MONTGOMERY IH0045 (6346-59-001)

Items: 323

County: MONTGOMERY
Length: N/A
Highway: IH0045
District: HOUSTON
Control Number: 6346-59-001
DBE Goal: N/A
Project: RMC - 634659001
Guaranty: N/A
Time: 364 CALENDAR DAYS
Engineer's Estimate: $4,638,604.30
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: GENERAL MAINTENANCE OF IH 45
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,638,604.30
$4,625,715.00
Over/Under Est: -0.28% -$12,889.30
Over/Under Est: 2.68% $124,539.20
Amt Left: 2.97% $137,428.50
$5,575,635.50
Over/Under Est: 20.2% $937,031.20
Amt Left: 20.54% $949,920.50
Delta: -17.06% -$812,492.00

Bid Items & Bid Tabulations

323 Total 0 of 323
MONTGOMERY  |  IH0045  |  HOUSTON  |  6346-59-001  |  11/06/2019  |  $4,638,604.30  |  RMC - 634659001  |  GENERAL MAINT OF IH 45  |  364 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
DBI SERVICES, LLC
REMOVING CONC (PAV)
SY 25.000 $7.500 $12.000 $200.000 $20.000
REMOVING CONC (CURB)
LF 100.000 $2.500 $1.500 $3.500 $7.000
REMOVING CONC (CTB)
LF 100.000 $16.000 $15.000 $9.000 $14.000
REMOVING CONCRETE(MOW STRIP)
LF 100.000 $75.000 $4.000 $6.000 $10.000
BACKFILL (TY A OR B)
CY 10.000 $13.790 $100.000 $50.000 $100.000
BACKFILLING PAVEMENT EDGES
CY 25.000 $75.000 $100.000 $145.000 $35.000
BLADING
HR 500.000 $120.000 $120.000 $85.000 $150.000
BLOCK SODDING
SY 50.000 $2.840 $3.000 $7.000 $20.000
D-GR HMA TY-D SAC-A PG70-22
TON 50.000 $150.000 $120.000 $150.000 $135.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 200.000 $70.000 $70.000 $100.000 $108.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 25.000 $80.000 $78.000 $75.000 $75.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 25.000 $89.000 $89.000 $85.000 $79.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 100.000 $105.000 $98.000 $90.000 $124.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 25.000 $105.000 $106.000 $90.000 $94.000
FULL - DEPTH REPAIR CRCP (8"-14")
SY 500.000 $275.000 $290.000 $275.000 $350.000
FULL-DEPTH REPAIR CRCP (13"-15")
SY 250.000 $325.000 $300.000 $150.000 $280.000
STRUCT EXCAV
CY 25.000 $14.000 $25.000 $15.000 $5.000
DRILL SHAFT (SIGN MTS) (12 IN)
LF 25.000 $35.000 $36.000 $60.000 $40.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 25.000 $35.000 $36.000 $75.000 $48.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 100.000 $105.000 $99.000 $75.000 $80.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 100.000 $150.000 $125.000 $80.000 $110.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 250.000 $50.000 $75.000 $40.000 $95.000
CONC STR REPR(RAPID VERT AND OVERHEAD)
SF 250.000 $55.000 $75.000 $75.000 $98.000
CONC STR REPAIR (STANDARD)
SF 250.000 $50.000 $72.000 $65.000 $80.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 25.000 $75.000 $200.000 $90.000 $710.000
RIPRAP (MOW STRIP)(4 IN)
CY 25.000 $300.000 $460.000 $350.000 $300.000
CLEANING AND SEALING JOINTS (CL 7)
LF 1,000.000 $28.000 $23.000 $18.000 $24.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 250.000 $200.000 $228.000 $95.000 $90.000
CMP (GAL STL 24 IN)
LF 5.000 $55.000 $55.000 $80.000 $50.000
INLET (COMPL)(TY AAD)
EA 2.000 $2,700.000 $3,000.000 $2,000.000 $1,800.000
INLET (STG II)(TY C)
EA 2.000 $1,600.000 $1,600.000 $1,000.000 $1,500.000
GRATE & FRAME
EA 1.000 $1,770.000 $900.000 $1,000.000 $700.000
FRAME & COVER
