Show Job Controls
Bid Cobra

MONTGOMERY SH 105 (0338-07-019)

Items: 290

County: MONTGOMERY
Length: 5.0580 MILES
Highway: SH 105
District: HOUSTON
Control Number: 0338-07-019
DBE Goal: 7.5%
Project: F 2025(041)
Guaranty: $100,000.00
Time: 758 WORKING DAYS
Engineer's Estimate: $73,558,885.90
Date: 10/01/2024 (1 year ago)
Contract Number: 10243001
Type: WIDEN ROAD - ADD LANES
Project ID: A00089097
Project Description: RECONSTRUCT AND WIDEN FROM 2-LANE TO 4-LANE DIVIDED
Mail/Deliver Bids To: N/A
ABRAHAM GUZMAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$73,558,885.90
$63,793,851.71
Over/Under Est: -13.28% -$9,765,034.19
Over/Under Est: -13.1% -$9,637,549.94
Amt Left: 0.2% $127,484.25
Subcontractor Percentage Amount
MONTALVO BRIDGE SYSTEMS, LLC 7.52% $4,804,820.51
CREACOM, INC. 3.26% $2,082,940.81
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.75% $1,118,143.07
TEX OP CONSTRUCTION, LP 1.63% $1,041,470.40
TRAFFIC SIGNS & LINES, LLC 1.11% $709,222.18
M & D FOUNDATION DRILLING INDUSTRIES, INC. 0.88% $562,266.23
CPAVE, INC. 0.24% $153,345.34
RS&DS SERVICES, LLC 0.24% $153,345.34
PRV SERVICES, INC. 0.06% $38,336.33
G & D DIRECCIONAL 0.05% $31,946.94
SEMARCK LANDSCAPE SERVICES, INC. 0.04% $25,557.56
MESA ROD BUSTERS INC 0.03% $19,168.17
A. SANCHEZ TRUCKING 0.02% $12,778.78
HOUSTON SAWING & DRILLING 0.02% $12,778.78
C & C TRAFFIC CONTROL 0.01% $6,389.39
CURB PLANET INC. 0.00% $0.00
Total: 16.86% $10,772,509.83

Bid Items & Bid Tabulations

290 Total 0 of 290
MONTGOMERY  |  SH 105  |  HOUSTON  |  0338-07-019  |  10/01/2024  |  $73,558,885.90  |  F 2025(041)  |  WIDEN ROAD - ADD LANES  |  758 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
JAMES CONSTRUCTION GROUP, LLC
PREPARING ROW
STA 274.660 $10,000.000 $3,700.000 $10,546.000
REMOV CONC (PAV)
SY 14.000 $400.000 $21.600 $284.330
REMOV CONC (MOWSTRIP)
LF 1,125.000 $16.000 $4.800 $7.190
REMOV CONC (RIPRAP)
SY 271.000 $20.000 $7.000 $20.170
REMOV CONC (DRIVEWAYS)
SY 881.000 $15.000 $7.400 $9.870
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 28.000 $50.000 $5.700 $23.990
REMOV CONC (MISC)
EA 5.000 $1,000.000 $1,040.000 $1,218.310
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 169,455.000 $6.000 $5.800 $3.230
RMV (2"-8") TRT/UNTRT BASE & ASPH PAV
SY 5,363.000 $4.000 $6.800 $2.220
EXCAV (ROADWAY)
CY 143,282.000 $10.000 $11.000 $9.460
EXCAV (CHANNEL)
CY 14,178.000 $15.000 $11.100 $10.990
EMBANK (FNL)(DC)(TY C)
CY 107,794.000 $15.000 $4.000 $2.590
COMPOST MANUF TOPSOIL (4")
SY 14,361.000 $1.000 $1.200 $1.150
BLOCK SODDING
SY 284,825.000 $4.500 $4.300 $3.720
BROADCAST SEED (TEMP_WARM_COOL)
SY 2,993.000 $0.250 $0.200 $0.220
BROADCAST SEED (OPT1)
SY 144.000 $0.250 $1.700 $0.250
DRILL SEED (TEMP_WARM_COOL)
SY 59,837.000 $0.200 $0.200 $0.250
DRILL SEED (OPT1)
SY 14,361.000 $0.200 $0.400 $0.280
STRAW/HAY MULCH
SY 77,335.000 $0.350 $0.200 $0.230
FERTILIZER
AC 74.830 $1,300.000 $725.200 $750.520
VEGETATIVE WATERING
TGL 8,979.600 $35.000 $2.000 $30.020
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 1,803.000 $350.000 $360.900 $381.460
LIME TRT (EXIST MATL)(6")
SY 133,666.000 $4.000 $2.800 $3.720
CEMENT
TON 1,803.000 $225.000 $192.400 $205.750
CEMENT TRT (EXIST MATL)(6")
