PREPARING ROW
|
STA
|
116.000
|
$2,000.000
|
$4,000.000
|
$2,000.000
|
$26,328.000
|
$4,400.000
|
$5,000.000
|
$2,809.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
440.000
|
$19.710
|
$2.700
|
$8.300
|
$12.300
|
$10.000
|
$10.000
|
$29.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,899.000
|
$14.950
|
$6.500
|
$8.300
|
$10.200
|
$8.000
|
$9.000
|
$14.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
8,973.000
|
$18.920
|
$1.750
|
$3.100
|
$4.100
|
$3.000
|
$5.000
|
$3.000
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
69.000
|
$383.000
|
$110.000
|
$78.000
|
$321.220
|
$150.000
|
$400.000
|
$213.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(6"-9")
|
SY
|
37,710.000
|
$9.000
|
$3.650
|
$8.500
|
$4.230
|
$4.000
|
$5.750
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
23,077.000
|
$3.000
|
$24.000
|
$7.200
|
$6.070
|
$14.000
|
$25.000
|
$17.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
13,972.000
|
$9.000
|
$25.000
|
$10.200
|
$8.530
|
$5.000
|
$27.000
|
$24.000
|
|
|
BLOCK SODDING
|
SY
|
73,197.000
|
$8.480
|
$4.250
|
$4.400
|
$4.500
|
$5.000
|
$6.000
|
$4.500
|
|
|
FERTILIZER
|
AC
|
15.330
|
$4,500.000
|
$785.000
|
$1,040.000
|
$750.000
|
$800.000
|
$1,000.000
|
$959.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,839.000
|
$132.350
|
$37.000
|
$36.400
|
$30.000
|
$20.000
|
$40.000
|
$55.000
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
19,296.000
|
$8.150
|
$4.500
|
$4.300
|
$4.720
|
$4.000
|
$12.000
|
$15.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
261.000
|
$350.000
|
$335.000
|
$354.100
|
$355.920
|
$360.000
|
$400.000
|
$331.000
|
|
|
CEMENT
|
TON
|
261.000
|
$250.000
|
$215.000
|
$218.400
|
$224.180
|
$286.000
|
$300.000
|
$375.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
19,296.000
|
$3.000
|
$5.500
|
$4.300
|
$2.600
|
$4.000
|
$5.000
|
$4.300
|
|
|
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
|
SY
|
38,593.000
|
$25.000
|
$32.000
|
$17.400
|
$14.000
|
$18.000
|
$20.000
|
$26.000
|
|
|
ASPHALT STAB BASE (GR 4)(PG 64)
|
TON
|
2,073.000
|
$110.000
|
$159.000
|
$118.800
|
$167.650
|
$140.000
|
$165.000
|
$152.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
|
SY
|
4,921.000
|
$5.000
|
$7.200
|
$9.300
|
$7.170
|
$5.000
|
$5.000
|
$10.100
|
|
|
SLV, HAUL & STKPL RCL APH PV (6 TO 12")
|
SY
|
37,710.000
|
$5.000
|
$8.300
|
$7.200
|
$7.070
|
$5.000
|
$8.000
|
$16.600
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
37,697.000
|
$60.000
|
$70.000
|
$86.500
|
$90.000
|
$84.000
|
$94.000
|
$85.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(13")
|
SY
|
13,967.000
|
$125.000
|
$110.000
|
$114.400
|
$132.390
|
$122.000
|
$140.000
|
$119.000
|
|
|
CEM STABIL BKFL
|
CY
|
17,062.000
|
$60.000
|
$53.500
|
$60.300
|
$51.000
|
$55.000
|
$80.000
|
$91.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
6.000
|
$200.000
|
$950.000
|
$243.900
|
$401.310
|
$500.000
|
$300.000
|
$1,066.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
66.000
|
$78.000
|
$225.000
|
$202.400
|
$146.150
|
$250.000
|
$200.000
|
$434.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
905.000
|
$57.000
|
$45.000
|
$60.300
|
$50.220
|
$55.000
|
$75.000
|
