MILLS FM 1047 (1780-01-009)

Items: 59

County: MILLS
Length: N/A
Highway: FM 1047
District: BROWNWOOD
Control Number: 1780-01-009
DBE Goal: N/A
Project: BR 2022(304)
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $1,491,346.00
Date: 03/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$1,491,346.00
$1,685,450.98
Over/Under Est: 13.02% $194,104.98
Over/Under Est: 16.26% $242,539.20
Amt Left: 2.87% $48,434.22
Over/Under Est: 18.13% $270,440.00
Amt Left: 4.53% $76,335.02
Delta: -1.61% -$27,900.80
Over/Under Est: 32.66% $487,040.56
Amt Left: 17.38% $292,935.58
Delta: -12.29% -$216,600.56
$2,102,866.20
Over/Under Est: 41% $611,520.20
Amt Left: 24.77% $417,415.22
Delta: -6.29% -$124,479.64

Bid Items & Bid Tabulations

59 Total 0 of 59
MILLS  |  FM 1047  |  BROWNWOOD  |  1780-01-009  |  03/04/2022  |  $1,491,346.00  |  BR 2022(304)  |  BRIDGE REPL  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ACME BRIDGE COMPANY, INC.
KNIFE RIVER CORPORATION - SOUTH
HODGES AND SON CONSTRUCTION COMPANY, INC.
JAMES CONSTRUCTION GROUP, LLC
FNF CONSTRUCTION, INC.
PREPARING ROW
STA 11.000 $2,000.000 $3,290.000 $2,030.000 $3,500.000 $17,000.000 $450.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 6.000 $2,000.000 $1,090.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000
PREPARING ROW (TREE) (36" TO 48" DIA)
EA 1.000 $4,000.000 $4,840.000 $2,400.000 $2,000.000 $2,000.000 $2,000.000
REMOVING CONC (RIPRAP)
SY 776.000 $9.000 $14.000 $15.000 $15.000 $25.000 $25.000
REMOVE CONC (MISC)
EA 1.000 $2,500.000 $1,080.000 $1,500.000 $5,000.000 $2,500.000 $5,000.000
EXCAVATION (ROADWAY)
CY 187.000 $20.000 $19.660 $20.000 $30.000 $16.770 $8.000
EXCAVATION (CHANNEL)
CY 2,362.000 $20.000 $14.100 $11.000 $15.000 $4.040 $7.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,852.000 $15.000 $9.800 $8.000 $30.000 $7.840 $17.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 4,710.000 $0.200 $0.530 $0.500 $0.500 $0.460 $0.520
BROADCAST SEED (TEMP) (WARM)
SY 2,355.000 $0.200 $0.640 $0.650 $1.000 $0.650 $0.620
BROADCAST SEED (TEMP) (COOL)
SY 2,355.000 $0.200 $0.640 $0.650 $1.000 $0.650 $0.620
VEGETATIVE WATERING
MG 106.000 $25.000 $54.600 $10.000 $1.000 $20.000 $105.000
SOIL RETENTION BLANKETS (CL 2) (TY G)
SY 494.000 $3.000 $4.150 $2.500 $3.000 $2.000 $4.500
PROOF ROLLING
HR 4.000 $200.000 $77.700 $70.000 $1.000 $118.330 $80.000
CEM STABIL BKFL
CY 94.000 $230.000 $275.000 $298.000 $250.000 $225.150 $350.000
DRILL SHAFT (36 IN)
LF 667.000 $195.000 $220.000 $265.000 $210.000 $189.980 $300.000
CL C CONC (ABUT)
CY 47.000 $1,100.000 $1,140.000 $1,250.000 $1,200.000 $1,500.000 $1,900.000
CL C CONC (BENT)
CY 28.600 $1,200.000 $1,250.000 $1,250.000 $1,200.000 $1,400.000 $2,400.000
CL C CONC (COLUMN)
CY 25.400 $1,100.000 $1,290.000 $1,050.000 $1,200.000 $1,470.000 $2,450.000
REINF CONC SLAB
SF 6,120.000 $21.000 $27.000 $28.000 $26.000 $27.880 $29.500
APPROACH SLAB
CY 61.200 $600.000 $700.000 $620.000 $650.000 $750.130 $700.000
PRESTR CONC GIRDER (TX46)
LF 714.000 $230.000 $264.000 $350.000 $325.000 $220.010 $350.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,120.000 $110.000 $142.000 $130.000 $125.000 $168.010 $250.000
RAIL (TY T223)
LF 404.000 $115.000 $103.000 $135.000 $130.000 $78.880 $105.000
ARMOR JOINT (SEALED)
LF 136.000 $150.000 $90.310 $90.000 $100.000 $76.870 $110.000
GABIONS (3' X 3')(GALV)
