $56.250 $45.000 $86.000 $88.000 $100.000
RETROFIT RAIL (TY SSTR)
LF 896.000 $235.000 $149.860 $190.000 $716.000 $206.800 $211.000
WATERPROOFING (TY 10)
SY 72.000 $16.000 $206.500 $95.000 $432.000 $120.000 $60.000
HYDRO-DEMOLITION (1 IN)
SY 6,118.000 $77.000 $17.700 $70.000 $46.000 $105.610 $62.000
REMOV STR (APPROACH SLAB)
EA 2.000 $4,905.000 $8,260.000 $1,000.000 $21,600.000 $21,000.000 $5,720.000
MOBILIZATION
LS 1.000 $350,000.000 $322,000.000 $250,000.000 $80,000.000 $642,758.000 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $20,000.000 $11,800.000 $3,500.000 $1.000 $15,000.000 $189,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,750.000 $8,260.000 $5,000.000 $11,000.000 $21,000.000 $25,000.000
TMA (STATIONARY)
DAY 60.000 $345.000 $182.900 $325.000 $275.000 $350.000 $550.000
TMA (MOBILE OPERATION)
HR 72.000 $100.000 $295.000 $325.000 $220.000 $50.000 $87.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,960.000 $7.000 $14.160 $10.000 $5.000 $12.490 $6.750
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,960.000 $2.750 $2.360 $3.000 $1.000 $10.450 $1.500
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 4.000 $9,000.000 $17,700.000 $7,500.000 $10,800.000 $4,750.000 $5,000.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,080.000 $28.000 $53.100 $120.000 $55.000 $41.000 $15.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,280.000 $14.000 $41.300 $35.000 $44.000 $19.000 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,080.000 $28.000 $53.100 $35.000 $44.000 $36.500 $15.000
PORT CTB (CONNECTION HARDWARE)
EA 74.000 $55.000 $118.000 $150.000 $220.000 $25.000 $198.630
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 840.000 $150.000 $90.860 $135.000 $324.000 $160.600 $125.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $40.000 $118.000 $33.000 $44.000 $36.030 $32.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $8,850.000 $3,000.000 $4,320.000 $2,486.000 $2,260.000
REMOVE METAL BEAM GUARD FENCE
LF 800.000 $8.000 $17.700 $5.000 $5.000 $3.300 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $500.000 $5,900.000 $250.000 $550.000 $242.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $650.000 $9,440.000 $250.000 $550.000 $280.500 $255.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $5,000.000 $8,260.000 $4,000.000 $4,950.000 $3,410.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $750.000 $1,770.000 $300.000 $550.000 $368.500 $335.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 4.000 $3,000.000 $5,900.000 $2,000.000 $5,500.000 $2,145.000 $1,950.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,090.000 $5,900.000 $1,500.000 $5,500.000 $1,100.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $39,900.000 $32,000.000 $38,500.000 $33,715.000 $30,650.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $14,160.000 $12,000.000 $13,200.000 $9,460.000 $8,600.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 10.000 $60.000 $64.900 $30.000 $55.000 $45.650 $41.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $64.900 $35.000 $55.000 $47.850 $43.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,265.000 $2.000 $2.300 $2.500 $2.000 $2.200 $2.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 11,760.000 $2.000 $1.440 $1.750 $2.000 $1.380 $1.250
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 24.000 $6.000 $24.150 $25.000 $33.000 $23.100 $21.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 13,480.000 $2.000 $1.440 $1.750 $2.000 $1.380 $1.250
TY I HIGH PERF PM (W)6"(BRK)(090MIL)
LF 1,120.000 $1.000 $2.880 $3.000 $3.000 $2.750 $2.500
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 5,184.000 $0.800 $2.880 $3.000 $3.000 $2.750 $2.500
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 170.000 $1.000 $2.880 $3.000 $3.000 $2.750 $2.500
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 5,454.000 $0.800 $2.880 $3.000 $3.000 $2.750 $2.500
PAVEMENT SLER 6"
LF 11,928.000 $0.250 $1.500 $1.800 $2.000 $1.490 $1.350
REFL PAV MRKR TY II-A-A
EA 68.000 $7.500 $11.500 $20.000 $17.000 $11.000 $10.000
REFL PAV MRKR TY II-C-R
EA 58.000 $7.500 $11.500 $20.000 $17.000 $11.000 $10.000
ELIM EXT PM & MRKS (4")
LF 5,720.000 $0.900 $4.600 $5.000 $5.000 $4.400 $4.000
PAV SURF PREP FOR MRK (6")
LF 11,928.000 $0.200 $1.440 $1.750 $2.000 $1.380 $1.250
CRACK CLEANING AND SEALING (JCP)
LF 620.000 $20.000 $22.000 $25.000 $86.000 $44.000 $22.000
CONCRETE RAIL REPLACEMENT (IN-KIND)
LF 32.000 $550.000 $220.000 $250.000 $864.000 $700.000 $600.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 270.000 $900.000 $357.500 $500.000 $385.000 $1,300.000 $540.000
CARBON FIBER REINF POLYMER PROTECTION
SF 318.000 $135.000 $60.500 $125.000 $86.000 $77.000 $115.000
Totals: $4,198,524.500 $3,547,551.900 $3,648,092.400 $4,037,046.000 $4,481,822.300 $5,552,691.020
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $115,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,000.00
Total: $129,000.00