MONTGOMERY FM 1314 (1986-01-064)

Items: 121

County: MONTGOMERY
Length: N/A
Highway: FM 1314
District: HOUSTON
Control Number: 1986-01-064
DBE Goal: 0.0%
Project: C 1986-1-64
Guaranty: N/A
Time: 819 WORKING DAYS
Engineer's Estimate: $29,750,877.77
Date: 06/06/2024 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$29,750,877.77
$31,355,904.72
Over/Under Est: 5.39% $1,605,026.95
Over/Under Est: 7.22% $2,147,301.73
Amt Left: 1.73% $542,274.78
Over/Under Est: 11.21% $3,334,073.18
Amt Left: 5.51% $1,729,046.23
Delta: -3.72% -$1,186,771.45
$33,724,169.60
Over/Under Est: 13.36% $3,973,291.83
Amt Left: 7.55% $2,368,264.88
Delta: -1.93% -$639,218.65
Over/Under Est: 30.82% $9,167,820.51
Amt Left: 24.12% $7,562,793.56
Delta: -15.40% -$5,194,528.68
$41,426,394.80
Over/Under Est: 39.24% $11,675,517.03
Amt Left: 32.12% $10,070,490.08
Delta: -6.44% -$2,507,696.52
Subcontractor Percentage Amount
GMJ PAVING CO. 4.09% $1,282,456.50
DURWOOD GREENE CONSTRUCTION CO. 1.83% $573,813.06
SEMARCK LANDSCAPE SERVICES, INC. 1.37% $429,575.89
DDS DIRECTIONAL DRILLING SERVICES LLC 0.72% $225,762.51
HIGHWAY 1 LLC 0.64% $200,677.79
TRP CONSTRUCTION GROUP, LLC 0.57% $178,728.66
PFEIFFER & SON LTD. 0.36% $112,881.26
MCNORTON DEWATERING, INC. 0.09% $28,220.31
WILLOW CITY SIGN & RAIL, INC. 0.05% $15,677.95
CURB PLANET INC. 0.00% $0.00
Total: 9.72% $3,047,793.93

Bid Items & Bid Tabulations

121 Total 0 of 121
MONTGOMERY  |  FM 1314  |  HOUSTON  |  1986-01-064  |  06/06/2024  |  $29,750,877.77  |  C 1986-1-64  |  REHAB EXIST ROADWAY  |  819 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
SER CONSTRUCTION PARTNERS, LLC
JAMES CONSTRUCTION GROUP, LLC
MC2 CIVIL, LLC
ENVIRONMENTAL ALLIES, INC.
ISI CONTRACTING, INC.
PREPARING ROW
STA 116.000 $2,000.000 $4,000.000 $2,000.000 $26,328.000 $4,400.000 $5,000.000 $2,809.000
REMOVING CONC (MEDIANS)
SY 440.000 $19.710 $2.700 $8.300 $12.300 $10.000 $10.000 $29.000
REMOVING CONC (DRIVEWAYS)
SY 2,899.000 $14.950 $6.500 $8.300 $10.200 $8.000 $9.000 $14.000
REMOVING CONC (CURB)
LF 8,973.000 $18.920 $1.750 $3.100 $4.100 $3.000 $5.000 $3.000
REMOVE CONC (WINGWALL)
CY 69.000 $383.000 $110.000 $78.000 $321.220 $150.000 $400.000 $213.000
REMOVING STAB BASE AND ASPH PAV(6"-9")
SY 37,710.000 $9.000 $3.650 $8.500 $4.230 $4.000 $5.750 $10.000
EXCAVATION (ROADWAY)
CY 23,077.000 $3.000 $24.000 $7.200 $6.070 $14.000 $25.000 $17.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,972.000 $9.000 $25.000 $10.200 $8.530 $5.000 $27.000 $24.000
BLOCK SODDING
SY 73,197.000 $8.480 $4.250 $4.400 $4.500 $5.000 $6.000 $4.500
FERTILIZER
AC 15.330 $4,500.000 $785.000 $1,040.000 $750.000 $800.000 $1,000.000 $959.000
VEGETATIVE WATERING
MG 1,839.000 $132.350 $37.000 $36.400 $30.000 $20.000 $40.000 $55.000
LIME TRT (EXST MATL) (6")
SY 19,296.000 $8.150 $4.500 $4.300 $4.720 $4.000 $12.000 $15.000
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 261.000 $350.000 $335.000 $354.100 $355.920 $360.000 $400.000 $331.000