SY 133,666.000 $4.000 $3.200 $2.050
CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(6")
SY 267,332.000 $18.000 $8.600 $9.990
ASPHALT TRT BASE (GR 4)(PG 64)
TON 14,707.000 $120.000 $127.900 $128.800
SALV,HAUL & STKPL RCL APH PV(3"TO 8")
SY 169,455.000 $3.000 $3.700 $1.000
D-GR HMA TY-D SAC-A PG70-22
TON 1,377.000 $140.000 $195.600 $171.430
PLANE ASPH CONC PAV(2")
SY 10,392.000 $2.500 $2.400 $3.160
PLANE ASPH CONC PAV (1.5")
SY 6,309.000 $2.000 $2.600 $2.870
CONC PVMT (CRCP) (10")
SY 255,449.000 $84.000 $70.700 $74.010
CONC PVMT (CRCP)(FAST TRK) (13")
SY 8,841.000 $125.000 $126.100 $130.400
CUT & RESTORE ASPH PAVING
SY 704.000 $115.000 $175.500 $214.870
CEM STABIL BKFL
CY 6,698.000 $55.000 $52.000 $55.010
CEMENT STAB BACKFILL (INLET OR MH)
CY 78.000 $55.000 $52.000 $55.010
FLOWABLE BACKFILL
CY 24.000 $500.000 $234.600 $243.900
TRENCH EXCAVATION PROTECTION
LF 4,050.000 $5.000 $0.100 $1.100
TEMPORARY SPL SHORING
SF 4,002.000 $19.000 $18.300 $82.330
DRILL SHAFT (18 IN)
LF 278.000 $115.000 $105.000 $64.480
DRILL SHAFT (36 IN)
LF 1,391.000 $300.000 $392.800 $234.390
DRILL SHAFT (42 IN)
LF 981.000 $375.000 $537.000 $307.250
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.600 $400.000 $281.000 $267.450
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 78.000 $450.000 $329.800 $317.080
CL C CONC (ABUT)
CY 223.700 $1,300.000 $1,178.500 $825.010
CL C CONC (CAP)
CY 91.800 $1,800.000 $1,244.500 $1,318.650
CL C CONC (COLUMN)
CY 46.100 $1,500.000 $1,479.500 $1,446.780
CL C CONC (RAIL FOUNDATION)
CY 687.000 $650.000 $473.000 $464.240
REINF CONC SLAB
SF 35,078.000 $22.000 $22.900 $19.830
RETAINING WALL (SPREAD FOOTING)
SF 3,250.000 $90.000 $81.700 $84.720
PRESTR CONC GIRDER (TX34)
LF 5,428.000 $205.000 $186.900 $186.820
CONCRETE PAINT FINISH
SF 3,094.000 $2.000 $0.800 $0.370
RIPRAP (CONC)(5 IN)
CY 63.000 $500.000 $545.300 $740.030
RIPRAP (CONC) (CL B) (4 IN)
CY 179.000 $500.000 $555.900 $532.200
RIPRAP (CONC)(CL B)(5 IN)
CY 120.000 $500.000 $557.500 $459.620
RIPRAP (MOW STRIP)(4 IN)
CY 79.000 $500.000 $550.700 $626.210
RIPRAP (STONE PROTECTION)(12 IN)
CY 1,199.000 $200.000 $194.100 $201.370
STR STEEL (MISC NON-BRIDGE)
LB 721.000 $20.000 $18.200 $16.740
RAIL (TY C221)
LF 15,480.000 $105.000 $132.800 $86.520
RAIL (TY C223)
LF 5,099.000 $150.000 $134.400 $141.470
RAIL (CLF-RO)
LF 564.000 $200.000 $156.000 $110.000
RAIL (HANDRAIL)(TY F)
LF 85.000 $130.000 $377.200 $166.060
RETROFIT RAIL (TY C221)
LF 580.000 $200.000 $188.100 $112.010
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 410.000 $200.000 $215.000 $176.500
CONC BOX CULV (4 FT X 3 FT)
LF 102.000 $375.000 $356.100 $384.900
CONC BOX CULV (5 FT X 2 FT)
LF 1,052.000 $425.000 $372.000 $410.500
CONC BOX CULV (5 FT X 3 FT)
LF 296.000 $450.000 $412.000 $412.790
CONC BOX CULV (6 FT X 2 FT)
LF 107.000 $500.000 $451.200 $481.840
CONC BOX CULV (6 FT X 3 FT)
LF 69.000 $600.000 $488.200 $503.560
CONC BOX CULV (6 FT X 4 FT)
LF 309.000 $670.000 $539.600 $580.210
CONC BOX CULV (6 FT X 6 FT)
LF 153.000 $750.000 $655.800 $658.210
CONC BOX CULV (7 FT X 3 FT)
LF 170.000 $700.000 $605.400 $580.590
CONC BOX CULV (9 FT X 4 FT)
LF 750.000 $900.000 $858.500 $903.730
