MILAM FM 485 (2133-02-014)

Items: 125

County: MILAM
Length: N/A
Highway: FM 485
District: BRYAN
Control Number: 2133-02-014
DBE Goal: N/A
Project: STP 1902(281)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $20,093,534.56
Date: 08/07/2019 (6 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$20,093,534.56
$17,254,988.40
Over/Under Est: -14.13% -$2,838,546.16
Over/Under Est: -10.62% -$2,134,918.30
Amt Left: 4.08% $703,627.86
$18,920,274.91
Over/Under Est: -5.84% -$1,173,259.65
Amt Left: 9.65% $1,665,286.51
Delta: -5.35% -$961,658.65
Over/Under Est: 3% $602,843.46
Amt Left: 19.94% $3,441,389.62
Delta: -9.39% -$1,776,103.11
$24,929,999.99
Over/Under Est: 24.07% $4,836,465.43
Amt Left: 44.48% $7,675,011.59
Delta: -20.46% -$4,233,621.97

Bid Items & Bid Tabulations

125 Total 0 of 125
MILAM  |  FM 485  |  BRYAN  |  2133-02-014  |  08/07/2019  |  $20,093,534.56  |  STP 1902(281)  |  REHAB OF EXIST ROAD  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
ANGEL BROTHERS HOLDINGS CORP.
BRIDGES AND ROADS, LLC
PREPARING ROW
STA 431.000 $250.000 $1,656.000 $92.000 $600.000 $770.000 $1,839.400
REMOVING STAB BASE AND ASPH PAV (13")
SY 131,619.000 $3.700 $3.450 $4.410 $6.000 $6.300 $8.800
EXCAVATION (ROADWAY)
CY 38,499.000 $15.000 $4.660 $8.340 $9.000 $15.600 $15.800
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 16,312.000 $17.000 $10.970 $5.440 $15.000 $11.500 $30.200
FURNISHING AND PLACING TOPSOIL (4")
SY 222,975.000 $0.580 $0.210 $0.730 $0.400 $1.150 $6.700
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 222,975.000 $0.300 $0.320 $0.350 $0.320 $0.360 $0.400
CELL FBR MLCH SEED(TEMP)(WARM)
SY 111,488.000 $0.300 $0.390 $0.330 $0.300 $0.340 $0.400
CELL FBR MLCH SEED(TEMP)(COOL)
SY 111,488.000 $0.300 $0.390 $0.330 $0.300 $0.340 $0.400
VEGETATIVE WATERING
MG 2,230.000 $12.040 $17.890 $20.000 $14.000 $26.000 $18.700
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 158,598.000 $22.500 $11.760 $16.360 $18.000 $16.400 $18.200
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,486.000 $160.000 $149.180 $145.000 $150.000 $198.000 $165.900
LIME TRT (EXST MATL)(8")
SY 172,670.000 $3.500 $3.370 $3.260 $4.000 $5.000 $5.500
ASPH (RC-250)
GAL 43,169.000 $4.000 $3.600 $3.350 $4.500 $4.000 $5.900
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 1,279.000 $89.520 $90.000 $109.000 $125.000 $120.000 $131.100
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 31,880.000 $100.000 $95.000 $82.850 $79.000 $106.500 $99.700
CEM STABIL BKFL
CY 615.000 $64.770 $111.600 $160.000 $150.000 $111.000 $254.600
CUT & RESTORING PAV
SY 55.000 $80.000 $31.410 $135.000 $130.000 $142.000 $93.400
TRENCH EXCAVATION PROTECTION
LF 108.000 $7.680 $10.270 $16.300 $16.000 $17.000 $6.400
DRILL SHAFT (18 IN)
LF 466.000 $60.000 $49.140 $60.000 $55.000 $95.000 $133.600
DRILL SHAFT (36 IN)
LF 1,697.000 $166.860 $175.850 $187.000 $180.000 $200.000 $275.800
CL C CONC (ABUT)
CY 195.400 $951.810 $654.420 $710.000 $1,000.000 $885.000 $1,111.900
CL C CONC (CAP)
CY 80.200 $810.000 $939.090 $770.000 $1,000.000 $1,200.000 $1,324.200
CL C CONC (COLLAR)
EA 9.000 $820.000 $732.400 $900.000 $900.000 $960.000 $1,637.900
REINF CONC SLAB
SF 22,080.000 $21.230 $16.470 $19.500 $22.000 $20.500 $27.100
APPROACH SLAB (MOD)
CY 269.700 $532.000 $467.840 $470.000 $600.000 $560.000 $789.200
PRESTR CONC GIRDER (TX34)
LF 2,860.760 $185.000 $110.410 $152.000 $125.000 $155.000 $172.600
