MONTGOMERY SH 242 (3538-01-036)

Items: 273

County: MONTGOMERY
Length: N/A
Highway: SH 242
District: HOUSTON
Control Number: 3538-01-036
DBE Goal: N/A
Project: STP 2019(797)
Guaranty: N/A
Time: 778 WORKING DAYS
Engineer's Estimate: $66,032,352.64
Date: 08/06/2019 (6 years ago)
Contract Number: N/A
Type: WIDEN FROM 2 TO 4 LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$66,032,352.64
$65,322,056.94
Over/Under Est: -1.08% -$710,295.70
$65,332,897.33
Over/Under Est: -1.06% -$699,455.31
Amt Left: 0.02% $10,840.39
Over/Under Est: 6.31% $4,167,293.49
Amt Left: 7.47% $4,877,589.19
Delta: -7.45% -$4,866,748.80
Over/Under Est: 7.77% $5,133,698.86
Amt Left: 8.95% $5,843,994.56
Delta: -1.38% -$966,405.37
Over/Under Est: 18.35% $12,119,137.75
Amt Left: 19.64% $12,829,433.45
Delta: -9.82% -$6,985,438.89
Subcontractor Percentage Amount
CREACOM, INC. 4.21% $3,298,267.76
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.65% $2,076,106.78
M & D FOUNDATION DRILLING INDUSTRIES, INC. 1.30% $1,018,467.48
WILLOW CITY SIGN & RAIL, INC. 0.79% $618,914.85
PROFESSIONAL TRAFFIC CONTROL LLC 0.79% $618,914.85
MEMCO 0.64% $501,399.37
TEXOP CONSTRUCTION 0.55% $430,890.09
A BROTHERS MILLING, LLC 0.42% $329,043.34
J&B EXCAVATION LLC 0.33% $258,534.05
CPAVE, INC. 0.21% $164,521.67
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.20% $156,687.30
GOULD INDUSTRIES LLC 0.20% $156,687.30
LONESTAR TRAFFIC SAFETY, LLC 0.15% $117,515.48
VECTA ENVIRONMENTAL SERVICES, LLC 0.12% $94,012.38
TILGHMAN CRANE & TRANSPORT 0.12% $94,012.38
HIGHWAY 1 LLC 0.09% $70,509.29
PRIMATE CONSTRUCTION, LP 0.09% $70,509.29
DUSTROL, INC. 0.08% $62,674.92
J. T. B. SERVICES, INC. 0.07% $54,840.56
EAST - TEX PIPE AND FAB LLC 0.04% $31,337.46
TEXAS MATERIALS GROUP, INC. 0.03% $23,503.10
SCOTT DERR PAINTING CO, LLC 0.03% $23,503.10
CURB PLANET INC. 0.01% $7,834.37
Total: 13.12% $10,278,687.17

Bid Items & Bid Tabulations

273 Total 0 of 273
MONTGOMERY  |  SH 242  |  HOUSTON  |  3538-01-036  |  08/06/2019  |  $66,032,352.64  |  STP 2019(797)  |  WIDEN FROM 2 TO 4 LANES  |  778 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
J.D. ABRAMS, L.P.
PULICE CONSTRUCTION, INC.
HARPER BROTHERS CONSTRUCTION LLC
BALFOUR BEATTY INFRASTRUCTURE, INC.
PREPARING ROW
STA 385.000 $5,000.000 $5,600.000 $4,400.000 $8,000.000 $8,000.000 $12,750.000
REMOVING CONC (PAV)
SY 208,391.000 $10.000 $0.010 $2.750 $3.000 $2.500 $6.000
REMOVING CONC (RIPRAP)
SY 1,439.000 $8.500 $5.910 $3.800 $3.000 $3.000 $6.000
REMOVE CONC (RAIL)
LF 2,224.000 $12.100 $8.510 $6.900 $5.400 $10.000 $12.000
REMOVING CONC (FLUME)
SY 227.000 $13.500 $11.280 $10.000 $10.000 $3.000 $12.000
REMOVING STAB BASE AND ASPH PAV(6"-9")
SY 216,221.000 $4.000 $0.010 $0.900 $2.150 $4.500 $2.830
EXCAVATION (ROADWAY)
CY 229,449.000 $8.000 $4.690 $1.400 $1.750 $4.000 $8.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 254,936.000 $7.500 $6.740 $12.000 $14.000 $10.250 $14.000
FURNISHING AND PLACING TOPSOIL (4")
SY 4,641.000 $3.500 $3.350 $16.000 $7.500 $10.000 $2.000
BLOCK SODDING
SY 482,426.000 $3.000 $2.750 $2.900 $2.750 $3.150 $2.880
STRAW OR HAY MULCH
SY 501,888.000 $0.180 $0.190 $0.200 $0.190 $0.230 $0.200
BROADCAST SEED (TEMP) (WARM)
SY 125,472.000 $0.120 $0.060 $0.070 $0.060 $0.150 $0.060
DRILL SEED (TEMP)(WARM OR COOL)
SY 376,416.000 $0.100 $0.060 $0.070 $0.060 $0.150 $0.060
FERTILIZER
AC 203.000 $650.000 $602.430 $635.000 $602.430 $790.000 $630.800
VEGETATIVE WATERING
MG 24,365.000 $14.000 $10.380 $26.000 $18.000 $10.000 $16.000
LIME TRT (EXST MATL) (6")
SY 44,563.000 $2.500 $2.500 $3.900 $2.750 $2.000 $2.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 602.000 $150.000 $179.620 $195.000 $185.000 $175.000 $170.000
