MONTGOMERY SH 75 (0110-04-129)

Items: 67

County: MONTGOMERY
Length: N/A
Highway: SH 75
District: HOUSTON
Control Number: 0110-04-129
DBE Goal: N/A
Project: STP 1702(807)MM
Guaranty: N/A
Time: 53 WORKING DAYS
Engineer's Estimate: $1,447,452.75
Date: 08/09/2017 (8 years ago)
Contract Number: N/A
Type: WIDEN 2 LANES TO 4 LANES UNDIVIDED
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,447,452.75
$1,126,255.63
Over/Under Est: -22.19% -$321,197.12
Over/Under Est: -19.31% -$279,544.38
Amt Left: 3.7% $41,652.74
Over/Under Est: -6.34% -$91,723.20
Amt Left: 20.37% $229,473.92
Delta: -16.08% -$187,821.18

Bid Items & Bid Tabulations

67 Total 0 of 67
MONTGOMERY  |  SH 75  |  HOUSTON  |  0110-04-129  |  08/09/2017  |  $1,447,452.75  |  STP 1702(807)MM  |  WIDEN 2 LANES TO 4 LANES UNDIVIDED  |  53 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SMITH & COMPANY
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
ANGEL BROTHERS HOLDINGS CORP.
PREPARING ROW
STA 37.990 $1,700.000 $150.000 $450.000 $300.000
EXCAVATION (ROADWAY)
CY 1,020.000 $9.750 $15.000 $22.500 $20.000
SUBGRADE WIDENING (ORD COMP)
STA 37.990 $750.000 $100.000 $400.000 $1,200.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 314.000 $20.000 $10.000 $26.750 $16.000
BACKFILL (TY A)
STA 37.990 $220.000 $244.000 $350.000 $350.000
BLOCK SODDING
SY 8,125.000 $2.800 $4.000 $4.000 $3.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 8,125.000 $0.150 $0.330 $0.320 $0.850
FERTILIZER
AC 3.400 $700.000 $867.000 $850.000 $800.000
VEGETATIVE WATERING
MG 402.900 $17.500 $10.000 $5.000 $27.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 1,208.000 $65.000 $65.000 $75.000 $79.000
SALV, HAUL & STKPL RCL APH PV (4 TO 8")
SY 2,842.000 $3.000 $4.000 $5.500 $5.000
PRIME COAT & BLOTTER (MC-30)
GAL 5,421.000 $4.500 $3.500 $0.500 $4.000
ASPH (MULTI OPTION)
GAL 8,386.000 $4.000 $2.300 $2.750 $2.750
AGGR(TY-PB GR-4 SAC-B)
CY 210.000 $100.000 $94.000 $112.000 $165.000
D-GR HMA TY-D PG70-22
TON 2,690.000 $85.000 $71.000 $72.000 $88.000
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 2,690.000 $75.000 $71.000 $72.000 $73.250
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,097.000 $25.000 $49.000 $36.000 $30.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,564.000 $25.000 $2.500 $1.500 $3.750
PLANE ASPH CONC PAV(2" TO 4")
SY 19,516.000 $2.600 $2.350 $1.500 $2.500
CEM STABIL BKFL
CY 106.000 $40.000 $127.000 $125.000 $134.000
RIPRAP (MOW STRIP)(4 IN)
CY 70.000 $500.000 $500.000 $500.000 $535.000
CONC BOX CULV (3 FT X 3 FT)
LF 131.000 $125.000 $295.000 $290.000 $310.000
RC PIPE (CL III)(18 IN)
LF 32.000 $60.000 $76.000 $75.000 $80.000
RC PIPE (CL III)(24 IN)
LF 8.000 $60.000 $153.000 $150.000 $160.000
WINGWALL (FW - 0) (HW=3 FT)
EA 2.000 $11,000.000 $3,570.000 $3,500.000 $3,800.000
WINGWALL (FW - 0) (HW=4 FT)
EA 1.000 $11,000.000 $5,100.000 $5,000.000 $5,300.000
WINGWALL (FW - 0) (HW=5 FT)
EA 1.000 $12,000.000 $6,120.000 $6,000.000 $6,400.000
ADJUSTING MANHOLES
EA 5.000 $500.000 $510.000 $1,250.000 $1,350.000
REMOV STR (SET)
EA 5.000 $1,000.000 $1,020.000 $500.000 $525.000
REMOV STR (WINGWALL)
EA 4.000 $1,200.000 $1,020.000 $1,000.000 $1,100.000
REMOV STR (BOX CULVERT)
LF 112.000 $40.000 $76.000 $75.000 $80.000
MOBILIZATION
LS 1.000 $150,000.000 $29,000.000 $65,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $4,200.000 $600.000 $4,000.000 $3,700.000
CONSTRUCTION PERIMETER FENCE
LF 3,741.000 $5.500 $2.000 $2.000 $3.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 646.000 $6.000 $3.500 $3.500 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 646.000 $1.000 $1.000 $1.000 $2.500
INTERSECTIONS (ACP)
SY 637.000 $70.000 $35.000 $28.300 $24.000
DRIVEWAYS (CONC)
SY 616.000 $75.000 $100.000 $100.000 $65.000
DRIVEWAYS (ACP)
SY 1,001.000 $70.000 $37.000 $28.300 $33.000
MTL W-BEAM GD FEN (TIM POST)
LF 612.500 $25.000 $20.000 $19.450 $21.000
SHORT RADIUS
LF 200.000 $50.000 $25.550 $25.050 $27.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,500.000 $2,210.000 $2,166.000 $2,300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $475.000 $300.000 $280.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $575.000 $475.000 $545.000 $600.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $700.000 $449.000 $545.000 $600.000
REMOVE SM RD SN SUP&AM
EA 28.000 $125.000 $77.000 $75.000 $80.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 52,488.000 $0.200 $0.170 $0.170 $0.200
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 300.000 $0.300 $0.310 $0.300 $0.300
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 1.000 $50.000 $51.000 $50.000 $55.000
WK ZN PAV MRK NON-REMOV (W)(SYMBOL)
EA 1.000 $50.000 $51.000 $50.000 $55.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 1.000 $50.000 $82.000 $80.000 $90.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,180.000 $0.150 $0.180 $0.180 $0.200
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $1.500 $1.000 $1.000 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 21.000 $5.250 $6.000 $6.000 $6.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $125.000 $153.000 $150.000 $160.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $125.000 $184.000 $180.000 $200.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,060.000 $0.450 $0.560 $0.550 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 8,308.000 $0.400 $0.510 $0.500 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 9,188.000 $0.400 $0.510 $0.500 $0.550
REFL PAV MRKR TY I-C
EA 5.000 $5.000 $4.000 $4.000 $4.250
REFL PAV MRKR TY II-A-A
EA 295.000 $4.500 $4.000 $4.000 $4.250
PAV SURF PREP FOR MRK (6")
LF 19,556.000 $0.050 $0.040 $0.040 $0.050
PAV SURF PREP FOR MRK (8")
LF 100.000 $0.050 $0.100 $0.100 $0.110
PAV SURF PREP FOR MRK (24")
LF 21.000 $0.300 $0.260 $0.250 $0.300
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $6.000 $15.000 $15.000 $16.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $6.000 $15.000 $15.000 $16.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $50.000 $55.000 $60.000 $80.000
Totals: $1,447,452.750 $1,126,255.630 $1,167,908.375 $1,355,729.550