EA 1.000 $764.000 $475.000 $750.000 $750.000
RING & COVER
EA 1.000 $336.000 $700.000 $700.000 $650.000
ADJUSTING MANHOLES
EA 1.000 $1,260.000 $415.000 $400.000 $625.000
REMOV STR (INLET)
EA 1.000 $567.000 $315.000 $450.000 $300.000
MOBILIZATION (CALLOUT)
EA 52.000 $60.000 $60.000 $250.000 $800.000
MOBILIZATION (EMERGENCY)
EA 104.000 $60.000 $60.000 $350.000 $540.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 2)
LF 100.000 $25.000 $24.000 $3.000 $8.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,500.000 $3.000 $4.000 $15.000 $7.000
PORT CTB (MOVE)(SGL SLP)(TY 2)
LF 325.000 $3.000 $2.000 $1.000 $2.000
PORT CTB (MOVE)(SGL SLP)(TY 4)
LF 325.000 $3.000 $2.000 $1.000 $2.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 450.000 $16.000 $10.000 $1.000 $8.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 250.000 $3.000 $2.000 $18.000 $2.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 250.000 $13.000 $12.000 $14.000 $8.000
PORT CTB (DES SOURCE)(SAFETY SH)
LF 100.000 $18.000 $18.000 $35.000 $8.000
PORT CTB (MOVE)(SAFETY SH)
LF 100.000 $2.000 $2.000 $50.000 $2.000
PORT CTB (STKPL)(SAFETY SH)
LF 100.000 $10.000 $20.000 $15.000 $8.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 150.000 $58.000 $59.000 $30.000 $35.000
PERM CTB (SGL SLOPE) (TY 2) (42 )
LF 150.000 $58.000 $59.000 $30.000 $35.000
CONC CURB (TY I)
LF 150.000 $4.000 $6.000 $1.000 $4.000
CONC CURB (TY II)
LF 500.000 $3.000 $6.000 $1.000 $4.000
CONC CURB (MONO) (TY I)
LF 100.000 $2.000 $5.000 $1.000 $4.000
CONC CURB (MONO) (TY II)
LF 100.000 $2.000 $7.000 $1.000 $4.000
CONC CURB & GUTTER (TY I)
LF 100.000 $14.000 $14.000 $10.000 $10.000
CONC CURB & GUTTER (TY II)
LF 100.000 $14.000 $14.000 $10.000 $10.000
CONC CURB (DOWEL)
LF 1,000.000 $12.000 $9.000 $15.000 $4.000
CONC SIDEWALKS (6")
SY 25.000 $42.000 $60.000 $115.000 $15.000
MTL W-BEAM GD FEN (TIM POST)
LF 300.000 $18.000 $18.000 $14.000 $6.500
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $19.000 $20.000 $19.000 $8.500
TERMINAL ANCHOR SECTION
EA 5.000 $100.000 $1.000 $70.000 $50.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,000.000 $2,200.000 $450.000 $1,400.000
SHORT RADIUS
LF 200.000 $23.000 $23.000 $50.000 $30.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $137.000 $17.000 $30.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $2.000 $2.000 $1.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $1.000 $1.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,400.000 $2,875.000 $2,000.000 $2,700.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 5.000 $400.000 $400.000 $100.000 $450.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $260.000 $250.000 $100.000 $250.000
CRASH CUSH ATTEN (DES SOURCE)
EA 1.000 $3,000.000 $2,900.000 $1,500.000 $750.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,100.000 $1,200.000 $1,000.000 $750.000
CRASH CUSH ATTEN (STKPL)
EA 1.000 $1,200.000 $900.000 $1,250.000 $400.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $10,000.000 $500.000 $400.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 2.000 $26,000.000 $23,000.000 $10,000.000 $17,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $24,000.000 $24,000.000 $10,000.000 $23,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 2.000 $20,000.000 $18,000.000 $10,000.000 $10,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 2.000 $18,000.000 $35,000.000 $13,000.000 $27,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N)