CY 397.000 $220.000 $284.000 $292.000 $250.000 $313.130 $250.000
GABION (1.5' X 3')(GALV)
CY 69.000 $220.000 $331.000 $342.000 $250.000 $317.750 $300.000
SET (TY II) (36 IN) (CMP) (3: 1) (C)
EA 1.000 $3,000.000 $3,160.000 $3,800.000 $3,000.000 $5,068.710 $3,500.000
SET (TY II) (36 IN) (CMP) (4: 1) (C)
EA 1.000 $3,000.000 $3,980.000 $4,000.000 $3,000.000 $5,413.070 $3,700.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $30,000.000 $50,100.000 $60,000.000 $80,000.000 $200,000.000 $84,500.000
REMOVE STR (PILING)
LF 40.000 $150.000 $96.900 $50.000 $150.000 $62.000 $400.000
MOBILIZATION
LS 1.000 $145,000.000 $149,000.000 $172,000.000 $155,000.000 $195,000.000 $210,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $4,500.000 $4,180.000 $1,700.000 $3,500.000 $1,590.000 $3,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 110.000 $35.000 $42.400 $45.000 $1.000 $30.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 110.000 $10.000 $10.600 $11.000 $1.000 $9.370 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,240.000 $5.000 $3.950 $4.000 $1.000 $2.100 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,240.000 $1.000 $1.050 $0.900 $1.000 $0.900 $1.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 100.000 $6.000 $7.400 $5.200 $8.000 $4.670 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.000 $1.050 $2.000 $1.000 $2.000 $3.000
MTL W-BEAM GD FEN (STEEL POST)
LF 300.000 $25.000 $36.000 $37.000 $35.000 $34.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,800.000 $3,270.000 $3,200.000 $2,500.000 $2,500.000 $3,000.000
REMOVE METAL BEAM GUARD FENCE
LF 370.000 $3.000 $2.100 $6.000 $2.000 $2.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,700.000 $3,230.000 $3,300.000 $3,500.000 $3,050.000 $4,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $420.000 $583.000 $600.000 $800.000 $550.000 $850.000
REMOVE SM RD SN SUP&AM
EA 12.000 $100.000 $21.200 $50.000 $100.000 $20.000 $110.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $25.000 $20.100 $22.000 $30.000 $19.000 $23.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $50.000 $25.400 $27.000 $30.000 $24.000 $45.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 2.000 $60.000 $106.000 $110.000 $150.000 $24.000 $90.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 54.000 $2.000 $1.850 $1.000 $1.000 $1.000 $2.200
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 2,315.000 $0.500 $1.300 $1.390 $2.500 $1.250 $2.200
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,315.000 $0.500 $1.300 $1.390 $2.500 $1.250 $2.200
REFL PAV MRKR TY II-A-A
EA 27.000 $4.000 $8.500 $9.000 $20.000 $8.000 $13.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 80.000 $5.000 $2.100 $2.250 $5.000 $2.000 $3.500
D-GR HMA TY-B PG64-22
TON 1,470.000 $125.000 $133.000 $115.000 $140.000 $125.010 $115.000
TACK COAT
GAL 324.000 $5.000 $9.900 $3.000 $15.000 $11.090 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $120.000 $232.000 $200.000 $150.000 $223.320 $40.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $40.000 $8.500 $9.000 $20.000 $8.000 $90.000
TMA (STATIONARY)
DAY 10.000 $200.000 $131.000 $5.000 $200.000 $711.840 $500.000
TMA (MOBILE OPERATION)
DAY 3.000 $200.000 $408.000 $50.000 $100.000 $1,079.140 $1,000.000
Totals: $1,491,346.000 $1,685,450.980 $1,733,885.200 $1,761,786.000 $1,978,386.566 $2,102,866.200