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 54.000 $550.000 $818.900 $497.170
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 16.000 $900.000 $1,159.300 $972.390
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 12.000 $750.000 $1,539.500 $952.190
RC PIPE (CL III)(18 IN)
LF 162.000 $100.000 $92.000 $88.920
RC PIPE (CL III)(21 IN)
LF 8.000 $180.000 $106.700 $187.500
RC PIPE (CL III)(24 IN)
LF 1,694.000 $100.000 $103.700 $92.610
RC PIPE (CL III)(30 IN)
LF 37.000 $130.000 $119.900 $174.580
RC PIPE (CL III)(36 IN)
LF 136.000 $150.000 $156.700 $163.310
RC PIPE (CL III)(48 IN)
LF 386.000 $275.000 $243.600 $211.920
RC PIPE (CL IV)(24 IN)
LF 569.000 $165.000 $110.500 $106.680
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,500.000 $2,179.300 $6,851.360
INLET (COMPL)(CURB)(TY C1)(NONE)(HOU)
EA 4.000 $8,500.000 $4,948.300 $12,271.740
INLET (COMPL)(CURB)(TY C1)(LEFT)(HOU)
EA 3.000 $10,000.000 $4,553.100 $14,133.060
INLET (COMPL)(CURB)(TY C1)(RIGHT)(HOU)
EA 3.000 $10,000.000 $4,553.100 $13,010.760
INLET (COMPL)(TY AAD)(HOU)
EA 2.000 $9,000.000 $5,236.900 $8,805.170
MANH (COMPL)(TY A)(HOU)
EA 5.000 $9,000.000 $5,172.400 $7,492.910
JCT BOX (COMPL)(SPL)
EA 2.000 $30,000.000 $20,051.200 $22,713.800
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $25,000.000 $32,410.100 $13,521.310
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $50,000.000 $43,169.400 $13,194.240
WINGWALL (PW - 1) (HW=5 FT)
EA 4.000 $16,000.000 $37,908.200 $18,829.080
WINGWALL (PW - 1) (HW=6 FT)
EA 5.000 $35,000.000 $52,355.200 $20,129.760
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $50,000.000 $20,846.900 $34,622.340
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $60,000.000 $56,670.100 $22,262.450
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C)
EA 4.000 $8,500.000 $5,435.400 $5,238.960
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C)
EA 2.000 $15,000.000 $9,686.800 $10,272.960
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1)(C)
EA 1.000 $25,000.000 $13,742.300 $11,806.620
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,086.300 $1,625.660
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 12.000 $1,700.000 $1,379.600 $1,406.830
SET (TY II) (18 IN) (TP) (4: 1) (C)
EA 2.000 $1,500.000 $1,086.300 $1,625.660
SET (TY II) (18 IN) (TP) (6: 1) (P)
EA 6.000 $1,700.000 $1,379.600 $1,733.940
SET (TY II) (21 IN) (RCP) (4: 1) (C)
EA 1.000 $2,000.000 $1,522.000 $2,024.640
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 7.000 $1,500.000 $1,518.300 $2,024.630
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 69.000 $1,500.000 $2,125.700 $1,915.780
SET (TY II) (24 IN) (TP) (4: 1) (C)
EA 3.000 $1,500.000 $1,522.000 $2,024.640
SET (TY II) (24 IN) (TP) (6: 1) (P)
EA 55.000 $1,500.000 $2,125.800 $2,242.890
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,800.000 $3,892.700 $2,719.170
SET (TY II) (30 IN) (TP) (6: 1) (P)
EA 12.000 $3,800.000 $3,892.700 $2,719.170
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $5,463.100 $3,337.590
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $5,000.000 $7,678.300 $5,202.700
SET (TY II) (36 IN) (TP) (6: 1) (P)
EA 6.000 $5,000.000 $7,678.300 $5,273.550
SET (TY II) (48 IN) (RCP) (4: 1) (C)