CEMENT
TON 4,572.000 $150.000 $146.800 $134.000 $155.000 $125.000 $130.000
CEMENT TREAT (EXIST MATL) (6")
SY 338,645.000 $2.500 $1.130 $2.900 $1.800 $2.000 $2.000
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 375,993.000 $7.000 $8.930 $10.000 $10.500 $7.500 $11.260
ASPHALT STAB BASE (GR 2)(PG 64)
TON 4,703.000 $90.000 $111.920 $90.000 $88.650 $75.000 $93.300
ASPHALT STAB BASE (GR 4)(PG 64)
TON 24,488.000 $72.000 $111.920 $90.000 $88.650 $85.000 $93.060
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 216,221.000 $2.500 $2.400 $2.800 $1.400 $2.000 $1.870
D-GR HMA(SQ) TY-D SAC-A PG64-22
TON 1,764.000 $90.000 $155.170 $106.000 $105.270 $110.000 $110.700
D-GR HMA(SQ) TY-D PG64-22
TON 1,162.000 $125.000 $155.170 $101.000 $99.730 $105.000 $104.740
CONC PVMT (CONT REINF - CRCP) (10")
SY 355,678.000 $55.000 $52.000 $45.000 $42.300 $40.000 $53.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 43,092.000 $90.000 $98.000 $70.000 $75.000 $80.000 $93.000
CEM STABIL BKFL
CY 14,903.000 $50.000 $47.760 $31.000 $40.000 $45.000 $45.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 344.000 $40.000 $46.120 $46.000 $40.000 $45.000 $45.000
TRENCH EXCAVATION PROTECTION
LF 3,203.000 $2.500 $2.380 $0.400 $1.000 $1.000 $5.000
TEMPORARY SPL SHORING
SF 76.000 $12.000 $93.220 $200.000 $20.000 $5.000 $30.000
DRILL SHAFT (18 IN)
LF 542.000 $82.000 $46.900 $65.000 $65.000 $65.000 $45.000
DRILL SHAFT (36 IN)
LF 2,081.000 $150.000 $165.070 $203.000 $240.000 $200.000 $400.000
DRILL SHAFT (42 IN)
LF 3,875.000 $200.000 $225.250 $276.000 $325.000 $300.000 $239.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 28.000 $329.150 $238.000 $175.000 $185.040 $172.090 $180.190
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 132.000 $400.000 $343.700 $310.000 $330.280 $307.160 $321.620
CL C CONC (ABUT)
CY 143.100 $800.000 $600.000 $982.000 $850.000 $950.000 $1,000.000
CL C CONC (ABUT)(EXTEND)
CY 161.500 $850.000 $800.000 $1,285.000 $950.000 $1,500.000 $1,100.000
CL C CONC (CAP)
CY 425.900 $900.000 $650.000 $980.000 $1,075.000 $1,400.000 $950.000
CL C CONC (COLUMN)
CY 263.300 $800.000 $575.000 $1,090.000 $1,000.000 $1,200.000 $950.000
CL C CONC (CRASHWALL)
CY 135.600 $705.000 $500.000 $945.000 $1,150.000 $775.000 $600.000
REINF CONC SLAB
SF 55,128.000 $13.000 $15.000 $18.000 $13.000 $20.000 $15.000
REINF CONC SLAB (EXTEND SLAB)
SF 30,603.000 $22.000 $17.000 $21.000 $20.000 $30.000 $16.000
BRIDGE MEDIAN
SF 15,796.000 $14.000 $10.000 $5.400 $8.000 $9.250 $6.500
APPROACH SLAB
CY 353.000 $500.000 $425.000 $520.000 $650.000 $725.000 $525.000
PRESTR CONC GIRDER (TX34)
LF 3,520.140 $110.000 $138.000 $140.000 $155.000 $200.000 $118.000
PRESTR CONC GIRDER (TX40)
LF 6,772.570 $115.000 $138.000 $148.000 $170.000 $200.000 $120.000
RIPRAP (CONC)(4 IN)
CY 370.000 $320.000 $382.980 $365.000 $433.600 $440.000 $450.000
RIPRAP (CONC)(5 IN)
CY 445.000 $400.000 $382.980 $400.000 $379.820 $340.000 $450.000
RIPRAP (CONC)(6 IN)
CY 123.000 $420.000 $481.690 $386.000 $383.900 $350.000 $400.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 546.000 $490.000 $363.530 $346.000 $461.500 $410.000 $450.000
RIPRAP (MOW STRIP)(4 IN)
CY 807.000 $455.000 $478.720 $405.000 $416.580 $355.000 $500.000
STR STEEL (MISC NON - BRIDGE)
LB 819.000 $4.810 $9.610 $2.400 $10.000 $15.000 $11.000
RAIL (TY T223)
LF 1,225.100 $100.000 $51.070 $105.000 $85.000 $135.000 $110.000
RAIL (TY SSTR)
LF 628.200 $45.250 $47.820 $55.000 $65.000 $105.000 $100.000
RAIL (TY C223)
LF 1,265.700 $125.000 $90.190 $145.000 $105.000 $230.000 $130.000
RAIL (TY PR11)