EA 2.000 $20,350.000 $10,000.000 $10,000.000 $5,000.000
CRASH CUSHION ATTEN (INSTALL) (QUAD)(W)
EA 2.000 $20,350.000 $10,000.000 $13,000.000 $5,000.000
ALUMINUM SIGNS (TY A)
SF 250.000 $17.000 $20.000 $14.000 $16.000
ALUMINUM SIGNS (TY G)
SF 250.000 $17.000 $15.000 $14.000 $19.000
ALUMINUM SIGNS (TY O)
SF 250.000 $17.000 $15.000 $14.000 $21.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 7,500.000 $15.000 $20.000 $18.000 $20.000
REPLACE EXISTING ALUMINUM SIGNS(TY G)
SF 250.000 $15.000 $20.000 $19.000 $20.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 250.000 $40.000 $20.000 $29.000 $20.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 50.000 $300.000 $297.000 $400.000 $370.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $400.000 $423.000 $400.000 $415.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $500.000 $423.000 $500.000 $325.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 1.000 $500.000 $533.000 $500.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 200.000 $330.000 $501.000 $550.000 $490.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $400.000 $406.000 $500.000 $370.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $225.000 $546.000 $500.000 $320.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 1.000 $185.000 $426.000 $500.000 $320.000
IN SM RD SN SUP&AM TYS80(1)SA(P-EXAL)
EA 1.000 $185.000 $423.000 $400.000 $490.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $220.000 $454.000 $500.000 $350.000
IN SM RD SN SUP&AM TYS80(1)SA(T-EXAL)
EA 1.000 $185.000 $650.000 $1,000.000 $490.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $265.000 $473.000 $800.000 $370.000
IN SM RD SN SUP&AM TYS80(1)SB(P)
EA 1.000 $220.000 $648.000 $700.000 $410.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 1.000 $220.000 $400.000 $700.000 $490.000
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 1.000 $300.000 $550.000 $850.000 $490.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $350.000 $530.000 $1,000.000 $550.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 200.000 $380.000 $150.000 $325.000 $220.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $400.000 $275.000 $450.000 $330.000
INSTALL LRSS (STRUCT STEEL)
LB 100.000 $5.000 $4.000 $6.000 $4.800
REMOVE LRSA
EA 1.000 $300.000 $350.000 $1,000.000 $1,300.000
REMOVE LRSA (FOUNDATION ONLY)(24 IN)
EA 1.000 $150.000 $150.000 $100.000 $660.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2,000.000 $4.000 $3.000 $4.000 $4.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 1,000.000 $4.000 $3.000 $3.900 $6.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 300.000 $14.000 $13.000 $25.000 $35.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 1,000.000 $3.000 $4.000 $3.900 $4.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 2,000.000 $3.500 $4.000 $4.000 $9.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 100.000 $10.000 $4.000 $25.000 $4.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $12.000 $14.000 $15.000 $9.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,000.000 $0.380 $1.050 $1.100 $0.670
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 2,000.000 $0.440 $1.300 $1.350 $1.480
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 150.000 $0.900 $1.400 $1.450 $1.940