EA 6.000 $8,000.000 $8,575.500 $6,155.830
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 6.000 $10,000.000 $13,409.800 $11,196.650
THERMOPLASTIC PIPE (PP) (18")
LF 159.000 $75.000 $78.400 $74.860
THERMOPLASTIC PIPE (PP) (24")
LF 1,663.000 $85.000 $92.100 $75.880
THERMOPLASTIC PIPE (PP) (30")
LF 340.000 $100.000 $112.300 $100.300
THERMOPLASTIC PIPE (PP) (36")
LF 228.000 $115.000 $130.000 $108.340
THERMOPLASTIC PIPE (PP) (48")
LF 32.000 $130.000 $226.400 $183.480
REMOV STR (INLET)
EA 3.000 $715.000 $376.000 $678.590
REMOV STR (MANHOLE)
EA 2.000 $4,000.000 $409.800 $1,254.300
REMOV STR (SET)
EA 123.000 $315.000 $188.000 $470.130
REMOV STR (WINGWALL)
EA 9.000 $1,800.000 $2,178.800 $1,109.270
REMOV STR (PIPE)
LF 2,078.000 $18.000 $16.800 $15.930
REMOV STR (BOX CULVERT)
LF 1,117.000 $50.000 $30.100 $39.060
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $75,000.000 $37,253.200 $43,365.000
MOBILIZATION
LS 1.000 $6,690,000.000 $6,000,000.000 $6,325,471.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $10,000.000 $9,500.000 $13,795.460
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 67.000 $100.000 $160.900 $54.140
TMA (STATIONARY)
DAY 150.000 $225.000 $330.000 $708.750
TMA (MOBILE OPERATION)
HR 300.000 $75.000 $73.900 $106.940
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,195.000 $45.000 $46.600 $35.000
ROCK FILTER DAMS (REMOVE)
LF 2,195.000 $15.000 $15.600 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,792.000 $25.000 $26.400 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 1,792.000 $9.000 $4.600 $15.000
CONSTRUCTION PERIMETER FENCE
LF 3,267.000 $3.000 $5.400 $1.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,220.000 $4.000 $3.300 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,220.000 $1.000 $1.300 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 160.000 $5.000 $5.600 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $2.000 $1.900 $2.000
CONSTRUCTING DETOURS
SY 20,784.000 $90.000 $96.400 $101.540
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 23,550.000 $45.000 $32.100 $44.100
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 32,520.000 $7.000 $12.200 $5.320
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 28,380.000 $12.000 $14.600 $7.010
PERM CTB (SGL SLOPE)(42)(MOD)
LF 1,772.000 $120.000 $97.900 $60.180
CONC CURB (MONO) (TY II)
LF 2,040.000 $5.000 $3.800 $4.090
DRIVEWAYS (CONC)
SY 7,275.000 $100.000 $75.300 $68.950
CONC SIDEWALKS (4")
SY 29,182.000 $55.000 $63.600 $45.840
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 37,634.000 $0.400 $0.900 $1.650
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 25,370.000 $7.000 $0.700 $7.070
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
LF 11,739.000 $7.000 $1.600 $7.070
MTL W-BEAM GD FEN (TIM POST)
LF 976.000 $25.000 $23.700 $25.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 19.000 $2,000.000 $1,706.600 $2,150.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,500.000 $1,699.400 $1,535.000
REMOVE METAL BEAM GUARD FENCE
LF 1,325.000 $4.000 $2.400 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 17.000 $3,300.000 $3,161.600 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 16.000 $300.000 $260.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 89.000 $2,000.000 $3,718.000 $3,750.000