RIPRAP (CONC)(5 IN)
CY 95.000 $500.000 $406.540 $489.000 $480.000 $510.000 $512.600
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,650.000 $148.720 $116.720 $122.000 $130.000 $130.000 $121.200
RIPRAP (STONE PROTECTION)(24 IN)
CY 790.000 $148.720 $118.360 $94.000 $136.000 $120.000 $132.400
RIPRAP (MOW STRIP)(4 IN)
CY 246.000 $500.000 $419.220 $460.000 $530.000 $570.000 $549.200
RAIL (TY T223)
LF 1,144.000 $105.010 $58.040 $110.000 $140.000 $108.000 $124.900
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 308.000 $99.760 $58.530 $88.000 $75.000 $118.000 $104.600
CONC BOX CULV (3 FT X 2 FT)
LF 286.000 $176.860 $317.690 $434.000 $420.000 $454.000 $246.200
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 27.000 $600.000 $778.990 $543.000 $530.000 $569.000 $817.700
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 6.000 $625.000 $1,644.890 $600.000 $580.000 $625.000 $757.300
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
LF 29.000 $500.000 $882.480 $630.000 $610.000 $660.000 $1,025.800
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 103.000 $750.000 $775.890 $679.000 $660.000 $710.000 $985.100
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
LF 6.000 $1,150.000 $2,003.310 $924.000 $890.000 $966.000 $1,201.900
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
LF 46.000 $1,000.000 $880.390 $978.000 $950.000 $1,023.000 $781.700
RC PIPE (CL III)(18 IN)
LF 1,378.000 $47.700 $71.240 $52.000 $50.000 $55.000 $74.800
RC PIPE (CL III)(24 IN)
LF 286.000 $62.000 $120.560 $97.000 $95.000 $102.000 $86.700
RC PIPE (CL III)(30 IN)
LF 214.000 $76.380 $120.770 $139.000 $135.000 $146.000 $133.600
RC PIPE (CL III)(36 IN)
LF 50.000 $109.000 $190.440 $174.000 $170.000 $182.000 $155.400
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $7,800.000 $7,257.230 $8,150.000 $8,000.000 $8,525.000 $9,547.500
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $9,000.000 $7,314.850 $6,521.000 $6,500.000 $6,800.000 $7,288.800
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $6,500.000 $11,303.570 $9,238.000 $9,000.000 $9,660.000 $9,801.900
WINGWALL (PW - 1) (HW=5 FT)
EA 6.000 $8,300.000 $11,740.120 $11,412.000 $11,000.000 $12,000.000 $13,593.600
WINGWALL (PW - 1) (HW=6 FT)
EA 7.000 $9,500.000 $14,426.100 $14,000.000 $14,000.000 $14,700.000 $19,398.800
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $18,750.000 $19,236.480 $21,700.000 $21,000.000 $22,730.000 $32,789.900
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $21,317.500 $24,793.100 $33,150.000 $32,000.000 $34,700.000 $34,341.800
WINGWALL (PW - 1) (HW=9 FT)
EA 4.000 $26,485.190 $26,693.700 $38,000.000 $36,000.000 $39,800.000 $38,282.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 68.000 $825.000 $1,129.400 $923.000 $900.000 $966.000 $1,130.700
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 4.000 $850.000 $1,214.980 $870.000 $900.000 $909.000 $1,367.700
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $875.000 $1,273.090 $900.000 $950.000 $938.000 $1,416.100
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 18.000 $1,100.000 $1,347.620 $1,000.000 $1,100.000 $1,137.000 $1,602.500
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 8.000 $1,150.000 $1,399.860 $2,717.000 $2,600.000 $2,840.000 $2,470.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,500.000 $1,505.520 $3,260.000 $3,200.000 $3,450.000 $2,116.600