$50.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
16,442.000
|
$35.000
|
$1.000
|
$1.000
|
$1.060
|
$1.000
|
$5.000
|
$5.100
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,200.000
|
$20.000
|
$30.000
|
$25.000
|
$40.560
|
$10.000
|
$18.000
|
$21.400
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
974.000
|
$91.000
|
$83.000
|
$187.900
|
$42.730
|
$110.000
|
$90.000
|
$255.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
138.000
|
$650.000
|
$280.000
|
$407.300
|
$513.410
|
$450.000
|
$525.000
|
$1,394.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
2,615.000
|
$450.000
|
$300.000
|
$521.100
|
$326.060
|
$450.000
|
$550.000
|
$964.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
31.000
|
$328.000
|
$325.000
|
$390.400
|
$404.050
|
$366.000
|
$405.000
|
$18,200.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
1,468.000
|
$333.000
|
$350.000
|
$312.600
|
$304.580
|
$400.000
|
$415.000
|
$405.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
120.000
|
$385.000
|
$385.000
|
$371.300
|
$376.110
|
$505.000
|
$440.000
|
$414.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
70.000
|
$486.000
|
$410.000
|
$397.900
|
$378.620
|
$510.000
|
$475.000
|
$469.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
2,455.000
|
$380.000
|
$430.000
|
$390.100
|
$358.240
|
$475.000
|
$500.000
|
$510.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
6,648.000
|
$600.000
|
$570.000
|
$537.800
|
$473.370
|
$622.000
|
$650.000
|
$619.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
112.000
|
$754.000
|
$790.000
|
$939.700
|
$659.280
|
$1,000.000
|
$900.000
|
$846.000
|
|
|
CONC BOX CULV (12 FT X 6 FT)
|
LF
|
1,436.000
|
$1,100.000
|
$1,545.000
|
$1,459.400
|
$1,302.110
|
$1,600.000
|
$1,950.000
|
$1,570.000
|
|
|
CONC BOX CULV (12 FT X 5 FT)
|
LF
|
4,050.000
|
$1,000.000
|
$1,480.000
|
$1,386.900
|
$1,252.370
|
$1,580.000
|
$1,700.000
|
$1,456.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
733.000
|
$86.000
|
$80.000
|
$100.800
|
$66.200
|
$72.000
|
$125.000
|
$155.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
207.000
|
$98.000
|
$95.000
|
$138.600
|
$203.810
|
$130.000
|
$150.000
|
$178.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
12.000
|
$11,898.000
|
$4,600.000
|
$6,328.100
|
$5,106.440
|
$6,000.000
|
$8,500.000
|
$4,472.000
|
|
|
MANH (COMPL)(TY A)
|
EA
|
1.000
|
$9,762.000
|
$5,300.000
|
$6,795.300
|
$4,892.980
|
$5,700.000
|
$15,000.000
|
$4,946.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
3.000
|
$53,000.000
|
$58,000.000
|
$104,633.200
|
$65,501.020
|
$90,000.000
|
$57,000.000
|
$59,666.000
|
|
|
INLET (STAGE II)(TY AD) (SPECIAL)
|
EA
|
53.000
|
$3,100.000
|
$4,450.000
|
$4,155.000
|
$3,831.520
|
$4,500.000
|
$5,000.000
|
$3,235.000
|
|
|
MANHOLE (COMPL)(SPECIAL)
|
EA
|
6.000
|
$15,000.000
|
$6,650.000
|
$7,129.600
|
$5,637.670
|
$6,000.000
|
$9,000.000
|
$1,957.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
2.000
|
$10,538.000
|
$11,300.000
|
$6,419.600
|
$6,516.280
|
$12,000.000
|
$9,500.000
|
$18,513.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
1.000
|
$22,900.000
|
$16,000.000
|
$40,466.400
|
$10,725.230
|
$15,000.000
|
$20,000.000
|