LF 1,251.700 $100.000 $78.000 $65.000 $75.000 $78.000 $70.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 746.000 $90.000 $80.740 $96.000 $120.000 $110.000 $70.000
CMP (GAL STL 24 IN)
LF 100.000 $75.000 $74.690 $72.000 $75.000 $70.000 $59.280
CONC BOX CULV (3 FT X 2 FT)
LF 235.000 $150.000 $285.000 $250.000 $280.000 $300.000 $270.000
CONC BOX CULV (4 FT X 2 FT)
LF 6,119.000 $150.000 $279.000 $250.000 $315.000 $340.000 $290.000
CONC BOX CULV (4 FT X 3 FT)
LF 194.000 $220.000 $314.000 $290.000 $375.000 $370.000 $320.000
CONC BOX CULV (4 FT X 4 FT)
LF 463.000 $230.000 $355.000 $320.000 $425.000 $410.000 $375.000
CONC BOX CULV (6 FT X 3 FT)
LF 959.000 $275.000 $475.000 $440.000 $600.000 $545.000 $500.000
CONC BOX CULV (6 FT X 4 FT)
LF 1,376.000 $280.000 $515.000 $505.000 $625.000 $625.000 $600.000
CONC BOX CULV (7 FT X 6 FT)
LF 138.000 $450.000 $745.000 $745.000 $950.000 $860.000 $800.000
CONC BOX CULV (8 FT X 4 FT)
LF 342.000 $400.000 $700.000 $615.000 $900.000 $800.000 $780.000
CONC BOX CULV (10 FT X 6 FT)
LF 375.000 $650.000 $1,115.000 $1,025.000 $1,200.000 $1,250.000 $1,200.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 8.000 $570.000 $1,200.000 $1,110.000 $1,100.000 $850.000 $600.000
RC PIPE (CL III)(18 IN)
LF 2,042.000 $60.000 $64.000 $57.000 $80.000 $95.000 $75.000
RC PIPE (CL III)(24 IN)
LF 8,553.000 $70.000 $79.000 $57.000 $90.000 $110.000 $90.000
RC PIPE (CL III)(30 IN)
LF 596.000 $94.000 $126.000 $96.000 $100.000 $175.000 $115.000
RC PIPE (CL III)(36 IN)
LF 1,730.000 $100.000 $129.000 $127.000 $150.000 $175.000 $150.000
RC PIPE (CL III)(42 IN)
LF 607.000 $140.000 $167.000 $160.000 $185.000 $215.000 $195.000
RC PIPE (CL III)(48 IN)
LF 79.000 $170.000 $212.000 $195.000 $240.000 $275.000 $210.000
INLET (COMPL)(TY AD)
EA 18.000 $3,400.000 $3,500.000 $3,300.000 $4,984.620 $3,700.000 $3,300.000
MANH (COMPL)(TY A)
EA 6.000 $4,000.000 $3,300.000 $3,400.000 $4,720.560 $5,175.000 $7,000.000
INLET (COMPL)(CURB)(TY C)
EA 5.000 $4,000.000 $3,800.000 $4,700.000 $5,421.290 $5,300.000 $3,700.000
JCT BOX (COMPL)(SPL)
EA 9.000 $23,800.000 $18,500.000 $21,500.000 $29,005.290 $22,800.000 $15,000.000
INLET (TOP) (TY AD)
EA 5.000 $1,500.000 $1,600.000 $960.000 $1,490.810 $2,600.000 $2,900.000
INLET (COMPL)(EXT TY C)
EA 4.000 $1,400.000 $1,100.000 $1,200.000 $3,175.060 $940.000 $1,900.000
MANH (COMPL)(TY M)
EA 3.000 $2,600.000 $6,400.000 $6,600.000 $8,329.590 $8,900.000 $6,100.000
MANH (COMPL)(RISER ONLY)
EA 7.000 $1,900.000 $1,300.000 $1,050.000 $1,729.940 $1,320.000 $1,800.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $6,500.000 $8,448.540 $14,800.000 $12,635.540 $18,500.000 $24,000.000
WINGWALL (FW - 0) (HW=3 FT)
EA 5.000 $6,250.000 $5,500.000 $7,500.000 $6,618.500 $16,400.000 $4,700.000
WINGWALL (FW - 0) (HW=4 FT)
EA 3.000 $7,000.000 $5,800.000 $9,800.000 $9,669.180 $13,350.000 $7,200.000
WINGWALL (FW - 0) (HW=5 FT)
EA 5.000 $9,000.000 $10,000.000 $15,500.000 $13,446.660 $19,000.000 $13,000.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $11,800.000 $16,500.000 $15,800.000 $15,920.620 $28,250.000 $17,000.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $13,700.000 $16,500.000 $20,500.000 $15,492.510 $30,750.000 $18,000.000
WINGWALL (FW - 0) (HW=8 FT)
EA 1.000 $13,700.000 $22,500.000 $24,000.000 $21,312.540 $39,250.000 $24,000.000
WINGWALL (FW - 0) (HW=9 FT)
EA 1.000 $14,000.000 $28,000.000 $30,000.000 $30,039.770 $51,000.000 $30,000.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $9,800.000 $10,750.000 $11,600.000 $14,001.610 $21,150.000 $9,500.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $17,000.000 $22,500.000 $20,000.000 $20,201.580 $59,400.000 $20,000.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $25,000.000 $40,000.000 $32,000.000 $27,226.090 $62,150.000 $37,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 6.000 $4,000.000 $4,957.430 $5,000.000 $6,653.490 $5,350.000 $4,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (P)