CRASH CUSH ATTEN (REMOVE)
EA 86.000 $1,500.000 $1,872.000 $1,200.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 107.000 $24,000.000 $28,340.000 $24,700.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $550.000 $582.400 $690.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 21.000 $400.000 $262.600 $285.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 2.000 $450.000 $296.400 $355.000
REMOVE RD IL ASM (TRANS-BASE)
EA 1.000 $2,500.000 $387.800 $372.840
CONDT (PVC) (SCH 80) (2")
LF 265.000 $14.000 $12.600 $12.090
CONDT (PVC) (SCH 80) (2") (BORE)
LF 100.000 $25.000 $17.000 $16.390
CONDT (PVC) (SCH 80) (3")
LF 26,085.000 $17.000 $7.400 $7.140
CONDT (PVC) (SCH 80) (3") (BORE)
LF 3,505.000 $25.000 $12.300 $11.790
CONDT (RM) (3")
LF 1,330.000 $60.000 $55.800 $53.690
ITS MULTI-DUCT CND (PVC-80)
LF 25,755.000 $20.000 $15.500 $14.890
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 2,775.000 $30.000 $25.200 $24.250
ITS MULTI-DUCT CND (RMC)
LF 1,330.000 $165.000 $97.400 $93.640
ELEC CONDR (NO.14) INSULATED
LF 28,530.000 $1.100 $0.500 $0.460
ELEC CONDR (NO.6) BARE
LF 1,380.000 $2.500 $1.200 $1.170
ELEC CONDR (NO.4) BARE
LF 145.000 $3.000 $2.300 $2.240
ELEC CONDR (NO.4) INSULATED
LF 290.000 $3.500 $2.700 $2.640
ELEC CONDR (2/0) INSULATED
LF 15.000 $3.000 $17.800 $17.160
ELEC CONDR (3/0) BARE
LF 30.000 $3.500 $11.300 $10.880
TRAY CABLE (4 CONDR) (12 AWG)
LF 775.000 $3.000 $2.600 $2.500
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 137.000 $5,400.000 $4,390.000 $4,221.170
GROUND BOX TY D (162922)W/APRON
EA 12.000 $1,500.000 $1,100.300 $1,057.970
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 2.000 $6,300.000 $7,468.100 $7,180.840
ALUMINUM SIGNS (TY A)
SF 18.000 $50.000 $30.500 $25.990
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 65.000 $650.000 $478.400 $430.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 5.000 $650.000 $650.000 $545.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 18.000 $750.000 $587.600 $545.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-EXAL)
EA 1.000 $850.000 $679.100 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 1.000 $1,200.000 $697.800 $665.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,200.000 $754.000 $735.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 3.000 $1,300.000 $776.900 $805.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $1,400.000 $786.200 $790.000
RELOCATE SM RD SN SUP&AM TY S80
EA 3.000 $800.000 $500.200 $525.000
REMOVE SM RD SN SUP&AM
EA 78.000 $100.000 $72.800 $90.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 45.000 $25.000 $17.700 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 288.000 $30.000 $21.800 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 22.000 $100.000 $101.900 $65.000
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
LF 121.000 $0.500 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 54,593.000 $0.300 $0.400 $0.370
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 1,011.000 $0.700 $0.600 $0.600
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 33.000 $3.000 $4.200 $4.000
