MILLS US 84 (0054-09-042)

Items: 28

County: MILLS
Length: N/A
Highway: US 84
District: BROWNWOOD
Control Number: 0054-09-042
DBE Goal: N/A
Project: F 2022(611)
Guaranty: N/A
Time: 90 WORKING DAYS
Engineer's Estimate: $564,505.00
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: INSTALL FLASHING BEACON
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$564,505.00
$501,967.00
Over/Under Est: -11.08% -$62,538.00
Over/Under Est: 64.35% $363,267.64
Amt Left: 84.83% $425,805.64

Bid Items & Bid Tabulations

28 Total 0 of 28
MILLS  |  US 84  |  BROWNWOOD  |  0054-09-042  |  06/01/2022  |  $564,505.00  |  F 2022(611)  |  INSTL FLASHING BEACON  |  90 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 9.000 $100.000 $200.000 $1,575.000
FLOWABLE BACKFILL
CY 29.000 $250.000 $250.000 $787.500
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $260.000 $250.000 $401.000
RIPRAP (CONC) (CL B) (4")
CY 1.400 $800.000 $675.000 $2,175.000
MOBILIZATION
LS 1.000 $65,000.000 $50,000.000 $93,363.980
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,000.000 $3,000.000 $15,613.670
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $12.000 $1.000 $11.200
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $5.000 $1.000 $4.630
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 4.000 $5,000.000 $6,000.000 $6,268.400
CONDT (PVC) (SCH 80) (3")
LF 1,246.000 $23.000 $25.000 $32.370
CONDT (PVC) (SCH 80) (3") (BORE)
LF 440.000 $32.000 $28.000 $45.810
ELEC CONDR (NO.8) BARE
LF 2,603.000 $1.200 $2.000 $2.540
ELEC CONDR (NO.8) INSULATED
LF 5,206.000 $1.400 $2.250 $2.660
GROUND BOX TY A (122311)W/APRON
EA 15.000 $1,500.000 $1,100.000 $1,915.500
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $7,700.000 $6,500.000 $11,235.500
ALUMINUM SIGNS (TY A)
SF 394.500 $30.000 $35.000 $53.110
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $900.000 $675.000 $908.330
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 24.000 $850.000 $850.000 $1,343.110
REMOVE SM RD SN SUP&AM
EA 20.000 $150.000 $500.000 $555.000
VEH SIG SEC (12")LED(YEL)
EA 16.000 $350.000 $300.000 $491.250
VEH SIG SEC (12")LED(RED)
EA 26.000 $350.000 $300.000 $491.250
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 11.000 $6,500.000 $5,000.000 $8,460.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 10.000 $9,000.000 $7,000.000 $10,020.000
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 2.000 $2,000.000 $500.000 $1,850.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 480.000 $20.000 $35.000 $94.730
TMA (STATIONARY)
DAY 10.000 $350.000 $200.000 $547.000
LEAD LED CHEVRON
EA 2.000 $6,000.000 $6,500.000 $10,850.000
LED CHEVRON
EA 32.000 $2,700.000 $2,500.000 $5,147.500
Totals: $564,505.000 $501,967.000 $927,772.645