CEMENT
TON 261.000 $250.000 $215.000 $218.400 $224.180 $286.000 $300.000 $375.000
CEMENT TREAT (EXIST MATL) (6")
SY 19,296.000 $3.000 $5.500 $4.300 $2.600 $4.000 $5.000 $4.300
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 38,593.000 $25.000 $32.000 $17.400 $14.000 $18.000 $20.000 $26.000
ASPHALT STAB BASE (GR 4)(PG 64)
TON 2,073.000 $110.000 $159.000 $118.800 $167.650 $140.000 $165.000 $152.000
SALV, HAUL & STKPL RCL APH PV (6 TO 8")
SY 4,921.000 $5.000 $7.200 $9.300 $7.170 $5.000 $5.000 $10.100
SLV, HAUL & STKPL RCL APH PV (6 TO 12")
SY 37,710.000 $5.000 $8.300 $7.200 $7.070 $5.000 $8.000 $16.600
CONC PVMT (CONT REINF - CRCP) (10")
SY 37,697.000 $60.000 $70.000 $86.500 $90.000 $84.000 $94.000 $85.000
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 13,967.000 $125.000 $110.000 $114.400 $132.390 $122.000 $140.000 $119.000
CEM STABIL BKFL
CY 17,062.000 $60.000 $53.500 $60.300 $51.000 $55.000 $80.000 $91.000
CUT & RESTORE CONC PAVING
SY 6.000 $200.000 $950.000 $243.900 $401.310 $500.000 $300.000 $1,066.000
CUT & RESTORE ASPH PAVING
SY 66.000 $78.000 $225.000 $202.400 $146.150 $250.000 $200.000 $434.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 905.000 $57.000 $45.000 $60.300 $50.220 $55.000 $75.000 $50.000
TRENCH EXCAVATION PROTECTION
LF 16,442.000 $35.000 $1.000 $1.000 $1.060 $1.000 $5.000 $5.100
TEMPORARY SPL SHORING
SF 5,200.000 $20.000 $30.000 $25.000 $40.560 $10.000 $18.000 $21.400
RETAINING WALL (CAST - IN - PLACE)
SF 974.000 $91.000 $83.000 $187.900 $42.730 $110.000 $90.000 $255.000
RIPRAP (CONC)(6 IN)
CY 138.000 $650.000 $280.000 $407.300 $513.410 $450.000 $525.000 $1,394.000
RIPRAP (CONC)(CL B)(5 IN)
CY 2,615.000 $450.000 $300.000 $521.100 $326.060 $450.000 $550.000 $964.000
CONC BOX CULV (4 FT X 2 FT)
LF 31.000 $328.000 $325.000 $390.400 $404.050 $366.000 $405.000 $18,200.000
CONC BOX CULV (4 FT X 3 FT)
LF 1,468.000 $333.000 $350.000 $312.600 $304.580 $400.000 $415.000 $405.000
CONC BOX CULV (4 FT X 4 FT)
LF 120.000 $385.000 $385.000 $371.300 $376.110 $505.000 $440.000 $414.000
CONC BOX CULV (5 FT X 2 FT)
LF 70.000 $486.000 $410.000 $397.900 $378.620 $510.000 $475.000 $469.000
CONC BOX CULV (5 FT X 3 FT)
LF 2,455.000 $380.000 $430.000 $390.100 $358.240 $475.000 $500.000 $510.000
CONC BOX CULV (6 FT X 4 FT)
LF 6,648.000 $600.000 $570.000 $537.800 $473.370 $622.000 $650.000 $619.000
CONC BOX CULV (8 FT X 5 FT)
LF 112.000 $754.000 $790.000 $939.700 $659.280 $1,000.000 $900.000 $846.000
CONC BOX CULV (12 FT X 6 FT)
LF 1,436.000 $1,100.000 $1,545.000 $1,459.400 $1,302.110 $1,600.000 $1,950.000 $1,570.000
CONC BOX CULV (12 FT X 5 FT)
LF 4,050.000 $1,000.000 $1,480.000 $1,386.900 $1,252.370 $1,580.000 $1,700.000 $1,456.000
RC PIPE (CL III)(18 IN)
LF 733.000 $86.000 $80.000 $100.800 $66.200 $72.000 $125.000 $155.000
RC PIPE (CL III)(24 IN)
LF 207.000 $98.000 $95.000 $138.600 $203.810 $130.000 $150.000 $178.000
