Show Job Controls
Bid Cobra

MITCHELL CR (0908-21-039)

Items: 35

County: MITCHELL
Length: N/A
Highway: CR
District: ABILENE
Control Number: 0908-21-039
DBE Goal: N/A
Project: BR 2B20(209)
Guaranty: N/A
Time: 84 WORKING DAYS
Engineer's Estimate: $611,977.65
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$611,977.65
$711,084.00
Over/Under Est: 16.19% $99,106.35
Over/Under Est: 27.54% $168,533.35
Amt Left: 9.76% $69,427.00

Bid Items & Bid Tabulations

35 Total 0 of 35
MITCHELL  |  CR  |  ABILENE  |  0908-21-039  |  06/01/2023  |  $611,977.65  |  BR 2B20(209)  |  BRIDGE REPL  |  84 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DELGADO'S CONTRACTORS, LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
PREPARING ROW
AC 1.000 $15,000.000 $2,250.000 $10,000.000
EXCAVATION (ROADWAY)
CY 107.000 $25.000 $35.000 $77.250
EXCAVATION (CHANNEL)
CY 332.000 $25.000 $35.000 $40.950
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 160.000 $25.000 $85.000 $77.250
BLADING
HR 16.000 $200.000 $250.000 $230.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 379.000 $1.350 $2.000 $5.150
VEGETATIVE WATERING
MG 7.000 $75.000 $250.000 $380.000
FL BS (CMP IN PLC)(TY A OR B GR 4)(6")
SY 445.000 $64.000 $55.000 $59.500
CEM STABIL BKFL
CY 49.000 $400.000 $325.000 $407.000
DRILL SHAFT (30 IN)
LF 180.000 $350.000 $600.000 $565.000
CL C CONC (ABUT)
CY 27.200 $1,400.000 $2,000.000 $1,910.000
CL C CONC (RAIL FOUNDATION)
CY 31.800 $650.000 $1,200.000 $695.000
REINF CONC SLAB (BOX BEAM)
SF 1,309.000 $32.000 $35.000 $47.000
PRESTR CONC BOX BEAM (4B20)
LF 200.000 $325.000 $400.000 $500.000
PRESTR CONC BOX BEAM (5B20)
LF 100.000 $325.000 $420.000 $500.000
RIPRAP (CONC)(5 IN)
CY 30.000 $600.000 $700.000 $1,150.000
ELASTOMERIC BEARING (LAMINATED)
EA 18.000 $1,500.000 $300.000 $50.000
RAIL (TY T223)
LF 225.300 $200.000 $200.000 $195.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 53.000 $300.000 $250.000 $300.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $50,000.000 $30,000.000 $50,000.000
MOBILIZATION
LS 1.000 $53,304.000 $100,000.000 $78,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $2,500.000 $4,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 170.000 $4.500 $7.000 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 170.000 $1.000 $1.000 $11.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 382.000 $10.000 $10.000 $12.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 382.000 $2.000 $3.000 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000 $30.000 $35.000 $36.250
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,500.000 $1,400.000 $1,875.000
REMOVE METAL BEAM GUARD FENCE
LF 50.000 $3.500 $5.000 $12.500
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $290.000 $350.000 $315.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $4,000.000 $3,625.000
WIRE FENCE (TY A)
LF 160.000 $20.000 $20.000 $62.650
REMOVE SM RD SN SUP&AM
EA 2.000 $120.000 $100.000 $500.000
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
EA 6.000 $55.000 $50.000 $190.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $55.000 $50.000 $40.000
Totals: $611,977.650 $711,084.000 $780,511.000