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 4.000 $85.000 $88.400 $85.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 4.000 $85.000 $98.800 $95.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 57,855.000 $0.300 $0.400 $0.380
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 1,857.000 $2.000 $1.300 $1.250
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 81,976.000 $1.300 $0.700 $0.650
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,002.000 $2.000 $1.200 $1.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 758.000 $10.000 $8.300 $8.000
WK ZN PAV MRK REMOV (W)(ARROW)
EA 27.000 $175.000 $192.400 $185.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 25.000 $175.000 $197.600 $190.000
WK ZN PAV MRK REMOV (W)36"(YLD TRI)
EA 35.000 $50.000 $36.400 $35.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 970.000 $2.000 $1.400 $1.350
WK ZN PAV MRK REMOV (Y)6"(DOT)
LF 320.000 $1.500 $2.100 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 88,505.000 $1.300 $0.700 $0.650
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 470.000 $2.500 $1.600 $1.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,940.000 $1.500 $1.500 $1.400
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 510.000 $5.000 $3.100 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,224.000 $8.000 $8.300 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 27.000 $150.000 $171.600 $165.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 17.000 $150.000 $171.600 $165.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 640.000 $4.000 $3.100 $3.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 13,255.000 $1.000 $1.000 $0.980
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 13,255.000 $0.800 $1.100 $1.100
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 59,750.000 $0.700 $0.900 $0.900
TY I HIGH PERF PM (Y)6"(BRK)(100MIL)
LF 11,250.000 $0.800 $1.100 $1.100
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 69,984.000 $0.700 $0.900 $0.900
PAVEMENT SLER 6"
LF 167,494.000 $0.100 $0.300 $0.300
PAVEMENT SLER 8"
LF 4,410.000 $0.200 $0.600 $0.600
PAVEMENT SLER 12"
LF 1,150.000 $0.400 $0.900 $0.900
PAVEMENT SLER 24"
LF 1,224.000 $0.600 $1.200 $1.200
PAVEMENT SLER (ARROW)
EA 27.000 $15.000 $15.600 $15.000
PAVEMENT SLER (WORD)
EA 17.000 $15.000 $15.600 $15.000
REFL PAV MRKR TY I-C
EA 988.000 $6.000 $5.000 $4.800
REFL PAV MRKR TY II-A-A
EA 2,050.000 $6.000 $5.000 $4.800
ELIM EXT PM & MRKS (4")
LF 126,270.000 $0.400 $0.300 $0.300
ELIM EXT PM & MRKS (6")
LF 8,500.000 $0.500 $0.400 $0.400
ELIM EXT PM & MRKS (7")
LF 1,990.000 $1.000 $0.600 $0.450
ELIM EXT PM & MRKS (8")
LF 3,220.000 $0.700 $0.800 $0.560
ELIM EXT PM & MRKS (12")
LF 420.000 $1.250 $1.600 $1.100
ELIM EXT PM & MRKS (24")
LF 340.000 $2.500 $3.100 $2.200
ELIM EXT PM & MRKS (ARROW)
EA 23.000 $50.000 $62.400 $35.000
ELIM EXT PM & MRKS (WORD)
EA 21.000 $50.000 $78.000 $75.000
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 25.000 $20.000 $18.700 $75.000
PAV SURF PREP FOR MRK (6")
LF 167,494.000 $0.050 $0.100 $0.030
PAV SURF PREP FOR MRK (8")
LF 4,410.000 $0.080 $0.100 $0.040
PAV SURF PREP FOR MRK (12")
LF 1,150.000 $0.200 $0.200 $0.060
PAV SURF PREP FOR MRK (24")