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,000.000 $0.900 $0.800 $0.830 $1.940
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 150.000 $1.000 $1.600 $1.650 $2.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 7,500.000 $1.000 $3.200 $3.300 $2.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,000.000 $1.100 $5.300 $5.500 $5.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 50.000 $82.000 $117.000 $120.000 $149.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 25.000 $104.000 $150.000 $155.000 $224.000
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
EA 1.000 $136.000 $150.000 $155.000 $160.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 10.000 $142.000 $150.000 $155.000 $350.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 3.000 $300.000 $149.000 $155.000 $350.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 150.000 $163.000 $130.000 $130.000 $186.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 9.000 $270.000 $535.000 $550.000 $2,090.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 9.000 $270.000 $535.000 $550.000 $1,490.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 5.000 $325.000 $640.000 $650.000 $850.000
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
EA 1.000 $190.000 $107.000 $110.000 $1,700.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 10.000 $27.000 $43.000 $44.000 $50.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 300.000 $0.900 $0.700 $0.720 $1.700
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 300.000 $1.000 $3.200 $3.300 $3.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 300.000 $1.100 $5.300 $5.500 $8.500
REFL PAV MRK TY I (Y)(ISLAND)(100MIL)
SF 15.000 $490.000 $4.250 $4.400 $8.900
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 2,500.000 $1.100 $0.700 $0.700 $0.900
REFL PAV MRK TY II (Y) 12" (SLD)
LF 2,000.000 $0.750 $2.250 $2.200 $2.200
PAVEMENT SEALER 4"
LF 1,000.000 $0.020 $0.160 $0.170 $0.100
PAVEMENT SEALER 6"
LF 4,500.000 $0.040 $0.210 $0.220 $0.220
PAVEMENT SEALER 8"
LF 2,450.000 $0.070 $0.320 $0.330 $0.310
PAVEMENT SEALER 12"
LF 9,950.000 $0.110 $0.650 $0.650 $0.460
PAVEMENT SEALER 24"
LF 1,300.000 $0.140 $1.350 $1.370 $1.870
PAVEMENT SEALER (ARROW)
EA 50.000 $5.450 $43.000 $44.000 $22.000
PAVEMENT SEALER (WORD)
EA 150.000 $8.700 $43.000 $44.000 $64.000
PAVEMENT SEALER (DBL ARROW)
EA 25.000 $11.000 $43.000 $44.000 $55.000
PAVEMENT SEALER (TPL ARROW)
EA 1.000 $13.000 $43.000 $44.000 $180.000
PAVEMENT SEALER (UTURN ARROW)
EA 10.000 $16.000 $43.000 $44.000 $135.000
PAVEMENT SEALER (ENTR GORE)
EA 9.000 $20.000 $215.000 $220.000 $413.000
PAVEMENT SEALER (EXIT GORE)
EA 9.000 $20.000 $215.000 $220.000 $292.000
PAVEMENT SEALER (SYMBOL)
EA 1.000 $22.000 $75.000 $77.000 $34.000
PAVEMENT SEALER (RR XING)
EA 5.000 $23.000 $155.000 $160.000 $677.000
PAVEMENT SEALER (YLD TRI)
EA 10.000 $2.150 $53.000 $55.000 $12.000
PAVEMENT SEALER (ISLAND)
SF 15.000 $16.000 $2.100 $2.200 $71.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,500.000 $0.380 $0.600 $0.600 $1.340
PREFAB PAV MRK TY C (MULTI) (SHIELD)
EA 2.000 $1,300.000 $2,700.000 $1,600.000 $2,244.000
REFL PAV MRKR TY I-A
EA 550.000 $3.250 $4.250 $4.400 $4.000
REFL PAV MRKR TY I-C
EA 575.000 $3.250 $4.250 $4.400 $5.800
REFL PAV MRKR TY II-A-A
EA 875.000 $3.250 $4.250 $4.400 $5.800