EA 2.000 $4,000.000 $4,403.960 $6,200.000 $7,120.160 $5,750.000 $3,600.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 13.000 $4,000.000 $5,629.930 $6,300.000 $7,850.010 $6,350.000 $5,200.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (P)
EA 4.000 $7,600.000 $7,212.990 $8,100.000 $10,069.120 $8,210.000 $6,800.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 8.000 $9,500.000 $8,926.970 $10,000.000 $11,697.490 $10,235.000 $7,700.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 8.000 $700.000 $994.460 $1,020.000 $1,132.780 $885.000 $700.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 18.000 $700.000 $1,066.000 $1,010.000 $1,200.570 $950.000 $800.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 30.000 $700.000 $1,274.290 $995.000 $1,255.920 $1,225.000 $900.000
SET (TY II) (24 IN) (CMP) (4: 1) (P)
EA 1.000 $1,125.000 $875.350 $2,000.000 $1,569.840 $725.000 $1,100.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 7.000 $900.000 $1,238.720 $1,250.000 $1,237.620 $985.000 $900.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 20.000 $1,000.000 $1,375.420 $1,150.000 $1,421.910 $1,140.000 $1,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 111.000 $1,000.000 $1,750.400 $1,400.000 $1,532.670 $1,425.000 $1,200.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,450.000 $2,209.640 $2,100.000 $1,698.990 $1,675.000 $1,200.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,500.000 $3,119.460 $2,600.000 $2,885.940 $2,875.000 $1,650.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 9.000 $2,500.000 $2,714.520 $2,500.000 $2,510.520 $2,575.000 $2,350.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $3,500.000 $4,285.200 $4,400.000 $3,979.840 $3,925.000 $3,350.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 1.000 $5,227.000 $7,417.070 $8,300.000 $8,434.090 $8,000.000 $5,150.000
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 1.000 $4,500.000 $4,643.740 $6,400.000 $6,318.470 $6,100.000 $3,600.000
SET (REMOV & REINSTALL)
EA 38.000 $450.000 $1,281.570 $885.000 $850.000 $100.000 $900.000
REMOV & RE - LAY PIPE (18 IN)
LF 274.000 $40.000 $78.390 $34.000 $85.000 $10.000 $40.000
REMOV & RE - LAY PIPE (24 IN)
LF 453.000 $50.000 $78.390 $84.000 $88.000 $10.000 $45.000
REMOV & RE - LAY PIPE (48 IN)
LF 89.000 $75.000 $87.120 $185.000 $100.000 $10.000 $85.000
REMOV STR (SET)
EA 192.000 $400.000 $325.020 $210.000 $649.860 $375.000 $350.000
REMOV STR (WINGWALL)
EA 11.000 $2,000.000 $2,252.400 $2,200.000 $1,200.000 $5,750.000 $600.000
REMOV STR (PIPE)
LF 4,768.000 $20.000 $21.530 $15.500 $15.000 $45.000 $16.000
REMOV STR (BOX CULVERT)
LF 345.000 $40.000 $49.930 $72.000 $65.000 $75.000 $40.000
MOBILIZATION
LS 1.000 $4,000,000.000 $4,187,000.000 $6,000,000.000 $7,019,964.610 $7,000,000.000 $7,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 38.000 $10,000.000 $6,600.000 $19,000.000 $5,000.000 $64,500.000 $11,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,920.000 $35.000 $28.380 $34.500 $28.380 $30.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 3,920.000 $10.000 $6.940 $8.500 $6.940 $5.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 5,900.000 $30.000 $24.980 $30.000 $24.980 $30.000 $28.000
CONSTRUCTION EXITS (REMOVE)
SY 5,900.000 $10.000 $7.560 $9.100 $7.560 $7.500 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 86,438.000 $3.000 $1.560 $1.900 $1.560 $2.000 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 86,438.000 $1.000 $0.380 $0.460 $0.380 $0.400 $0.400
