MONTGOMERY IH0045 (6433-46-001)

Items: 48

County: MONTGOMERY
Length: N/A
Highway: IH0045
District: HOUSTON
Control Number: 6433-46-001
DBE Goal: N/A
Project: RMC - 643346001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $584,226.00
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
MATTHEW CONNELLY
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$584,226.00
$555,451.00
Over/Under Est: -4.93% -$28,775.00
Over/Under Est: 4.03% $23,524.00
Amt Left: 9.42% $52,299.00
$615,366.00
Over/Under Est: 5.33% $31,140.00
Amt Left: 10.79% $59,915.00
Delta: -1.25% -$7,616.00
Over/Under Est: 9.71% $56,705.00
Amt Left: 15.39% $85,480.00
Delta: -4.15% -$25,565.00

Bid Items & Bid Tabulations

48 Total 0 of 48
MONTGOMERY  |  IH0045  |  HOUSTON  |  6433-46-001  |  05/04/2023  |  $584,226.00  |  RMC - 643346001  |  METAL BEAM GUARD FENCE REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ABOVE ALL CONSTRUCTION
ISI CONTRACTING, INC.
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
REMOVING CONCRETE(MOW STRIP)
LF 25.000 $8.000 $10.000 $10.000 $8.000 $100.000
BACKFILL TY A
CY 10.000 $25.000 $20.000 $10.000 $25.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $400.000 $400.000 $400.000 $400.000 $520.000
MOBILIZATION (CALLOUT)
EA 26.000 $500.000 $1.000 $400.000 $1.000 $100.000
MOBILIZATION (EMERGENCY)
EA 6.000 $600.000 $500.000 $300.000 $300.000 $500.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,600.000 $2,000.000 $1,600.000 $1,600.000 $5,000.000
SHORT RADIUS
LF 300.000 $60.000 $35.000 $65.000 $60.000 $32.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $3,000.000 $1,500.000 $1,200.000 $2,000.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 25.000 $25.000 $50.000 $25.000 $25.000 $25.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $500.000 $200.000 $200.000 $500.000 $500.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $200.000 $500.000 $200.000 $200.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,900.000 $4,000.000 $3,500.000 $3,250.000 $3,100.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $200.000 $1,000.000 $200.000 $200.000 $300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $200.000 $500.000 $200.000 $200.000 $1,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1.000 $2,000.000 $500.000 $45.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,500.000 $2,000.000 $1,500.000 $500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $2,000.000 $15,000.000 $23,000.000 $2,000.000 $28,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 750.000 $15.000 $1.000 $25.000 $15.000 $30.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 250.000 $21.000 $25.000 $25.000 $21.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 5,000.000 $17.000 $18.000 $17.000 $20.000 $14.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $22.000 $50.000 $25.000 $22.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 10.000 $30.000 $100.000 $20.000 $30.000 $50.000
RAISE RAIL ELEMENT
LF 350.000 $13.000 $10.000 $15.000 $5.000 $12.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 150.000 $45.000 $40.000 $100.000 $45.000 $45.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 400.000 $50.000 $50.000 $100.000 $60.000 $80.000
REALIGN POSTS
EA 65.000 $20.000 $30.000 $25.000 $8.000 $8.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,000.000 $25.000 $25.000 $18.000 $30.000 $27.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $50.000 $80.000 $40.000 $100.000 $50.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $3,225.000 $3,000.000 $3,500.000 $3,225.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 50.000 $1,150.000 $1,000.000 $1,000.000 $1,500.000 $2,140.000
REM & RESET SGT IMPACT HEAD
EA 25.000 $100.000 $50.000 $100.000 $100.000 $150.000
REPLACE SGT CABLE ASSEMBLY
EA 50.000 $95.000 $100.000 $100.000 $90.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 50.000 $60.000 $100.000 $100.000 $90.000 $100.000
REPLACE SGT STRUT
EA 25.000 $60.000 $100.000 $100.000 $60.000 $80.000
REPLACE SGT OBJECT MARKER
EA 50.000 $25.000 $25.000 $35.000 $50.000 $50.000
REM & REPLACE BLOCKOUTS (FURNISHED)
EA 250.000 $10.000 $10.000 $10.000 $10.000 $8.000
REPLACE POSTS (TL-4)
EA 75.000 $200.000 $185.000 $250.000 $200.000 $135.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $300.000 $300.000 $400.000 $300.000 $50.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $50.000 $50.000 $100.000 $50.000 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $1,250.000 $1,300.000 $1,000.000 $1,250.000 $1,500.000
REPLACE CABLE (TL-4)
LF 500.000 $2.500 $5.000 $2.000 $2.500 $2.000
CHECK / RE-TENSION CABLE
EA 50.000 $200.000 $50.000 $200.000 $200.000 $100.000
REPLACE POST HARDWARE (TL-4)
EA 40.000 $40.000 $25.000 $50.000 $40.000 $75.000
REMOVE AND REPLACE (SMTC) (N)
EA 2.000 $25,000.000 $29,000.000 $31,000.000 $25,000.000 $32,000.000
REPAIR (SMTC) (N)
EA 2.000 $3,000.000 $2,000.000 $1,500.000 $3,000.000 $4,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $43,000.000 $35,000.000 $43,000.000 $30,000.000 $35,000.000
REPAIR (SMTC) (W)
EA 1.000 $4,500.000 $3,500.000 $1,500.000 $4,500.000 $4,000.000
TMA (STATIONARY)
DAY 100.000 $100.000 $1.000 $1.000 $1.000 $1.000
Totals: $584,226.000 $555,451.000 $607,750.000 $615,366.000 $640,931.000