LF 1,224.000 $0.300 $0.300 $0.240
PAV SURF PREP FOR MRK (ARROW)
EA 27.000 $10.000 $15.600 $9.000
PAV SURF PREP FOR MRK (WORD)
EA 17.000 $10.000 $26.000 $9.000
PAV SURF PREP FOR MRK (RPM)
EA 3,038.000 $0.500 $0.300 $0.500
INSTALL HWY TRF SIG (SYSTEM)
EA 2.000 $40,000.000 $31,632.600 $30,415.960
REMOVING TRAFFIC SIGNALS
EA 2.000 $5,000.000 $6,700.500 $6,442.790
TEMP TRAF SIGNALS
EA 2.000 $60,000.000 $86,458.400 $83,133.090
VEH SIG SEC (12")LED(GRN)
EA 15.000 $300.000 $304.200 $292.540
VEH SIG SEC (12")LED(GRN ARW)
EA 3.000 $300.000 $304.200 $292.540
VEH SIG SEC (12")LED(YEL)
EA 19.000 $300.000 $304.200 $292.540
VEH SIG SEC (12")LED(YEL ARW)
EA 4.000 $300.000 $304.200 $292.540
VEH SIG SEC (12")LED(RED)
EA 15.000 $300.000 $304.200 $292.540
VEH SIG SEC (12")LED(RED ARW)
EA 5.000 $300.000 $304.200 $292.540
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $800.000 $816.400 $784.990
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 15.000 $230.000 $200.600 $192.910
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 3.000 $200.000 $229.200 $220.430
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 2,545.000 $2.000 $1.200 $1.140
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 1,990.000 $2.250 $1.800 $1.700
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 925.000 $3.000 $2.700 $2.570
TRF SIG CBL (TY A)(12 AWG)(18 CONDR)
LF 1,325.000 $3.000 $4.000 $3.870
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $8,000.000 $6,570.600 $6,317.930
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $450.000 $1,328.600 $1,277.510
INS TRF SIG PL AM(S)1 ARM(40')
EA 3.000 $14,000.000 $14,821.700 $14,251.660
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $18,000.000 $18,621.800 $17,905.550
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 2.000 $35,000.000 $33,883.800 $32,580.580
INS TRF SIG PL AM(S)1 ARM(60')LUM
EA 1.000 $45,000.000 $35,136.700 $33,785.310
PED POLE ASSEMBLY
EA 13.000 $2,500.000 $2,949.600 $2,836.150
PED DETECT PUSH BUTTON (APS)
EA 14.000 $1,200.000 $974.500 $937.050
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,300.000 $3,810.800 $3,664.270
INSTL VID IMAGE VEH DET SYS (VIVDS)
EA 2.000 $5,000.000 $586.800 $564.260
INSTALL BBU SYSTEM
EA 2.000 $9,000.000 $9,114.300 $8,763.710
VIVDS CABLE (INSTALL)
LF 1,550.000 $3.000 $0.500 $0.490
VIVDS CAMERA (INSTALL)
EA 12.000 $1,000.000 $429.900 $413.350
FULL - WIDTH MOWING
CYC 9.000 $2,500.000 $2,387.800 $3,600.120
LITTER REMOVAL
CYC 9.000 $1,200.000 $1,716.600 $834.890
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 36.000 $1,200.000 $858.300 $1,551.490
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 36.000 $1,600.000 $858.300 $2,032.800
WIDE FLANGE PAVEMENT TERMINALS
LF 306.000 $500.000 $640.100 $438.370
WATER MAIN PIPE (PVC)(C900)(12 IN)
LF 1,713.000 $80.000 $108.200 $161.000
WTR MAIN PIPE (PVC)(RESTRAINED JT)12IN
LF 800.000 $310.000 $149.300 $184.000
CASING STEEL (20 IN)
LF 89.000 $315.000 $218.200 $176.500
WET CONNECTION (12 IN)
EA 8.000 $2,500.000 $3,418.800 $2,159.000
JCK TUN BOR OR AUG CSG (STL)(20 IN)
LF 196.000 $400.000 $1,366.100 $447.000
REMOVE EXIST WATER PIPE (12 IN)
LF 2,267.000 $30.000 $13.400 $9.000
Totals: $73,558,885.900 $63,793,851.716 $63,921,335.979