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 3.000 $1,500.000 $1,542.500 $3,800.000 $3,600.000 $3,980.000 $3,434.100
CLEAN EXIST CULVERTS
EA 19.000 $1,500.000 $2,476.570 $1,630.000 $1,600.000 $1,700.000 $3,654.800
REMOV STR (BOX CULVERT)
EA 1.000 $5,000.000 $3,008.280 $5,434.000 $5,300.000 $5,700.000 $63,162.000
REMOV STR (SET)
EA 10.000 $340.000 $286.290 $700.000 $700.000 $740.000 $369.800
REMOV STR (HEADWALL)
EA 28.000 $3,000.000 $1,435.460 $1,359.000 $1,300.000 $1,420.000 $1,672.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 3.000 $18,000.000 $16,755.390 $25,000.000 $20,000.000 $22,255.000 $21,771.800
REMOV STR (PIPE)
EA 51.000 $895.450 $89.670 $760.000 $750.000 $796.000 $432.700
MOBILIZATION
LS 1.000 $1,500,000.000 $1,448,003.390 $1,120,000.000 $1,260,000.000 $1,600,000.000 $2,487,955.680
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $8,231.000 $32,754.100 $10,400.000 $11,500.000 $2,500.000 $7,091.800
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 6,266.000 $28.590 $22.780 $30.430 $30.000 $32.000 $28.300
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 25.000 $50.000 $67.000 $49.000 $55.000 $52.000 $83.400
ROCK FILTER DAMS (REMOVE)
LF 6,291.000 $9.500 $4.880 $9.700 $7.000 $10.500 $6.100
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $15.000 $20.500 $19.500 $10.000 $20.500 $25.500
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $2.500 $8.000 $7.000 $2.000 $8.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,091.000 $2.390 $2.780 $4.880 $2.900 $3.130 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,091.000 $0.520 $0.460 $0.820 $0.800 $0.900 $0.600
CONCRETE GUTTER (MODIFIED)
LF 190.000 $32.900 $67.190 $49.000 $32.000 $35.000 $108.300
TURNOUTS (ACP)
SY 374.000 $54.000 $70.990 $68.000 $26.000 $27.000 $36.800
DRIVEWAYS AND TURNOUTS (ACP)
SY 570.000 $26.250 $38.110 $39.500 $16.000 $28.000 $23.600
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 2,961.000 $35.000 $13.570 $76.800 $23.000 $15.000 $11.800
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 85,261.000 $0.170 $0.100 $0.150 $0.180 $0.150 $0.100
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 42,940.000 $0.170 $0.110 $0.200 $0.250 $0.150 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 2,000.000 $19.380 $18.500 $17.550 $17.000 $19.000 $22.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,700.000 $1,410.000 $1,950.000 $1,400.000 $1,505.000 $1,617.300
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,133.000 $1,100.000 $815.000 $800.000 $853.000 $1,138.400
REMOVE METAL BEAM GUARD FENCE
LF 2,194.000 $2.120 $1.800 $2.000 $2.200 $2.300 $2.800
GUARDRAIL END TREATMENT (INSTALL)
EA 34.000 $2,615.350 $2,420.000 $2,717.000 $2,600.000 $2,850.000 $3,079.100
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $244.000 $180.000 $217.000 $220.000 $230.000 $279.900
MAILBOX INSTALL-S (WC-POST) TY 3
EA 27.000 $265.000 $115.000 $125.000 $125.000 $135.000 $143.100
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $320.000 $150.000 $163.000 $160.000 $170.000 $186.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 77.000 $383.030 $345.000 $375.000 $360.000 $400.000 $429.200
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 9.000 $465.600 $450.000 $490.000 $480.000 $520.000 $559.800
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 2.000 $1,095.680 $815.000 $885.000 $860.000 $930.000 $1,013.900