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 200.000 $5.000 $4.690 $5.700 $4.690 $8.000 $4.910
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $0.800 $0.420 $0.510 $0.420 $5.000 $0.250
CONSTRUCTING DETOURS
SY 3,061.000 $60.000 $104.500 $110.000 $83.560 $75.000 $85.450
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 3,360.000 $35.000 $84.360 $39.000 $108.570 $40.000 $81.160
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 11,040.000 $35.000 $60.680 $43.000 $96.230 $75.000 $88.010
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 760.000 $40.000 $63.990 $73.000 $95.830 $75.000 $82.210
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,030.000 $4.000 $3.430 $5.600 $7.120 $10.000 $3.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 24,170.000 $5.000 $3.250 $3.500 $5.350 $4.250 $4.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 2,020.000 $5.500 $3.550 $13.100 $16.220 $4.250 $4.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 3,360.000 $6.000 $11.180 $7.300 $14.000 $5.000 $8.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 11,040.000 $6.000 $8.180 $8.250 $10.380 $8.500 $8.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 760.000 $6.000 $8.180 $11.500 $17.920 $8.500 $8.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,250.000 $50.000 $56.270 $68.000 $88.670 $80.000 $81.970
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 250.000 $80.000 $224.420 $205.000 $292.780 $165.000 $338.190
CONC CURB (MONO) (TY II)
LF 4,016.000 $5.000 $2.840 $1.650 $5.110 $7.000 $3.000
CONC CURB (DOWEL)
LF 4,727.000 $7.000 $16.770 $7.000 $7.140 $8.000 $6.500
DRIVEWAYS (CONC)
SY 3,258.000 $70.000 $50.820 $53.000 $72.490 $70.000 $68.000
DRIVEWAYS (ACP)
SY 243.000 $30.000 $112.220 $98.000 $33.240 $70.000 $120.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 6,004.000 $80.000 $85.990 $73.000 $70.450 $80.000 $70.000
CONC SIDEWALKS (4")
SY 10,858.000 $55.000 $39.110 $40.000 $55.130 $50.000 $51.000
CURB RAMPS (TY 1)
EA 14.000 $1,700.000 $1,993.990 $1,200.000 $1,662.220 $1,475.000 $2,100.000
CURB RAMPS (TY 7)
EA 8.000 $1,500.000 $1,991.420 $1,130.000 $1,742.880 $1,550.000 $2,000.000
CURB RAMPS (TY 20)
EA 4.000 $2,100.000 $4,232.510 $1,800.000 $3,283.590 $2,900.000 $2,400.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,869.000 $20.000 $18.000 $18.900 $18.000 $18.000 $18.850
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 19.000 $1,800.000 $1,585.000 $1,670.000 $1,585.000 $1,585.000 $1,659.640
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 23.000 $1,150.000 $1,155.000 $1,250.000 $1,155.000 $1,155.000 $1,209.390
REMOVE METAL BEAM GUARD FENCE
LF 3,199.000 $4.000 $8.700 $1.100 $1.000 $1.000 $1.050
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $277.000 $250.000 $265.000 $250.000 $250.000 $261.770
GUARDRAIL END TREATMENT (INSTALL)
EA 34.000 $2,575.000 $2,485.000 $2,610.000 $2,485.000 $2,485.000 $2,602.020
GUARDRAIL END TREATMENT (REMOVE)
EA 44.000 $240.000 $150.000 $159.000 $150.000 $150.000 $157.060
CRASH CUSH ATTEN (MOVE & RESET)
EA 20.000 $1,500.000 $3,550.000 $4,300.000 $3,550.000 $3,550.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 8.000 $1,100.000 $750.000 $900.000 $750.000 $750.000 $750.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 8.000 $25,000.000 $23,445.000 $28,500.000 $23,445.000 $23,325.000 $30,000.000
REMOVE RD IL ASM (TRANS-BASE)
EA 2.000 $500.000 $350.400 $615.000 $657.950 $611.890 $640.710
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 60,445.000 $8.100 $11.000 $7.800 $8.370 $7.790 $8.150
CONDT (PVC) (SCH 80) (2")
LF 1,830.000 $7.830 $6.680 $6.300 $6.680 $6.220 $6.500
