Show Job Controls
Bid Cobra

MONTGOMERY IH0045 (6480-91-001)

Items: 54

County: MONTGOMERY
Length: 0.0100 MILES
Highway: IH0045
District: HOUSTON
Control Number: 6480-91-001
DBE Goal: 0.0%
Project: RMC - A00214298
Guaranty: $26,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $656,645.46
Date: 02/10/2026 (4 months ago) Changed
Contract Number: 2261201
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00214298
Project Description: GUARDRAIL REPAIR ON VARIOUS HIGHWAYS THROUGHOUT MONTGOMERY COUNTY.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7600 WASHINGTON AVE, HOUSTON, TX 77007
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$656,645.46
$444,263.00
Over/Under Est: -32.34% -$212,382.46
$503,372.00
Over/Under Est: -23.34% -$153,273.46
Amt Left: 13.3% $59,109.00
Over/Under Est: -17.34% -$113,870.46
Amt Left: 22.17% $98,512.00
Delta: -7.83% -$39,403.00
Over/Under Est: -17.34% -$113,847.46
Amt Left: 22.18% $98,535.00
Delta: 0.00% -$23.00
Over/Under Est: -10.63% -$69,779.46
Amt Left: 32.1% $142,603.00
Delta: -8.12% -$44,068.00
Over/Under Est: 3.78% $24,828.54
Amt Left: 53.39% $237,211.00
Delta: -16.12% -$94,608.00