REFL PAV MRKR TY II-C-R
EA 2,250.000 $3.250 $4.250 $4.400 $5.800
ELIM EXT PAV MRK & MRKS (4")
LF 1,000.000 $0.110 $0.350 $0.330 $0.300
ELIM EXT PAV MRK & MRKS (6")
LF 4,500.000 $0.160 $0.550 $0.550 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 2,450.000 $0.280 $0.700 $0.720 $0.750
ELIM EXT PAV MRK & MRKS (12")
LF 9,950.000 $0.350 $1.600 $1.650 $1.120
ELIM EXT PAV MRK & MRKS (24")
LF 1,300.000 $0.650 $3.200 $3.300 $2.620
ELIM EXT PAV MRK & MRKS (ARROW)
EA 50.000 $11.000 $59.000 $60.000 $82.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 25.000 $13.000 $59.000 $60.000 $82.000
ELIM EXT PAV MRK & MRKS (TPL ARROW)
EA 1.000 $16.000 $59.000 $60.000 $186.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 150.000 $22.000 $59.000 $60.000 $82.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 9.000 $27.000 $80.000 $80.000 $718.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 9.000 $27.000 $80.000 $80.000 $508.000
ELIM EXT PAV MRK & MRKS (ISLAND)
SF 15.000 $38.000 $2.100 $2.200 $77.000
ELIM EXT PAV MRK & MRKS (RR XING)
EA 5.000 $44.000 $123.000 $125.000 $432.000
ELIM EXT PAV MRK & MRKS (SYMBOL)
EA 1.000 $49.000 $80.000 $80.000 $178.000
ELIM EXT PAV MRK & MRKS (36")(YLD TRI)
EA 10.000 $20.000 $48.000 $50.000 $15.000
ELIM EXT PAV MRK & MRKS (SHEILD)
EA 2.000 $38.000 $530.000 $550.000 $256.000
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
EA 10.000 $22.000 $80.000 $82.000 $324.000
PAV SURF PREP FOR MRK (4")
LF 1,000.000 $0.010 $0.060 $0.070 $0.090
PAV SURF PREP FOR MRK (6")
LF 4,500.000 $0.020 $0.080 $0.090 $0.190
PAV SURF PREP FOR MRK (8")
LF 2,450.000 $0.050 $0.100 $0.100 $0.250
PAV SURF PREP FOR MRK (12")
LF 9,950.000 $0.090 $0.500 $0.500 $0.370
PAV SURF PREP FOR MRK (24")
LF 1,300.000 $0.110 $1.000 $1.000 $1.290
PAV SURF PREP FOR MRK (ARROW)
EA 50.000 $1.100 $24.000 $24.000 $186.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 25.000 $1.100 $24.000 $24.000 $280.000
PAV SURF PREP FOR MRK (TPL ARROW)
EA 1.000 $1.300 $24.000 $24.000 $277.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 10.000 $1.350 $24.000 $24.000 $373.000
PAV SURF PREP FOR MRK (WORD)
EA 150.000 $1.650 $24.000 $24.000 $186.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 9.000 $2.200 $48.000 $50.000 $313.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 9.000 $2.200 $48.000 $50.000 $212.000
PAV SURF PREP FOR MRK (ISLAND)
SF 15.000 $3.250 $4.250 $4.400 $77.000
PAV SURF PREP FOR MRK (RR XING)
EA 5.000 $3.250 $48.000 $50.000 $246.000
PAV SURF PREP FOR MRK (SYMBOL)
EA 1.000 $3.250 $48.000 $50.000 $1,209.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 10.000 $2.180 $9.600 $10.000 $68.000
PAV SURF PREP FOR MRKS (SHIELD)
EA 1.000 $5.450 $24.000 $24.000 $513.000
POTHOLE REPAIR (STANDARD)
SY 300.000 $80.000 $100.000 $75.000 $78.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,000.000 $2.210 $3.500 $5.000 $4.550
FULL - WIDTH MOWING
AC 3,198.000 $45.000 $40.000 $38.000 $54.000
SPOT MOWING
AC 50.000 $44.000 $40.000 $39.000 $54.000
LITTER REMOVAL
AC 13,382.000 $14.000 $15.000 $13.000 $27.000
LITTER REMOVAL (SPOT)
AC 100.000 $30.000 $30.000 $20.000 $27.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 26.000 $7,200.000 $3,000.000 $3,000.000 $3,800.000
DEBRIS REMOVAL (FRONTAGE ROADS)