CONDT (PVC) (SCH 80) (3")
LF 1,565.000 $13.390 $7.730 $8.200 $8.760 $8.150 $8.530
CONDT (PVC) (SCH 80) (3") (BORE)
LF 12,855.000 $21.000 $10.470 $8.200 $8.770 $8.160 $8.540
CONDT (RM) (2")
LF 290.000 $25.000 $15.480 $24.000 $25.550 $2.760 $24.880
CONDT (RM) (3")
LF 3,160.000 $40.630 $45.250 $44.000 $46.990 $43.710 $45.760
ELEC CONDR (NO.14) INSULATED
LF 76,170.000 $0.800 $0.600 $0.420 $0.430 $0.400 $0.410
ELEC CONDR (NO.6) BARE
LF 3,305.000 $1.340 $1.030 $0.870 $0.920 $0.850 $0.890
ELEC CONDR (NO.4) BARE
LF 85.000 $1.740 $1.140 $1.650 $1.760 $1.640 $1.720
ELEC CONDR (NO.4) INSULATED
LF 170.000 $1.970 $1.480 $1.800 $1.880 $1.750 $1.830
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,925.000 $2.110 $1.600 $1.900 $2.000 $1.860 $1.950
GROUND BOX TY D (162922)W/APRON
EA 20.000 $900.000 $1,206.430 $765.000 $820.770 $763.320 $799.260
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 2.000 $4,747.360 $3,885.540 $5,000.000 $5,286.470 $4,916.430 $5,147.950
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 48.000 $450.000 $341.000 $345.000 $341.000 $341.000 $357.060
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 138.000 $590.000 $393.000 $395.000 $393.000 $393.000 $411.510
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 5.000 $600.000 $521.000 $525.000 $521.000 $521.000 $545.530
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $2,050.000 $3,010.000 $1,550.000 $1,635.350 $2,826.370 $1,602.050
REMOVE SM RD SN SUP&AM
EA 90.000 $80.000 $50.000 $51.000 $50.000 $50.000 $52.350
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 125.000 $40.000 $15.000 $15.500 $15.000 $15.000 $15.710
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 96.000 $20.000 $15.000 $15.500 $15.000 $15.000 $15.710
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 26.000 $80.000 $42.000 $43.000 $42.000 $42.000 $43.980
INSTL OM ASSM (OM-3L)(FLX)GND
EA 8.000 $200.000 $250.000 $255.000 $250.000 $250.000 $261.770
INSTL OM ASSM (OM-3R)(FLX)GND
EA 28.000 $208.540 $250.000 $255.000 $250.000 $250.000 $261.770
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 513.000 $3.000 $4.000 $4.800 $4.060 $4.000 $4.190
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 264.000 $0.750 $4.000 $4.800 $4.060 $4.000 $4.190
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 3,421.000 $0.750 $0.850 $1.020 $0.860 $0.850 $0.890
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 600.000 $0.600 $3.000 $3.600 $3.040 $3.000 $3.140
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 130,525.000 $0.600 $0.800 $0.960 $0.810 $0.800 $0.840
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 9,802.000 $1.200 $1.300 $1.560 $1.320 $1.300 $1.360
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,157.000 $7.500 $6.000 $7.200 $6.090 $6.000 $6.280
WK ZN PAV MRK REMOV (W)(ARROW)
EA 164.000 $100.000 $185.000 $222.000 $187.690 $185.000 $193.710
WK ZN PAV MRK REMOV (W)(WORD)
EA 64.000 $125.000 $275.000 $330.000 $279.000 $275.000 $287.950
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 16,043.000 $0.500 $0.850 $1.020 $0.860 $0.850 $0.890
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 586.000 $0.500 $3.000 $3.600 $3.040 $3.000 $3.140
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 127,250.000 $0.500 $0.800 $0.960 $0.810 $0.800 $0.840
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 7.000 $75.000 $125.000 $127.000 $126.820 $125.000 $130.890
REFL PAV MRK TY II (W) 36" (YLD TRI)
EA 569.000 $22.000 $25.000 $26.000 $25.360 $25.000 $26.180
PREFAB PAV MRK TY C (W) (ARROW)
EA 107.000 $200.000 $195.000 $197.000 $197.830 $195.000 $204.180
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $290.000 $400.000 $410.000 $405.820 $400.000 $418.840