INLET (COMPL)(TY AAD)
EA 12.000 $11,898.000 $4,600.000 $6,328.100 $5,106.440 $6,000.000 $8,500.000 $4,472.000
MANH (COMPL)(TY A)
EA 1.000 $9,762.000 $5,300.000 $6,795.300 $4,892.980 $5,700.000 $15,000.000 $4,946.000
JCT BOX (COMPL)(SPL)
EA 3.000 $53,000.000 $58,000.000 $104,633.200 $65,501.020 $90,000.000 $57,000.000 $59,666.000
INLET (STAGE II)(TY AD) (SPECIAL)
EA 53.000 $3,100.000 $4,450.000 $4,155.000 $3,831.520 $4,500.000 $5,000.000 $3,235.000
MANHOLE (COMPL)(SPECIAL)
EA 6.000 $15,000.000 $6,650.000 $7,129.600 $5,637.670 $6,000.000 $9,000.000 $1,957.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $10,538.000 $11,300.000 $6,419.600 $6,516.280 $12,000.000 $9,500.000 $18,513.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $22,900.000 $16,000.000 $40,466.400 $10,725.230 $15,000.000 $20,000.000 $26,112.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $16,232.000 $16,000.000 $32,321.800 $11,314.600 $20,000.000 $20,000.000 $26,620.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $66,772.000 $32,700.000 $38,833.000 $28,070.420 $30,000.000 $40,000.000 $31,999.000
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1) (P)
EA 2.000 $18,000.000 $7,550.000 $8,267.500 $8,737.190 $8,000.000 $10,000.000 $7,729.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 4.000 $8,937.000 $11,540.000 $12,152.900 $10,330.860 $10,000.000 $10,000.000 $9,275.000
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (P)
EA 2.000 $11,000.000 $8,500.000 $8,993.400 $9,268.420 $9,000.000 $12,000.000 $8,244.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 7.000 $10,305.000 $12,550.000 $13,171.100 $11,393.310 $11,000.000 $10,000.000 $10,305.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,917.000 $2,200.000 $2,782.500 $1,716.520 $2,500.000 $2,500.000 $2,555.000
JACK BOR TUN BOX CULV (6 FT X 3 FT)
LF 410.000 $1,500.000 $1,460.000 $2,718.800 $2,178.110 $1,700.000 $2,100.000 $2,627.000
PIPE (PVC) (SCH 40) (12 IN)
LF 72.000 $225.000 $55.000 $104.000 $44.710 $100.000 $175.000 $192.000
PIPE (MISC) (6 IN)
LF 129.000 $200.000 $108.000 $63.200 $133.460 $80.000 $50.000 $106.000
REMOV STR (SET)
EA 159.000 $565.000 $640.000 $426.400 $396.310 $500.000 $550.000 $532.000
REMOV STR (HEADWALL)
EA 2.000 $2,143.000 $3,000.000 $4,523.500 $1,981.560 $3,000.000 $1,500.000 $7,346.000
REMOV STR (PIPE)
LF 2,846.000 $20.000 $20.000 $25.500 $22.550 $18.000 $24.000 $11.000
REMOV STR (BOX CULVERT)
LF 887.000 $40.000 $63.000 $39.900 $69.130 $40.000 $40.000 $11.000
MOBILIZATION
LS 1.000 $2,698,607.160 $2,500,000.000 $2,900,000.000 $3,301,369.000 $3,000,000.000 $3,538,063.480 $3,689,493.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 39.000 $4,000.000 $2,500.000 $5,168.000 $5,854.960 $9,000.000 $8,500.000 $8,607.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 204.000 $47.480 $45.000 $83.200 $45.000 $50.000 $45.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 204.000 $19.640 $20.000 $15.600 $20.000 $20.000 $20.000 $23.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 222.000 $33.790 $45.000 $31.200 $45.000 $45.000 $38.000 $42.000