CYC 26.000 $5,800.000 $3,000.000 $3,000.000 $3,065.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 26.000 $4,800.000 $3,000.000 $3,000.000 $3,000.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 250.000 $200.000 $230.000 $350.000 $110.000
CLEANING / SWEEPING (CENTER MEDIAN)
CYC 26.000 $8,500.000 $7,000.000 $8,950.000 $8,890.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 26.000 $6,100.000 $7,000.000 $8,950.000 $8,890.000
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 26.000 $6,100.000 $6,500.000 $8,950.000 $8,890.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 26.000 $4,000.000 $6,500.000 $8,950.000 $8,890.000
CLEANING / SWEEPING (SPOT)
MI 200.000 $200.000 $250.000 $290.000 $200.000
CLEANING / SWEEPING (HANDWORK)
SY 75,000.000 $0.550 $0.500 $0.850 $0.370
GRAFFITI REMOVAL (BLAST CLEANING)
SF 200.000 $1.000 $2.000 $15.000 $1.260
GRAFFITI REMOVAL (PAINTING)
SF 200.000 $1.460 $10.000 $10.000 $2.760
TREE TRIMMING / BRUSH REMOVAL
MI 10.000 $1,500.000 $1,100.000 $1,500.000 $940.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 5.000 $1,500.000 $1,500.000 $1,500.000 $860.000
TREE REMOVAL (4" - 12" DIA)
EA 10.000 $100.000 $125.000 $200.000 $120.000
TREE REMOVAL (12" - 18" DIA)
EA 10.000 $200.000 $225.000 $125.000 $140.000
TREE REMOVAL (18" - 24" DIA)
EA 5.000 $300.000 $280.000 $200.000 $160.000
TREE REMOVAL (24" - 30" DIA)
EA 5.000 $300.000 $300.000 $250.000 $180.000
TREE REMOVAL (30" - 36" DIA)
EA 5.000 $300.000 $300.000 $300.000 $215.000
TREE REMOVAL (36" - 42" DIA)
EA 5.000 $300.000 $400.000 $350.000 $320.000
TREE REMOVAL (42" - 48" DIA)
EA 5.000 $300.000 $400.000 $400.000 $640.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 10,000.000 $1.750 $4.500 $1.000 $4.000
DRAIN INLET CLEANING
EA 250.000 $75.000 $75.000 $80.000 $105.000
PUMP STATION WELL CLEANING
EA 8.000 $1,900.000 $1,900.000 $2,000.000 $2,500.000
BASKET AND INLET PIPE CLEANING
EA 8.000 $550.000 $560.000 $550.000 $747.000
DOWNSPOUT CLEANING
EA 8.000 $330.000 $335.000 $350.000 $300.000
SUMP CLEANING
EA 5.000 $550.000 $560.000 $550.000 $750.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 1,250.000 $5.500 $4.500 $5.000 $6.000
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 12,500.000 $7.700 $6.600 $6.900 $9.000
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 5,000.000 $8.800 $7.700 $7.090 $10.500
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 15,000.000 $10.000 $8.800 $8.450 $11.950
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 2,500.000 $12.000 $10.500 $10.900 $14.950
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 2,500.000 $16.000 $13.950 $14.900 $19.400
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
LF 10.000 $22.000 $21.500 $25.000 $20.500
STORM SEWER CLEANING (PIPE)(75"-96"DIA)
LF 10.000 $33.000 $32.000 $35.000 $30.800
STORM SEWER CLEAN (BOX CULV) (<6 SF)
LF 10.000 $14.000 $11.250 $15.000 $16.400
STORM SEWER CLEAN (BOX CULV) (6-<12 SF)
LF 1,500.000 $15.000 $13.400 $16.000 $18.700
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 10.000 $18.000 $15.400 $17.000 $20.000
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 10.000 $20.000 $18.700 $19.000 $20.000
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 4,000.000 $22.000 $21.000 $20.800 $30.000
STORM SEWER CLEAN (BOX CULV) (>96 SF)
LF 10.000 $18.000 $32.000 $32.000 $31.000
SLOTTED DRAIN CLEANING
LF 2,000.000 $12.000 $10.000 $11.000 $13.500
REPAIR RAIL ELEMENT (W - BEAM)