Bid Items & Bid Tabulations

54 Total 0 of 54
MONTGOMERY  |  IH0045  |  HOUSTON  |  6480-91-001  |  02/10/2026  |  $656,645.46  |  RMC - A00214298  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
HAZMAT INTERNATIONAL, INC.
ABOVE ALL CONTRACTING LLC
ISI CONTRACTING, INC.
REMOV CONC (MOWSTRIP)
LF 125.000 $11.000 $20.000 $5.000 $10.000 $18.500 $20.000 $48.000
BACKFILL (TY A)
STA 25.000 $191.650 $30.000 $100.000 $100.000 $5.000 $25.000 $1,510.000
RIPRAP (MOW STRIP)(4 IN)
CY 3.000 $645.000 $1,100.000 $900.000 $1,500.000 $600.000 $600.000 $900.000
MOBILIZATION (CALLOUT)
EA 36.000 $1,200.000 $1.000 $1.000 $500.000 $100.000 $1.000 $250.000
MOBILIZATION (EMERGENCY)
EA 3.000 $950.000 $1.000 $1.000 $500.000 $250.000 $500.000 $1,000.000
TMA (STATIONARY)
DAY 80.000 $200.290 $1.000 $1.000 $400.000 $250.000 $1.000 $250.000
TMA (MOBILE OPERATION)
DAY 75.000 $157.690 $1.000 $1.000 $10.000 $250.000 $1.000 $150.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,125.000 $23.780 $28.000 $35.000 $36.000 $22.500 $35.000 $26.000
MTL W-BEAM GD FEN (STEEL POST)
LF 150.000 $32.690 $10.000 $10.000 $40.000 $50.000 $50.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,417.380 $2,400.000 $2,000.000 $2,500.000 $2,000.000 $2,000.000 $1,734.000
SHORT RADIUS (28")
LF 250.000 $31.530 $50.000 $50.000 $35.000 $75.000 $50.000 $34.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,440.000 $1,250.000 $1,500.000 $1,400.000 $2,500.000 $1,300.000 $1,952.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 5.000 $357.350 $600.000 $1.000 $250.000 $10.000 $800.000 $408.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $136.690 $1.000 $1.000 $100.000 $1.000 $200.000 $379.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $247.990 $1.000 $1.000 $100.000 $1.000 $200.000 $379.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,198.040 $3,500.000 $3,500.000 $3,200.000 $6,000.000 $4,000.000 $3,163.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $845.000 $500.000 $1,000.000 $300.000 $500.000 $500.000 $737.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $266.910 $7.000 $1.000 $1,200.000 $1.000 $500.000 $627.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 3,000.000 $5.000 $1.000 $5.000 $3.000 $3.500 $5.000 $9.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4,000.000 $25.000 $1.000 $5.000 $5.000 $5.000 $20.000 $12.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 4,000.000 $5.000 $1.000 $5.000 $3.000 $4.000 $5.000 $9.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 250.000 $25.000 $10.000 $5.000 $5.000 $5.000 $20.000 $13.000
REPLC DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 3,000.000 $5.000 $1.000 $5.000 $5.000 $3.500 $5.000 $8.000
REPLC DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 1,500.000 $5.000 $1.000 $5.000 $15.000 $5.000 $20.000 $13.000
REPLC DEL ASSM (D-SY)SZ 1(BRF)CTB(BI)
EA 1,500.000 $5.000 $1.000 $5.000 $5.000 $4.000 $5.000 $8.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,500.000 $20.200 $1.000 $18.000 $20.000 $32.500 $25.000 $22.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $67.340 $5.000 $25.000 $25.000 $25.000 $60.000 $36.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 25.000 $93.270 $5.000 $300.000 $50.000 $250.000 $500.000 $953.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 5.000 $80.600 $1.000 $1.000 $10.000 $1,000.000 $100.000 $773.000
REPLACE SHORT RADIUS SYS (TL-3)
EA 5.000 $20,000.000 $1.000 $1.000 $10.000 $1,000.000 $100.000 $773.000
REPLACE TIMBER POST W/O CONC FND
EA 50.000 $60.830 $450.000 $50.000 $50.000 $50.000 $30.000 $107.000
REPLACE STEEL POST W/O CONC FND
EA 25.000 $102.780 $1.000 $1.000 $50.000 $50.000 $50.000 $144.000
REPLACE TIMBER POST W/ CONC FND
EA 25.000 $61.150 $600.000 $50.000 $150.000 $50.000 $100.000 $145.000
REPLACE STEEL POST W/ CONC FND
EA 25.000 $123.570 $1.000 $100.000 $50.000 $30.000 $100.000 $165.000
REALIGN POSTS
EA 5.000 $7.970 $500.000 $25.000 $125.000 $100.000 $100.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 30.000 $2,751.120 $3,900.000 $3,700.000 $4,000.000 $3,000.000 $3,800.000 $3,250.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 35.000 $1,113.410 $1,900.000 $1,100.000 $1,050.000 $750.000 $600.000 $1,261.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $19.330 $30.000 $50.000 $35.000 $75.000 $30.000 $36.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 250.000 $66.370 $1.000 $65.000 $80.000 $30.000 $100.000 $53.000
REPLACE BLOCKOUT
EA 100.000 $9.790 $400.000 $50.000 $20.000 $50.000 $50.000 $26.000
RESET SGT IMPACT HEAD
EA 5.000 $69.040 $2,500.000 $750.000 $650.000 $100.000 $250.000 $330.000
REPLACE SGT OBJECT MARKER
EA 35.000 $43.170 $1.000 $30.000 $30.000 $25.000 $30.000 $35.000
REPLACE SGT CABLE ANCHOR
EA 15.000 $59.170 $400.000 $150.000 $500.000 $50.000 $100.000 $50.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $67.430 $500.000 $150.000 $500.000 $50.000 $100.000 $156.000
REPLACE SGT STRUT
EA 15.000 $130.370 $1.000 $200.000 $80.000 $50.000 $100.000 $109.000
RAISE RAIL
LF 75.000 $2.730 $10.000 $25.000 $25.000 $10.000 $25.000 $10.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 300.000 $20.920 $1.000 $35.000 $15.000 $2.500 $50.000 $75.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 75.000 $78.050 $130.000 $185.000 $150.000 $300.000 $200.000 $44.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $169.780 $1.000 $1.000 $100.000 $10.000 $300.000 $380.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $146.910 $1.000 $1.000 $100.000 $1.000 $50.000 $1,249.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 3.000 $1,785.130 $1,000.000 $1,500.000 $1,250.000 $1,000.000 $2,500.000 $3,650.000
REPLACE CABLE (TL-4)
LF 250.000 $1.860 $1.000 $1.000 $1.500 $2.500 $10.000 $6.000
CHECK / RE-TENSION CABLE (TL-4)
EA 15.000 $125.380 $1.000 $400.000 $250.000 $1.000 $150.000 $4.000
REPLACE POST HARDWARE (TL-4)
EA 25.000 $3.470 $200.000 $100.000 $100.000 $1.000 $50.000 $100.000
Totals: $656,645.460 $444,263.000 $503,372.000 $542,775.000 $542,798.000 $586,866.000 $681,474.000