CONSTRUCTION EXITS (REMOVE)
SY 222.000 $12.440 $20.000 $5.200 $20.000 $20.000 $15.000 $14.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,895.000 $5.670 $2.950 $2.100 $3.750 $4.000 $3.500 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,895.000 $2.170 $1.100 $0.500 $1.250 $1.000 $1.000 $2.900
CONSTRUCTING DETOURS
SY 10,237.000 $75.000 $80.000 $54.500 $116.800 $90.000 $100.000 $112.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 740.000 $20.000 $30.000 $44.000 $67.480 $70.000 $100.000 $71.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 3,260.000 $19.000 $20.000 $12.800 $12.770 $15.000 $20.000 $50.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 3,260.000 $11.320 $10.000 $12.300 $5.250 $10.000 $15.000 $1.600
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 680.000 $19.480 $10.000 $12.300 $5.620 $10.000 $11.000 $7.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 3,260.000 $14.960 $15.000 $12.800 $11.670 $10.000 $20.000 $50.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 740.000 $20.930 $15.000 $12.800 $14.340 $10.000 $20.000 $16.000
CONC CURB (DOWEL) (TY II)
LF 1,010.000 $28.110 $4.000 $5.200 $10.590 $6.000 $20.000 $8.900
DRIVEWAYS (CONC) (FAST TRACK)
SY 7,820.000 $75.000 $65.000 $86.100 $71.430 $91.000 $98.000 $287.000
CONC SIDEWALKS (5")
SY 15,234.000 $60.000 $60.000 $59.400 $50.460 $72.000 $65.000 $95.000
CURB RAMPS (TY 7)
EA 20.000 $2,000.000 $2,500.000 $2,249.100 $2,163.380 $2,400.000 $2,000.000 $4,102.000
CHAIN LINK FENCE(INSTALL)(6 )(BARB TOP)
LF 52.000 $100.000 $55.850 $76.400 $65.000 $50.000 $50.000 $0.680
GATE (INSTALL)(DOUBLE)(6' X 16')
EA 1.000 $900.000 $4,500.000 $2,080.000 $2,500.000 $3,000.000 $4,500.000 $2,548.000
ELC SRV TY C 240/480 100(SS)SS(E)SF(U)
EA 1.000 $8,000.000 $9,000.000 $15,600.000 $10,000.000 $10,000.000 $18,500.000 $8,154.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 16.000 $898.000 $500.000 $884.000 $485.750 $550.000 $500.000 $746.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,050.000 $950.000 $1,248.000 $921.000 $1,000.000 $1,000.000 $1,085.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 11.000 $550.000 $400.000 $780.000 $379.000 $400.000 $400.000 $704.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $660.000 $500.000 $686.400 $488.000 $500.000 $500.000 $841.000
REMOVE SM RD SN SUP&AM
EA 15.000 $232.000 $80.000 $166.400 $75.000 $90.000 $100.000 $132.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 6,320.000 $1.350 $1.250 $1.000 $1.400 $1.500 $1.750 $1.110
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 29,767.000 $1.040 $0.500 $1.000 $0.600 $0.600 $1.000 $1.110
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 36.000 $11.000 $8.500 $13.500 $8.000 $6.500 $9.000 $10.620
