MONTGOMERY SH 75 (0110-03-085)

Items: 53

County: MONTGOMERY
Length: N/A
Highway: SH 75
District: HOUSTON
Control Number: 0110-03-085
DBE Goal: N/A
Project: F 2023(184)
Guaranty: N/A
Time: 53 WORKING DAYS
Engineer's Estimate: $4,005,728.01
Date: 11/03/2022 (3 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
MATTHEW CONNELLY
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$4,005,728.01
Over/Under Est: -13.73% -$549,934.42
Over/Under Est: -4.73% -$189,597.63
Amt Left: 10.43% $360,336.79
Over/Under Est: 5.26% $210,591.89
Amt Left: 22.01% $760,526.31
Delta: -10.49% -$400,189.52

Bid Items & Bid Tabulations

53 Total 0 of 53
MONTGOMERY  |  SH 75  |  HOUSTON  |  0110-03-085  |  11/03/2022  |  $4,005,728.01  |  F 2023(184)  |  SURF/ROADWAY RESTOR  |  53 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
FORDE CONSTRUCTION COMPANY, INC.
BACKFILL (TY A)
STA 54.000 $600.000 $397.270 $284.000 $325.000
ASPH (MULTI OPTION)
GAL 19,723.000 $4.250 $4.180 $3.000 $4.500
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 475.000 $146.000 $170.160 $150.000 $335.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(18")
SY 14,000.000 $132.000 $108.000 $149.800 $135.000
PLANE ASPH CONC PAV (2")
SY 68,635.000 $2.100 $1.000 $2.750 $2.350
RIPRAP (MOW STRIP)(4 IN)
CY 2.000 $561.000 $3,948.860 $2,000.000 $3,500.000
MOBILIZATION
LS 1.000 $364,157.180 $343,131.000 $50,000.000 $320,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $7,000.000 $1,476.640 $1,500.000 $35,000.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 232.000 $5.300 $6.780 $3.150 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 232.000 $1.910 $2.070 $1.600 $4.000
INTERSECTIONS (ACP)
SY 4,334.000 $35.000 $23.670 $35.400 $27.000
DRIVEWAYS (ACP)
SY 2,671.000 $35.000 $25.110 $33.500 $53.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $27.500 $30.640 $26.000 $30.000
REMOVE METAL BEAM GUARD FENCE
LF 117.000 $3.000 $3.530 $3.000 $3.400
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,212.000 $3,414.880 $2,900.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $396.000 $176.630 $150.000 $168.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 35.000 $22.000 $64.770 $24.000 $58.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 24.000 $48.000 $58.880 $50.000 $53.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $550.000 $647.650 $460.000 $583.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 26.000 $720.000 $765.400 $625.000 $690.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,088.000 $1,177.550 $845.000 $105.000
REMOVE SM RD SN SUP&AM
EA 44.000 $78.000 $35.330 $65.000 $570.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 7,973.000 $0.340 $0.410 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 42,696.000 $0.300 $0.410 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 4,161.000 $2.450 $4.710 $1.550 $4.250
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 60.000 $64.000 $123.640 $65.000 $75.000
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
EA 6.000 $105.000 $141.310 $85.000 $95.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 27.000 $86.000 $153.080 $65.000 $85.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 7,910.000 $0.300 $0.410 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 69,594.000 $0.270 $0.410 $0.280 $0.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 993.000 $1.050 $1.300 $1.100 $0.950
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,387.000 $6.910 $7.070 $6.000 $6.800
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 2,688.000 $0.860 $0.880 $1.550 $0.800
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 2,658.000 $0.680 $0.730 $0.550 $0.600
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 11,544.000 $0.540 $0.730 $0.550 $0.600
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 2,637.000 $0.910 $0.730 $0.600 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 23,198.000 $0.490 $0.730 $0.600 $0.600
PREFAB PAV MRK TY C (W) (ARROW)
EA 20.000 $202.000 $322.860 $225.000 $238.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $418.000 $386.180 $550.000 $424.000
PREFAB PAV MRK TY C (W) (WORD)
EA 9.000 $243.000 $338.210 $335.000 $318.000
REFL PAV MRKR TY I-C
EA 191.000 $5.610 $7.070 $5.000 $5.300
REFL PAV MRKR TY II-A-A
EA 815.000 $5.660 $7.070 $5.000 $5.300
PAV SURF PREP FOR MRK (6")
LF 42,725.000 $0.030 $0.010 $0.010 $0.050
PAV SURF PREP FOR MRK (8")
LF 993.000 $0.060 $0.010 $0.020 $0.100
PAV SURF PREP FOR MRK (24")
LF 1,387.000 $0.190 $0.010 $0.050 $2.100
PAV SURF PREP FOR MRK (ARROW)
EA 20.000 $6.500 $0.010 $5.000 $11.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $9.200 $0.010 $15.000 $11.000
PAV SURF PREP FOR MRK (WORD)
EA 9.000 $10.250 $0.010 $5.000 $11.000
D-GR HMA TY-D SAC-A PG70-22
TON 6,778.000 $150.000 $139.820 $138.000 $140.000
TACK COAT
GAL 6,778.000 $3.200 $2.560 $0.010 $3.700
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 32.000 $59.000 $96.370 $130.000 $250.000
TMA (STATIONARY)
DAY 9.000 $193.000 $500.000 $450.000 $750.000
TMA (MOBILE OPERATION)
HR 16.000 $118.000 $25.000 $85.000 $100.000
Totals: $4,005,728.010 $3,455,793.590 $3,816,130.380 $4,216,319.900