LF 4,500.000 $13.000 $15.000 $14.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 100.000 $5.000 $6.000 $50.000 $17.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $5.000 $6.000 $30.000 $32.000
RAISE RAIL ELEMENT
LF 25.000 $10.000 $12.000 $35.000 $10.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 50.000 $30.000 $33.000 $45.000 $66.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 350.000 $38.000 $41.000 $45.000 $51.000
REALIGN POSTS
EA 35.000 $6.000 $7.000 $5.000 $16.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $14.500 $20.000 $17.750 $20.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 500.000 $34.000 $38.000 $65.000 $70.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 5.000 $45.000 $1.000 $100.000 $230.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $45.000 $1.000 $100.000 $350.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 5.000 $2,400.000 $2,800.000 $2,750.000 $2,700.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 100.000 $850.000 $875.000 $850.000 $1,180.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $100.000 $100.000 $300.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 100.000 $100.000 $100.000 $100.000 $140.000
REPLACE SGT CABLE ANCHOR
EA 100.000 $82.000 $85.000 $100.000 $130.000
REPLACE SGT STRUT
EA 50.000 $57.000 $60.000 $70.000 $80.000
REPLACE SGT OBJECT MARKER
EA 100.000 $17.000 $15.000 $25.000 $40.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 225.000 $25.000 $26.000 $28.000 $22.000
REM & REPLACE BLOCKOUTS (FURNISHED)
EA 300.000 $6.500 $7.000 $5.000 $11.000
REPAIR STEEL POST WITH BASE PLATE
EA 1.000 $34.000 $100.000 $100.000 $280.000
REMOVE AND REPLACE (NARROW QUAD)
EA 1.000 $34.000 $26,000.000 $15,000.000 $20,000.000
REPAIR (NARROW QUAD)
EA 1.000 $34.000 $3,500.000 $1,500.000 $3,000.000
REPAIR (QUAD) (N) (BAY)
EA 1.000 $1,025.000 $1,200.000 $1,000.000 $1,500.000
REMOVE AND REPLACE (SMTC) (N)
EA 8.000 $16,800.000 $23,000.000 $13,000.000 $17,000.000
REPAIR (SMTC) (N)
EA 4.000 $2,400.000 $750.000 $3,000.000 $3,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 6.000 $24,400.000 $29,000.000 $17,500.000 $23,300.000
REPAIR (SMTC) (W)
EA 4.000 $2,400.000 $750.000 $1,500.000 $1,000.000
REMOVE AND REPLACE (TAU II) (N)
EA 2.000 $17,000.000 $19,000.000 $13,000.000 $20,000.000
REPAIR TAU II (N) (MISC HARDWARE)
EA 2.000 $1,725.000 $1,800.000 $1,500.000 $2,000.000
REPAIR TAU II (N)
LF 200.000 $171.300 $75.000 $125.000 $160.000
REPAIR TAU II (W)
LF 200.000 $155.000 $75.000 $125.000 $160.000
REPAIR (SMTC) (N)
LF 200.000 $125.000 $75.000 $125.000 $160.000
REPAIR (QUAD) (N) (NOSE)
EA 2.000 $1,200.000 $1,100.000 $500.000 $1,200.000
REMOVE AND REPLACE TAU II (W)
EA 2.000 $22,000.000 $25,000.000 $10,000.000 $23,300.000
REPAIR TAU II (W) (MISC HARDWARE)
EA 2.000 $1,900.000 $2,000.000 $1,000.000 $1,800.000
QUAD(N)(BAY)CARTRIDGE(REMOVE & REPLACE)
EA 2.000 $1,300.000 $1,000.000 $1,000.000 $1,300.000
QUAD(N)(BAY)NOSE ASSMBLY(REMOVE&REPLAC)
EA 2.000 $1,050.000 $750.000 $1,000.000 $1,300.000
QUAD(N)(BAY)DIAPHRAGM(REMOVE & REPLACE)
EA 2.000 $1,200.000 $1,100.000 $1,000.000 $950.000
REPAIR (STEEL POST W/ W-BEAM - T101)
LF 200.000 $15.000 $19.000 $15.000 $75.000
REPAIR (ALUMINUM RAIL)
LF 10.000 $95.000 $100.000 $50.000 $100.000
REPAIR (STEEL RAIL)
LF 10.000 $67.000 $75.000 $100.000 $100.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 10,000.000 $6.650 $5.500 $5.500 $6.000