$26,112.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$16,232.000
|
$16,000.000
|
$32,321.800
|
$11,314.600
|
$20,000.000
|
$20,000.000
|
$26,620.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$66,772.000
|
$32,700.000
|
$38,833.000
|
$28,070.420
|
$30,000.000
|
$40,000.000
|
$31,999.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
2.000
|
$18,000.000
|
$7,550.000
|
$8,267.500
|
$8,737.190
|
$8,000.000
|
$10,000.000
|
$7,729.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$8,937.000
|
$11,540.000
|
$12,152.900
|
$10,330.860
|
$10,000.000
|
$10,000.000
|
$9,275.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
|
EA
|
2.000
|
$11,000.000
|
$8,500.000
|
$8,993.400
|
$9,268.420
|
$9,000.000
|
$12,000.000
|
$8,244.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
7.000
|
$10,305.000
|
$12,550.000
|
$13,171.100
|
$11,393.310
|
$11,000.000
|
$10,000.000
|
$10,305.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,917.000
|
$2,200.000
|
$2,782.500
|
$1,716.520
|
$2,500.000
|
$2,500.000
|
$2,555.000
|
|
|
JACK BOR TUN BOX CULV (6 FT X 3 FT)
|
LF
|
410.000
|
$1,500.000
|
$1,460.000
|
$2,718.800
|
$2,178.110
|
$1,700.000
|
$2,100.000
|
$2,627.000
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
72.000
|
$225.000
|
$55.000
|
$104.000
|
$44.710
|
$100.000
|
$175.000
|
$192.000
|
|
|
PIPE (MISC) (6 IN)
|
LF
|
129.000
|
$200.000
|
$108.000
|
$63.200
|
$133.460
|
$80.000
|
$50.000
|
$106.000
|
|
|
REMOV STR (SET)
|
EA
|
159.000
|
$565.000
|
$640.000
|
$426.400
|
$396.310
|
$500.000
|
$550.000
|
$532.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$2,143.000
|
$3,000.000
|
$4,523.500
|
$1,981.560
|
$3,000.000
|
$1,500.000
|
$7,346.000
|
|
|
REMOV STR (PIPE)
|
LF
|
2,846.000
|
$20.000
|
$20.000
|
$25.500
|
$22.550
|
$18.000
|
$24.000
|
$11.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
887.000
|
$40.000
|
$63.000
|
$39.900
|
$69.130
|
$40.000
|
$40.000
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,698,607.160
|
$2,500,000.000
|
$2,900,000.000
|
$3,301,369.000
|
$3,000,000.000
|
$3,538,063.480
|
$3,689,493.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
39.000
|
$4,000.000
|
$2,500.000
|
$5,168.000
|
$5,854.960
|
$9,000.000
|
$8,500.000
|
$8,607.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
204.000
|
$47.480
|
$45.000
|
$83.200
|
$45.000
|
$50.000
|
$45.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
204.000
|
$19.640
|
$20.000
|
$15.600
|
$20.000
|
$20.000
|
$20.000
|
$23.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$33.790
|
$45.000
|
$31.200
|
$45.000
|
$45.000
|
$38.000
|
$42.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$12.440
|
$20.000
|
$5.200
|
$20.000
|
$20.000
|
$15.000
|
$14.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,895.000
|
$5.670
|
$2.950
|
$2.100
|
$3.750
|
$4.000
|
$3.500
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,895.000
|
$2.170
|
$1.100
|
$0.500
|
$1.250
|
$1.000
|
$1.000
|
$2.900
|
|
|
CONSTRUCTING DETOURS
|
SY
|
10,237.000
|
$75.000
|
$80.000
|
$54.500
|
$116.800
|
$90.000
|
$100.000
|
$112.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$20.000
|
$30.000
|
$44.000
|
$67.480
|
$70.000
|
$100.000
|
