Show Job Controls
Bid Cobra

MONTGOMERY IH0045 (6450-29-001)

Items: 46

County: MONTGOMERY
Length: N/A
Highway: IH0045
District: HOUSTON
Control Number: 6450-29-001
DBE Goal: 0.0%
Project: RMC - 645029001
Guaranty: N/A
Time: 731 CALENDAR DAYS
Engineer's Estimate: $1,537,888.48
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: CONCRETE STRUCTURE REPAIR
Mail/Deliver Bids To: N/A
BRANDI EVANS
LYNN CHAMPAGNE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$1,537,888.48
$1,473,711.00
Over/Under Est: -4.17% -$64,177.48
$1,550,454.60
Over/Under Est: 0.82% $12,566.12
Amt Left: 5.21% $76,743.60
Over/Under Est: 6.82% $104,879.52
Amt Left: 11.47% $169,057.00
Delta: -5.95% -$92,313.40
Over/Under Est: 18.12% $278,729.62
Amt Left: 23.27% $342,907.10
Delta: -10.58% -$173,850.10
$2,043,126.50
Over/Under Est: 32.85% $505,238.02
Amt Left: 38.64% $569,415.50
Delta: -12.47% -$226,508.40
Subcontractor Percentage Amount
AMERICAN INFRASTRUCTURE MAINTENANCE MANAGEMENT LLC 0.00% $0.00
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
SUPERIOR GROUTING SERVICES, INC. 0.00% $0.00
TOP STAR CONSTRUCTION, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

46 Total 0 of 46
MONTGOMERY  |  IH0045  |  HOUSTON  |  6450-29-001  |  05/03/2024  |  $1,537,888.48  |  RMC - 645029001  |  CONC STRUCT REPAIR  |  731 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MBN ENTERPRISES LLC
ISI CONTRACTING, INC.
GARRET SHIELDS INFRASTRUCTURE
STRUCTURAL INTEGRITY GROUP LLC
MC2 CIVIL, LLC
REMOVING CONC (CURB OR CURB & GUTTER)
LF 500.000 $65.000 $15.000 $12.000 $10.000 $30.000 $10.000
EXCAVATION (ROADWAY)
CY 880.000 $33.000 $18.000 $30.000 $50.000 $60.000 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 115.000 $38.000 $25.000 $50.000 $100.000 $70.000 $20.000
BLOCK SODDING
SY 360.000 $8.600 $15.000 $12.000 $10.000 $10.000 $10.000
FERTILIZER
AC 0.070 $836.150 $5,000.000 $2,200.000 $2,000.000 $20,000.000 $10,000.000
VEGETATIVE WATERING
MG 8.400 $218.000 $50.000 $45.000 $200.000 $250.000 $500.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 140.000 $500.000 $265.000 $345.000 $400.000 $375.000 $650.000
FULL - DEPTH REPAIR CRCP (15")
SY 300.000 $427.500 $230.000 $500.000 $600.000 $540.000 $750.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 800.000 $352.500 $410.000 $465.000 $600.000 $470.000 $740.000
FULL-DEPTH REPAIR CRCP (18")
SY 300.000 $500.000 $300.000 $550.000 $400.000 $550.000 $790.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 300.000 $160.000 $300.000 $250.000 $250.000 $170.000 $250.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 200.000 $280.000 $350.000 $125.000 $150.000 $215.000 $150.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 5.000 $5,350.000 $1,500.000 $450.000 $500.000 $4,000.000 $5.000
RIPRAP (CONC)(6 IN)
CY 10.000 $1,285.000 $750.000 $1,350.000 $600.000 $1,200.000 $1,700.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 400.000 $200.000 $300.000 $185.000 $150.000 $500.000 $175.000
GRATE & FRAME
EA 1.000 $3,800.000 $15,000.000 $1,500.000 $500.000 $3,000.000 $500.000
FRAME & COVER
EA 1.000 $3,000.000 $10,000.000 $1,500.000 $500.000 $6,500.000 $500.000
RING & COVER
EA 1.000 $3,000.000 $4,000.000 $250.000 $500.000 $1,500.000 $500.000
MOBILIZATION (CALLOUT)
EA 24.000 $1,000.000 $2,500.000 $500.000 $1,000.000 $1,000.000 $250.000
MOBILIZATION (EMERGENCY)
EA 6.000 $1,500.000 $2,500.000 $1,000.000 $1,000.000 $1,500.000 $1,500.000
MOBILIZATION-SITE 1
EA 1.000 $12,500.000 $5,000.000 $5,000.000 $5,000.000 $25,000.000 $16,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 230.000 $5.600 $6.000 $4.500 $4.000 $3.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 230.000 $2.000 $5.000 $1.000 $1.000 $1.000 $5.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 120.000 $70.000 $180.000 $55.000 $100.000 $80.000 $130.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 120.000 $20.000 $50.000 $12.000 $50.000 $30.000 $75.000
PERM CTB (F-SHAPE) (TY 1)
LF 120.000 $115.000 $185.000 $80.000 $100.000 $175.000 $350.000
CONC CURB (TY I)
LF 100.000 $39.000 $15.000 $10.500 $40.000 $25.000 $50.000
CONC CURB (TY II)
LF 90.000 $43.000 $20.000 $10.500 $60.000 $40.000 $50.000
CONC CURB & GUTTER (TY II)
LF 2,000.000 $66.000 $25.000 $36.000 $40.000 $50.000 $60.000
CONC CURB (DOWEL)(SLOTTED)
LF 100.000 $30.000 $22.000 $55.000 $50.000 $150.000 $50.000
CONC CURB (DOWEL)
LF 200.000 $29.000 $15.000 $35.000 $50.000 $30.000 $50.000
CONC CURB (SLOTTED)
LF 400.000 $30.000 $20.000 $53.000 $50.000 $140.000 $50.000
CONC CURB (TY F1)
LF 100.000 $125.000 $22.000 $65.000 $50.000 $130.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 2.000 $700.000 $1,100.000 $765.000 $1,000.000 $2,500.000 $1,500.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 211.000 $2.250 $4.000 $1.600 $18.000 $8.700 $7.000
PAVEMENT SEALER 6"
LF 720.000 $1.750 $1.000 $0.850 $12.000 $0.650 $0.500
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 360.000 $1.750 $6.000 $1.250 $18.000 $11.750 $9.500
REFL PAV MRK TY II (Y)(CURB)
LF 149.000 $4.500 $3.000 $1.550 $30.000 $5.600 $4.500
PREFAB PAV MRK TY C (W) (ARROW)
EA 2.000 $325.000 $750.000 $260.000 $1,000.000 $1,400.000 $1,100.000
REFL PAV MRKR TY I-C
EA 11.000 $6.500 $15.000 $5.750 $10.000 $25.000 $20.000
REFL PAV MRKR TY II-A-A
EA 52.000 $6.500 $15.000 $8.400 $10.000 $25.000 $20.000
PAV SURF PREP FOR MRK (6")
LF 720.000 $1.500 $0.500 $0.400 $1.500 $0.250 $0.200
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $50.000 $10.000 $42.000 $100.000 $12.500 $10.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 40,000.000 $7.000 $8.500 $6.150 $7.000 $7.250 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $175.000 $300.000 $250.000 $100.000 $2,000.000 $250.000
TMA (STATIONARY)
DAY 200.000 $350.000 $200.000 $850.000 $300.000 $125.000 $250.000
Totals: $1,537,888.480 $1,473,711.000 $1,550,454.600 $1,642,768.000 $1,816,618.100 $2,043,126.500