MITCHELL IH 20 (0006-01-107)

Items: 37

County: MITCHELL
Length: N/A
Highway: IH 20
District: ABILENE
Control Number: 0006-01-107
DBE Goal: N/A
Project: F 2024(169)
Guaranty: N/A
Time: 88 WORKING DAYS
Engineer's Estimate: $10,526,276.25
Date: 10/06/2023 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
RYAN SAYLES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$10,526,276.25
1
$10,261,309.24
Over/Under Est: -2.52% -$264,967.01
Subcontractor Percentage Amount
HJC FARMS, INC. 3.55% $364,276.48
DOUBLE A CONTRACTING, L.P. 2.43% $249,349.81
TEXOP CONSTRUCTION 2.28% $233,957.85
CHEROKEE SERVICES 1.87% $191,886.48
PRIMATE CONSTRUCTION, LP 1.56% $160,076.42
WEST TEXAS ROCK RESOURCES, LLC 0.38% $38,992.98
CONTRACTORS SERVICE, LTD. 0.36% $36,940.71
Total: 12.43% $1,275,480.73

Bid Items & Bid Tabulations

37 Total 0 of 37
MITCHELL  |  IH 20  |  ABILENE  |  0006-01-107  |  10/06/2023  |  $10,526,276.25  |  F 2024(169)  |  PREVENT MAINT  |  88 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RK HALL, LLC
BACKFILL (TY B)
STA 2,306.090 $165.000 $25.000
FOG SEAL (CSS-1H)
GAL 9,966.000 $4.500 $5.920
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 100.000 $400.000 $176.000
PLANE ASPH CONC PAV (1.5")
SY 422,882.000 $2.000 $1.980
CLEANING AND SEALING EXISTING JOINTS
LF 1,120.000 $25.000 $43.690
HEADER TYPE EXPANSION JOINT
CF 269.000 $450.000 $417.850
JOINT SEALANT
LF 403.000 $38.000 $16.010
MOBILIZATION
LS 1.000 $956,934.000 $463,781.050
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $10,000.000 $30,000.000
RUMBLE STRIPS (SHOULDER)
LF 219,080.000 $0.200 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 9,550.000 $29.700 $26.950
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,300.000 $2,447.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,400.000 $1,595.000
MTL BM GD FEN TRANS (NON - SYM)
EA 4.000 $1,150.000 $1,138.500
REMOVE METAL BEAM GUARD FENCE
LF 9,550.000 $2.500 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $275.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $250.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,000.000 $4,981.210
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $240.000 $110.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 85.000 $28.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 15.000 $20.000 $22.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 8,648.000 $1.000 $4.480
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 12,721.000 $1.000 $1.120
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 10,234.000 $1.100 $1.160
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 6,444.000 $1.000 $3.030
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 28,830.000 $1.000 $0.740
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 117,992.000 $1.000 $0.740
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 120,309.000 $1.000 $0.740
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,872.000 $1.000 $3.850
PREFAB PAV MRK TY C (W) (NUMBER)
EA 19.000 $350.000 $275.000
REFL PAV MRKR TY II-C-R
EA 2,992.000 $4.000 $4.680
D-GR HMA TY-D SAC-B PG70-22
TON 10,570.000 $148.000 $145.680
TACK COAT
GAL 49,165.000 $5.000 $5.590
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 30,941.000 $175.000 $188.290
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $10,000.000 $14,000.000
TMA (STATIONARY)
DAY 90.000 $300.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 16.000 $700.000 $1,000.000
Totals: $10,526,276.250 $10,261,309.240