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 4.000 $350.000 $400.000 $410.000 $405.820 $400.000 $418.840
PREFAB PAV MRK TY C (W) (WORD)
EA 114.000 $300.000 $250.000 $255.000 $253.630 $250.000 $261.770
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 100.000 $10.000 $18.000 $18.500 $18.260 $18.000 $18.850
REFL PAV MRKR TY I-C
EA 1,283.000 $3.000 $4.000 $4.100 $4.060 $4.000 $4.190
REFL PAV MRKR TY II-A-A
EA 134.000 $3.000 $4.500 $4.600 $4.570 $4.500 $4.710
REFL PAV MRKR TY II-C-R
EA 983.000 $3.000 $4.000 $4.100 $4.060 $4.000 $4.190
ELIM EXT PAV MRK & MRKS (4")
LF 9,731.000 $0.400 $0.350 $0.360 $0.360 $0.350 $0.370
ELIM EXT PAV MRK & MRKS (8")
LF 6,687.000 $0.600 $0.700 $0.720 $0.710 $0.700 $0.730
ELIM EXT PAV MRK & MRKS (24")
LF 48.000 $2.000 $2.000 $2.100 $2.030 $2.000 $2.090
ELIM EXT PAV MRK & MRKS (ARROW)
EA 6.000 $50.000 $35.000 $37.000 $35.510 $35.000 $36.650
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $50.000 $40.000 $42.000 $40.580 $40.000 $41.880
PAV SURF PREP FOR MRK (4")
LF 9,444.000 $0.300 $0.040 $0.050 $0.040 $0.040 $0.040
PAV SURF PREP FOR MRK (6")
LF 196,180.000 $0.030 $0.060 $0.070 $0.060 $0.060 $0.060
PAV SURF PREP FOR MRK (8")
LF 26,493.000 $0.100 $0.080 $0.090 $0.080 $0.080 $0.080
PAV SURF PREP FOR MRK (12")
LF 1,500.000 $0.150 $0.120 $0.130 $0.120 $0.120 $0.130
PAV SURF PREP FOR MRK (24")
LF 787.000 $0.750 $0.240 $0.250 $0.240 $0.240 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 107.000 $10.000 $5.000 $5.100 $5.070 $5.000 $5.240
PAV SURF PREP FOR MRK (DBL ARROW)
EA 4.000 $10.000 $10.000 $10.500 $10.150 $10.000 $10.470
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $20.000 $10.000 $10.500 $10.150 $10.000 $10.470
PAV SURF PREP FOR MRK (WORD)
EA 114.000 $15.000 $10.000 $10.500 $10.150 $10.000 $10.470
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 569.000 $8.000 $1.000 $1.100 $1.010 $1.000 $1.050
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $31,800.000 $34,800.930 $25,500.000 $27,247.480 $25,340.200 $26,533.510
REMOVING TRAFFIC SIGNALS
EA 2.000 $3,893.190 $2,190.000 $5,100.000 $5,409.340 $5,030.700 $5,267.600
TEMP TRAF SIGNALS
EA 2.000 $44,595.040 $67,951.170 $41,500.000 $44,125.790 $41,037.060 $42,969.560
VEH SIG SEC (12")LED(GRN)
EA 17.000 $221.550 $159.900 $202.000 $216.680 $201.520 $211.010
VEH SIG SEC (12")LED(GRN ARW)
EA 11.000 $231.940 $159.900 $202.000 $216.680 $201.520 $211.010
VEH SIG SEC (12")LED(YEL)
EA 17.000 $222.000 $159.900 $202.000 $219.910 $201.520 $211.010
VEH SIG SEC (12")LED(YEL ARW)
EA 11.000 $222.260 $159.900 $202.000 $216.680 $201.520 $211.010
VEH SIG SEC (12")LED(RED)
EA 21.000 $220.500 $159.900 $202.000 $216.680 $201.520 $211.010
VEH SIG SEC (12")LED(RED ARW)
EA 10.000 $226.460 $159.900 $202.000 $216.680 $201.520 $211.010
PED SIG SEC (LED)(COUNTDOWN)
EA 24.000 $430.000 $409.200 $560.000 $597.390 $555.580 $581.740
BACK PLATE (12")(3 SEC)
EA 22.000 $77.110 $74.700 $105.000 $111.790 $103.970 $108.860
BACK PLATE (12")(4 SEC)
EA 4.000 $93.510 $85.500 $107.000 $114.470 $106.460 $111.470
BACK PLATE (12")(5 SEC)
EA 1.000 $95.520 $98.700 $125.000 $133.240 $123.910 $129.750
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 4,050.000 $1.620 $1.120 $0.950 $1.000 $0.940 $0.980
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 4,175.000 $1.850 $1.200 $1.500 $1.550 $1.440 $1.510
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 5,095.000 $2.290 $1.800 $2.400 $2.500 $3.330 $2.430
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $7,500.000 $9,139.200 $11,500.000 $11,844.400 $11,015.310 $11,534.040
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $19,848.370 $19,707.600 $21,500.000 $22,802.580 $21,206.440 $22,205.080