$71.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
3,260.000
|
$19.000
|
$20.000
|
$12.800
|
$12.770
|
$15.000
|
$20.000
|
$50.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
3,260.000
|
$11.320
|
$10.000
|
$12.300
|
$5.250
|
$10.000
|
$15.000
|
$1.600
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
680.000
|
$19.480
|
$10.000
|
$12.300
|
$5.620
|
$10.000
|
$11.000
|
$7.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
3,260.000
|
$14.960
|
$15.000
|
$12.800
|
$11.670
|
$10.000
|
$20.000
|
$50.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
740.000
|
$20.930
|
$15.000
|
$12.800
|
$14.340
|
$10.000
|
$20.000
|
$16.000
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
1,010.000
|
$28.110
|
$4.000
|
$5.200
|
$10.590
|
$6.000
|
$20.000
|
$8.900
|
|
|
DRIVEWAYS (CONC) (FAST TRACK)
|
SY
|
7,820.000
|
$75.000
|
$65.000
|
$86.100
|
$71.430
|
$91.000
|
$98.000
|
$287.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
15,234.000
|
$60.000
|
$60.000
|
$59.400
|
$50.460
|
$72.000
|
$65.000
|
$95.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
20.000
|
$2,000.000
|
$2,500.000
|
$2,249.100
|
$2,163.380
|
$2,400.000
|
$2,000.000
|
$4,102.000
|
|
|
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
|
LF
|
52.000
|
$100.000
|
$55.850
|
$76.400
|
$65.000
|
$50.000
|
$50.000
|
$0.680
|
|
|
GATE (INSTALL)(DOUBLE)(6' X 16')
|
EA
|
1.000
|
$900.000
|
$4,500.000
|
$2,080.000
|
$2,500.000
|
$3,000.000
|
$4,500.000
|
$2,548.000
|
|
|
ELC SRV TY C 240/480 100(SS)SS(E)SF(U)
|
EA
|
1.000
|
$8,000.000
|
$9,000.000
|
$15,600.000
|
$10,000.000
|
$10,000.000
|
$18,500.000
|
$8,154.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
16.000
|
$898.000
|
$500.000
|
$884.000
|
$485.750
|
$550.000
|
$500.000
|
$746.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,050.000
|
$950.000
|
$1,248.000
|
$921.000
|
$1,000.000
|
$1,000.000
|
$1,085.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
11.000
|
$550.000
|
$400.000
|
$780.000
|
$379.000
|
$400.000
|
$400.000
|
$704.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$660.000
|
$500.000
|
$686.400
|
$488.000
|
$500.000
|
$500.000
|
$841.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$232.000
|
$80.000
|
$166.400
|
$75.000
|
$90.000
|
$100.000
|
$132.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
6,320.000
|
$1.350
|
$1.250
|
$1.000
|
$1.400
|
$1.500
|
$1.750
|
$1.110
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
29,767.000
|
$1.040
|
$0.500
|
$1.000
|
$0.600
|
$0.600
|
$1.000
|
$1.110
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
36.000
|
$11.000
|
$8.500
|
$13.500
|
$8.000
|
$6.500
|
$9.000
|
$10.620
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
31,256.000
|
$1.070
|
$0.550
|
$1.000
|
$0.600
|
$0.600
|
$1.000
|
$1.110
|
|
REFL PAV MRK TY II (Y) 12" (SLD)
|
LF
|
1,010.000
|
$1.300
|
$0.850
|
$2.300
|
$1.000
|
$1.100
|
$1.500
|
$1.670
|
|
|
PAVEMENT SEALER 6"
|
LF
|
31,528.000
|
$0.240
|
$0.200
|
$0.500
|
$0.200
|
$0.200
|
$0.500
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
504.000
|
$0.280
|
$0.400
|
$0.600
|
$0.400
|
$0.400
|
$0.750
|
$0.010
|
|
|
PAVEMENT SEALER 24"
|
LF
|
72.000
|
$1.190
|
$2.250
|
$3.100
|
$2.400
|
$2.500
|
$3.000
|
$0.010