TYPE CAC CONCRETE
CY 10.000 $2,500.000 $650.000 $2,000.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 100.000 $80.000 $80.000 $115.000 $60.000
MULTIPOLYMER PAV MRK (W)(4")(SLD)
LF 1,000.000 $0.450 $0.500 $0.600 $0.820
MULTIPOLYMER PAV MRK (W)(4")(BRK)
LF 1,000.000 $0.530 $0.500 $0.600 $0.820
MULTIPOLYMER PAV MRK (W)(4")(DOT)
LF 1,000.000 $0.450 $1.350 $1.300 $0.820
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 7,500.000 $0.560 $0.600 $0.800 $1.270
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 5,000.000 $0.570 $0.600 $0.800 $1.270
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 1,000.000 $1.140 $0.700 $0.680 $1.270
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 2,500.000 $1.120 $1.100 $1.030 $1.720
MULTIPOLYMER PAV MRK (W)(8")(DOT)
LF 500.000 $0.800 $1.350 $1.300 $1.720
MULTIPOLYMER PAV MRK (W)(8")(LNDP)
LF 1,000.000 $2.000 $1.350 $1.300 $1.720
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 500.000 $5.580 $8.300 $7.900 $6.300
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 100.000 $0.640 $0.500 $0.600 $0.820
MULTIPOLYMER PAV MRK (Y)(4")(BRK)
LF 100.000 $0.600 $0.500 $0.600 $0.820
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 7,500.000 $0.700 $0.600 $0.800 $1.270
MULTIPOLYMER PAV MRK (Y)(6")(BRK)
LF 1,000.000 $0.770 $0.600 $0.800 $1.270
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 500.000 $0.970 $1.350 $1.350 $1.720
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 500.000 $2.000 $4.250 $4.250 $2.470
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 100.000 $5.500 $8.250 $8.250 $6.350
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 7,500.000 $0.870 $0.600 $0.800 $1.270
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 1.000 $75.000 $160.000 $155.000 $600.000
MULTIPOLYMER PAV MRK (W) (DBL ARROW)
EA 1.000 $150.000 $216.000 $210.000 $400.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 1.000 $150.000 $180.000 $175.000 $400.000
MULTIPOLYMER PAV MRK (W) 36" YLD TRI
EA 1.000 $150.000 $110.000 $110.000 $400.000
REPAIR LG RDSD SIGN SUPT & ASSEMBLIES
EA 10.000 $750.000 $750.000 $600.000 $1,900.000
RELOC LG RDSD SIGN SUPT & ASSEMBLIES
EA 1.000 $50.000 $1,000.000 $400.000 $4,060.000
REPL LARGE RDSD SIGN SUPP & ASSEM
EA 1.000 $100.000 $2,000.000 $1,000.000 $7,050.000
REMV LARGE RDSD SIGN SUPP & ASSEM
EA 1.000 $100.000 $300.000 $300.000 $1,650.000
REPAIR SMALL RDSD SIGN SUPT & ASSEM
EA 50.000 $500.000 $300.000 $400.000 $560.000
RELOC SMALL RDSD SIGN SUPT & ASSEM
EA 1.000 $50.000 $275.000 $100.000 $900.000
REMV SMALL RDSD SIGN SUPP & ASSEM
EA 1.000 $50.000 $100.000 $350.000 $300.000
TMA (STATIONARY)
DAY 100.000 $120.000 $125.000 $800.000 $260.000
TMA (MOBILE OPERATION)
DAY 100.000 $10.000 $500.000 $800.000 $260.000
STORM SEWER (TELEVISION INSPECTION)
LF 100.000 $5.500 $4.000 $4.000 $3.850
SNOW AND ICE CONTROL (TRUCK)
HR 175.000 $55.000 $60.000 $50.000 $150.000
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 175.000 $44.000 $50.000 $50.000 $50.000
SNOW AND ICE CONTROL (LOADER)
HR 175.000 $58.000 $60.000 $50.000 $160.000
SNOW AND ICE CONTROL (SEASON)
MO 3.000 $40,000.000 $20,000.000 $45,000.000 $36,800.000
SNOW AND ICE CONTROL (SPRAY RIG)
HR 175.000 $60.000 $60.000 $80.000 $145.000
Totals: $4,638,604.300 $4,625,715.000 $4,763,143.500 $5,575,635.500