Show Job Controls
Bid Cobra

MONTGOMERY IH0045 (6371-40-001)

Items: 68

County: MONTGOMERY
Length: N/A
Highway: IH0045
District: HOUSTON
Control Number: 6371-40-001
DBE Goal: N/A
Project: RMC - 637140001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $479,715.00
Date: 03/05/2021 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$479,715.00
$356,696.25
Over/Under Est: -25.64% -$123,018.75
Over/Under Est: -12.25% -$58,774.00
Amt Left: 18.01% $64,244.75
Over/Under Est: 2.54% $12,181.00
Amt Left: 37.9% $135,199.75
Delta: -16.86% -$70,955.00
Over/Under Est: 16.48% $79,040.00
Amt Left: 56.65% $202,058.75
Delta: -13.59% -$66,859.00

Bid Items & Bid Tabulations

68 Total 0 of 68
MONTGOMERY  |  IH0045  |  HOUSTON  |  6371-40-001  |  03/05/2021  |  $479,715.00  |  RMC - 637140001  |  GUARDRAIL REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
ISI CONTRACTING, INC.
ELITE CASTLE RESOURCES LLC
K-BAR SERVICES, INC.
REMOVING CONC (CTB)
LF 50.000 $10.000 $14.000 $17.000 $10.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 50.000 $20.000 $9.800 $6.000 $25.000 $50.000
BACKFILL (TY A OR B)
CY 5.000 $150.000 $40.000 $100.000 $150.000 $30.000
STRUCT EXCAV
CY 5.000 $35.000 $75.000 $20.000 $250.000 $40.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 5.000 $225.000 $245.000 $200.000 $1,200.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $600.000 $440.000 $800.000 $500.000 $450.000
MOBILIZATION (CALLOUT)
EA 26.000 $750.000 $1.000 $300.000 $1.000 $500.000
MOBILIZATION (EMERGENCY)
EA 1.000 $1,500.000 $1.000 $1,000.000 $1,500.000 $1,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 50.000 $50.000 $48.000 $65.000 $60.000 $80.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 50.000 $25.000 $25.000 $15.000 $30.000 $30.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 50.000 $5.000 $5.000 $5.000 $25.000 $20.000
PERM CTB (F-SHAPE) (TY 1)
LF 50.000 $20.000 $20.000 $50.000 $150.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $25.000 $20.500 $20.000 $28.000 $25.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $25.000 $23.000 $32.000 $28.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $1,750.000 $1,275.000 $2,200.000 $2,000.000 $500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $10.000 $9.600 $10.000 $9.000 $20.000
SHORT RADIUS
LF 125.000 $50.000 $32.000 $40.000 $40.000 $30.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,200.000 $1,200.000 $3,450.000 $1,200.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $30.000 $19.800 $20.000 $25.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $2.000 $1.900 $1.000 $8.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $1,000.000 $250.000 $1.000 $100.000 $50.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $10.000 $250.000 $100.000 $50.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,500.000 $2,450.000 $2,700.000 $4,000.000 $3,500.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $1,000.000 $350.000 $550.000 $500.000 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $1,000.000 $350.000 $200.000 $500.000 $300.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $5,000.000 $480.000 $2,100.000 $5,000.000 $1,000.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $480.000 $750.000 $2,500.000 $1,000.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $3,000.000 $480.000 $1,000.000 $2,500.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $10,000.000 $2,500.000 $1,000.000 $1,500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $7,500.000 $14,850.000 $16,000.000 $10,000.000 $20,222.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 500.000 $15.000 $10.000 $15.000 $20.000 $30.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 150.000 $20.000 $15.000 $15.000 $20.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $17.000 $15.500 $16.000 $30.000 $28.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 50.000 $25.000 $19.500 $15.000 $15.000 $28.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 15.000 $25.000 $19.500 $15.000 $15.000 $30.000
RAISE RAIL ELEMENT
LF 300.000 $10.000 $8.500 $5.000 $8.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 50.000 $40.000 $45.000 $38.000 $30.000 $30.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 200.000 $45.000 $40.000 $42.000 $50.000 $31.000
REALIGN POSTS
EA 25.000 $10.000 $2.000 $7.000 $35.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 2,000.000 $22.000 $23.100 $22.000 $20.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 150.000 $70.000 $70.000 $42.000 $250.000 $120.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $1.000 $25.000 $1.000 $50.000 $5.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 20.000 $3,650.000 $3,780.000 $2,900.000 $3,000.000 $3,800.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 20.000 $1,500.000 $1,100.000 $950.000 $1,550.000 $700.000
REM & RESET SGT IMPACT HEAD
EA 20.000 $75.000 $200.000 $85.000 $100.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $75.000 $75.000 $94.000 $50.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $75.000 $75.000 $94.000 $50.000 $30.000
REPLACE SGT STRUT
EA 20.000 $75.000 $75.000 $85.000 $50.000 $50.000
REPLACE SGT OBJECT MARKER
EA 20.000 $25.000 $20.000 $25.000 $100.000 $30.000
REM & REPLACE BLOCKOUTS (FURNISHED)
EA 100.000 $5.000 $5.000 $5.000 $10.000 $5.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $120.000 $125.000 $300.000 $100.000 $1,000.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $50.000 $93.000 $50.000 $50.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $550.000 $1,100.000 $900.000 $500.000 $1,000.000
REPLACE CABLE (TL-4)
LF 2,500.000 $2.000 $1.000 $3.000 $4.000 $1.000
CHECK / RE-TENSION CABLE
EA 10.000 $125.000 $190.000 $240.000 $500.000 $300.000
REPLACE POST HARDWARE (TL-4)
EA 5.000 $15.000 $7.350 $35.000 $150.000 $10.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 100.000 $13.000 $12.000 $9.000 $20.000 $10.000
REMOVE AND REPLACE (SMTC) (N)
EA 1.000 $22,400.000 $15,250.000 $24,000.000 $26,000.000 $23,286.000
REPAIR (SMTC) (N)
EA 1.000 $4,000.000 $1,700.000 $1,100.000 $2,500.000 $1,058.000
REMOVE AND REPLACE (SMTC) (W)
EA 1.000 $28,000.000 $21,000.000 $29,000.000 $34,000.000 $32,000.000
REPAIR (SMTC) (W)
EA 1.000 $4,000.000 $1,900.000 $4,000.000 $2,500.000 $1,514.000
REPAIR TAU II (W)
LF 50.000 $75.000 $100.000 $175.000 $200.000 $291.000
REMOVE AND REPLACE TAU II (W)
EA 1.000 $25,000.000 $19,000.000 $25,000.000 $25,000.000 $34,800.000
REPAIR (TAU)(II)(W)(BAY)
EA 1.000 $1,200.000 $495.000 $1,500.000 $2,000.000 $1,500.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 1.000 $20,000.000 $13,000.000 $20,600.000 $26,000.000 $25,000.000
REPAIR (TAU)(MASH)(N)
EA 1.000 $2,500.000 $950.000 $2,500.000 $3,000.000 $3,000.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 1.000 $1,000.000 $500.000 $1,600.000 $2,000.000 $3,000.000
TMA (STATIONARY)
DAY 120.000 $400.000 $1.000 $250.000 $1.000 $400.000
Totals: $479,715.000 $356,696.250 $420,941.000 $491,896.000 $558,755.000