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 1.000 $20,846.190 $20,679.600 $23,000.000 $24,375.520 $22,669.280 $23,736.810
INS TRF SIG PL AM(S)1 ARM(65')
EA 2.000 $21,456.310 $19,664.400 $22,000.000 $23,388.000 $21,750.880 $22,775.170
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 1.000 $22,161.000 $21,369.600 $24,000.000 $25,340.910 $23,567.090 $24,676.910
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
EA 1.000 $23,104.000 $24,309.600 $27,500.000 $29,111.810 $27,074.030 $28,348.990
PED POLE ASSEMBLY
EA 13.000 $1,855.800 $1,967.280 $1,080.000 $1,157.150 $1,076.150 $1,126.820
PED DETECT PUSH BUTTON (APS)
EA 21.000 $785.970 $597.600 $605.000 $647.790 $602.450 $630.820
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,021.280 $3,547.200 $2,780.000 $2,980.180 $2,771.580 $2,902.100
FULL - WIDTH MOWING
CYC 9.000 $1,900.000 $2,772.540 $6,600.000 $1,900.000 $3,575.000 $4,000.000
LITTER REMOVAL
CYC 9.000 $1,100.000 $1,117.010 $5,100.000 $1,100.000 $3,150.000 $4,000.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 9.000 $2,300.000 $1,924.580 $15,000.000 $2,300.000 $2,500.000 $1,250.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 9.000 $1,500.000 $1,249.300 $1,860.000 $1,500.000 $2,500.000 $3,500.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 530.000 $2.000 $3.150 $9.000 $1,415.830 $50.000 $31.000
WIDE FLANGE PAVEMENT TERMINALS
LF 328.000 $260.000 $425.000 $420.000 $395.150 $550.000 $550.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 6,000.000 $30.000 $11.900 $13.500 $3.940 $10.000 $20.000
VIVDS PROCESSOR SYSTEM
EA 2.000 $8,000.000 $8,217.600 $4,650.000 $4,979.940 $4,631.350 $4,849.450
VIVDS CAMERA ASSEMBLY
EA 13.000 $1,714.290 $1,145.450 $1,570.000 $1,680.360 $1,562.740 $1,636.330
VIVDS SET-UP SYSTEM
EA 2.000 $568.430 $582.000 $345.000 $368.080 $342.320 $358.440
VIVDS COMMUNICATION CABLE (COAXIAL)
LF 4,810.000 $3.100 $1.620 $1.900 $1.970 $1.830 $1.920
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 60,445.000 $12.000 $13.000 $11.500 $12.210 $11.360 $11.890
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 12,855.000 $35.000 $35.000 $15.000 $15.990 $14.870 $15.570
ITS MULTI-DUCT CND (RMC)
LF 2,870.000 $66.000 $69.500 $78.000 $83.460 $77.620 $81.270
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 82,417.000 $0.600 $0.750 $0.770 $0.760 $0.750 $0.790
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 19,044.000 $0.600 $0.800 $0.820 $0.810 $0.850 $0.840
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 26,493.000 $1.000 $1.300 $1.400 $1.320 $1.300 $1.360
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,500.000 $2.500 $3.000 $3.200 $3.040 $3.000 $3.140
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 687.000 $7.500 $6.000 $6.100 $6.090 $6.000 $6.280
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
LF 9,444.000 $0.500 $0.800 $0.820 $0.810 $0.800 $0.840
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 75,678.000 $0.600 $0.900 $0.920 $0.910 $0.900 $0.940
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 1,064.000 $6.000 $6.000 $6.200 $6.090 $6.000 $6.280
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 19,041.000 $0.600 $0.800 $0.850 $0.810 $0.800 $0.840
TMA (STATIONARY)
DAY 100.000 $300.000 $400.000 $165.000 $300.000 $175.000 $550.000
TMA (MOBILE OPERATION)
DAY 100.000 $320.000 $424.140 $165.000 $300.000 $350.000 $900.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 220.000 $2,900.000 $2,875.200 $3,150.000 $3,348.930 $3,114.510 $3,261.170
Totals: $66,032,352.640 $65,322,056.954 $65,332,897.330 $70,199,646.130 $71,166,051.500 $78,151,490.390