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
28.000
|
$27.390
|
$25.000
|
$78.000
|
$25.000
|
$30.000
|
$30.000
|
$0.010
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$29.000
|
$25.000
|
$80.100
|
$25.000
|
$30.000
|
$30.000
|
$0.010
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
|
LF
|
11,717.000
|
$1.660
|
$1.100
|
$1.700
|
$1.150
|
$1.200
|
$1.500
|
$1.410
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
|
LF
|
10,903.000
|
$1.070
|
$1.100
|
$1.800
|
$1.150
|
$1.200
|
$1.500
|
$1.410
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
|
LF
|
2,722.000
|
$0.850
|
$1.500
|
$0.800
|
$1.500
|
$1.600
|
$1.750
|
$1.410
|
|
REFL PAV MRKR TY I-C
|
EA
|
155.000
|
$5.820
|
$5.000
|
$5.800
|
$4.900
|
$5.000
|
$5.250
|
$7.230
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
272.000
|
$6.350
|
$5.000
|
$23.900
|
$4.900
|
$5.000
|
$5.250
|
$7.230
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
25.000
|
$6.580
|
$5.000
|
$7.700
|
$4.900
|
$5.000
|
$5.250
|
$7.230
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
42,905.000
|
$0.540
|
$0.300
|
$1.000
|
$0.400
|
$0.400
|
$0.750
|
$0.340
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
31,528.000
|
$0.110
|
$0.050
|
$0.300
|
$0.060
|
$0.100
|
$0.100
|
$0.070
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
504.000
|
$0.150
|
$0.080
|
$0.300
|
$0.080
|
$0.100
|
$0.250
|
$0.090
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
72.000
|
$0.560
|
$0.200
|
$1.200
|
$0.240
|
$0.250
|
$0.500
|
$0.270
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
28.000
|
$16.920
|
$9.500
|
$62.400
|
$9.000
|
$10.000
|
$10.000
|
$5.600
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$19.590
|
$9.500
|
$67.600
|
$9.000
|
$10.000
|
$10.000
|
$5.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$167.000
|
$65.000
|
$130.000
|
$55.780
|
$70.000
|
$75.000
|
$235.000
|
|
MULTIPOLYMER PAV MRK (W)(6")(BRK)
|
LF
|
3,093.000
|
$1.610
|
$2.000
|
$1.400
|
$2.000
|
$2.000
|
$3.000
|
$2.000
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
504.000
|
$2.200
|
$3.000
|
$4.700
|
$3.000
|
$3.000
|
$4.000
|
$2.800
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
72.000
|
$9.580
|
$12.500
|
$10.100
|
$12.000
|
$13.000
|
$13.500
|
$11.700
|
|
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
|
LF
|
3,093.000
|
$1.630
|
$2.300
|
$1.400
|
$2.210
|
$2.400
|
$2.750
|
$2.000
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
28.000
|
$253.990
|
$195.000
|
$322.400
|
$185.000
|
$200.000
|
$200.000
|
$361.000
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
4.000
|
$267.040
|
$250.000
|
$416.000
|
$250.000
|
$275.000
|
$275.000
|
$395.000
|
|
|
TMA (STATIONARY)
|
DAY
|
104.000
|
$479.000
|
$190.000
|
$390.000
|
$338.660
|
$250.000
|
$350.000
|
$254.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$155.000
|
$845.000
|
$114.400
|
$1,049.020
|
$75.000
|
$90.000
|
$108.000
|
|
|
AUTOMATIC PUMPING STATION
|
LS
|
1.000
|
$120,000.000
|
$110,000.000
|
$160,537.500
|
$150,000.000
|
$125,700.000
|
$400,000.000
|
$555,100.000
|
|
Totals: |
$29,750,877.770
|
$31,355,904.720
|
$31,898,179.500
|
$33,084,950.950
|
$33,724,169.600
|
$38,918,698.280
|
$41,426,394.800
|