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 31,256.000 $1.070 $0.550 $1.000 $0.600 $0.600 $1.000 $1.110
REFL PAV MRK TY II (Y) 12" (SLD)
LF 1,010.000 $1.300 $0.850 $2.300 $1.000 $1.100 $1.500 $1.670
PAVEMENT SEALER 6"
LF 31,528.000 $0.240 $0.200 $0.500 $0.200 $0.200 $0.500 $0.200
PAVEMENT SEALER 8"
LF 504.000 $0.280 $0.400 $0.600 $0.400 $0.400 $0.750 $0.010
PAVEMENT SEALER 24"
LF 72.000 $1.190 $2.250 $3.100 $2.400 $2.500 $3.000 $0.010
PAVEMENT SEALER (ARROW)
EA 28.000 $27.390 $25.000 $78.000 $25.000 $30.000 $30.000 $0.010
PAVEMENT SEALER (WORD)
EA 4.000 $29.000 $25.000 $80.100 $25.000 $30.000 $30.000 $0.010
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 11,717.000 $1.660 $1.100 $1.700 $1.150 $1.200 $1.500 $1.410
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 10,903.000 $1.070 $1.100 $1.800 $1.150 $1.200 $1.500 $1.410
REF PROF PAV MRK TY I(Y)6"(BRK)(090MIL)
LF 2,722.000 $0.850 $1.500 $0.800 $1.500 $1.600 $1.750 $1.410
REFL PAV MRKR TY I-C
EA 155.000 $5.820 $5.000 $5.800 $4.900 $5.000 $5.250 $7.230
REFL PAV MRKR TY II-A-A
EA 272.000 $6.350 $5.000 $23.900 $4.900 $5.000 $5.250 $7.230
REFL PAV MRKR TY II-C-R
EA 25.000 $6.580 $5.000 $7.700 $4.900 $5.000 $5.250 $7.230
ELIM EXT PAV MRK & MRKS (6")
LF 42,905.000 $0.540 $0.300 $1.000 $0.400 $0.400 $0.750 $0.340
PAV SURF PREP FOR MRK (6")
LF 31,528.000 $0.110 $0.050 $0.300 $0.060 $0.100 $0.100 $0.070
PAV SURF PREP FOR MRK (8")
LF 504.000 $0.150 $0.080 $0.300 $0.080 $0.100 $0.250 $0.090
PAV SURF PREP FOR MRK (24")
LF 72.000 $0.560 $0.200 $1.200 $0.240 $0.250 $0.500 $0.270
PAV SURF PREP FOR MRK (ARROW)
EA 28.000 $16.920 $9.500 $62.400 $9.000 $10.000 $10.000 $5.600
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $19.590 $9.500 $67.600 $9.000 $10.000 $10.000 $5.600
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 120.000 $167.000 $65.000 $130.000 $55.780 $70.000 $75.000 $235.000
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 3,093.000 $1.610 $2.000 $1.400 $2.000 $2.000 $3.000 $2.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 504.000 $2.200 $3.000 $4.700 $3.000 $3.000 $4.000 $2.800
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 72.000 $9.580 $12.500 $10.100 $12.000 $13.000 $13.500 $11.700
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 3,093.000 $1.630 $2.300 $1.400 $2.210 $2.400 $2.750 $2.000
MULTIYPOLYMER PAV MRK (W) (ARROW)
EA 28.000 $253.990 $195.000 $322.400 $185.000 $200.000 $200.000 $361.000
MULTIPOLYMER PAV MRK (W) (WORD)
EA 4.000 $267.040 $250.000 $416.000 $250.000 $275.000 $275.000 $395.000
TMA (STATIONARY)
DAY 104.000 $479.000 $190.000 $390.000 $338.660 $250.000 $350.000 $254.000
TMA (MOBILE OPERATION)
HR 80.000 $155.000 $845.000 $114.400 $1,049.020 $75.000 $90.000 $108.000
AUTOMATIC PUMPING STATION
LS 1.000 $120,000.000 $110,000.000 $160,537.500 $150,000.000 $125,700.000 $400,000.000 $555,100.000
Totals: $29,750,877.770 $31,355,904.720 $31,898,179.500 $33,084,950.950 $33,724,169.600 $38,918,698.280 $41,426,394.800