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 1.000 $250.000 $250.000 $272.000 $270.000 $290.000 $311.000
REMOVE SM RD SN SUP&AM
EA 91.000 $84.830 $45.000 $49.000 $50.000 $52.000 $56.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 1.000 $87.500 $25.000 $27.000 $27.000 $30.000 $31.100
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $23.000 $20.000 $22.000 $25.000 $23.000 $22.400
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 33.000 $81.400 $52.000 $57.000 $55.000 $59.000 $56.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 61.000 $28.000 $26.000 $32.000 $32.000 $30.000 $34.800
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 57,667.000 $0.110 $0.160 $0.240 $0.230 $0.250 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 51.000 $0.850 $3.000 $3.800 $3.700 $4.000 $4.400
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 8,074.000 $0.170 $0.160 $0.290 $0.280 $0.320 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 71,626.000 $0.110 $0.160 $0.280 $0.270 $0.320 $0.300
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 12,567.000 $0.410 $1.030 $1.000 $0.800 $1.000 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 84.000 $4.720 $8.000 $20.000 $19.000 $20.500 $22.400
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $132.150 $500.000 $500.000 $485.000 $525.000 $597.200
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 221,666.000 $0.520 $0.470 $0.540 $0.530 $0.600 $0.600
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 106,517.000 $0.760 $0.570 $0.680 $0.660 $0.750 $0.800
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
LF 23,430.000 $0.760 $0.570 $0.680 $0.660 $0.750 $0.800
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 84,716.000 $0.460 $0.340 $0.390 $0.380 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 7,490.000 $0.460 $0.390 $0.360 $0.350 $0.380 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 46,535.000 $0.520 $0.390 $0.350 $0.340 $0.360 $0.400
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 1,484.000 $0.760 $0.590 $1.090 $1.050 $1.150 $1.200
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 30.000 $0.760 $0.590 $2.170 $2.500 $2.250 $2.500
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 520.000 $0.760 $0.590 $1.630 $2.000 $1.700 $1.900
REFL PAV MRKR TY II-A-A
EA 3,617.000 $2.750 $3.000 $4.080 $4.000 $4.250 $4.700
ELIM EXT PAV MRK & MRKS (4")
LF 400.000 $0.450 $1.000 $0.860 $1.000 $0.900 $1.000
PAV SURF PREP FOR MRK (4")
LF 1,284.000 $0.070 $1.000 $0.860 $1.000 $0.900 $1.000
VEH SIG SEC (12")LED(YEL)
EA 2.000 $251.180 $334.670 $364.000 $350.000 $380.000 $304.600
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 1.000 $6,405.570 $7,566.540 $8,224.000 $8,000.000 $8,600.000 $11,010.400
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $865.700 $3,881.940 $4,220.000 $4,100.000 $4,450.000 $564.200
NO. OF WORKING DAYS
$/D 12,500.000 $318.000 $255.000 $318.000 $318.000 $318.000 $318.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 172,670.000 $1.500 $0.910 $1.100 $1.300 $1.150 $1.700
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,982.580 $11,489.320 $5,400.000 $10,000.000 $14,400.000 $11,822.400
PREFORMED CENTERLINE RUMBLE STRIP
LF 8,230.000 $5.000 $3.850 $6.240 $6.000 $6.500 $7.100
TMA (STATIONARY)
EA 2.000 $7,037.000 $40,000.000 $7,600.000 $25,000.000 $17,500.000 $7,584.700
TMA (MOBILE OPERATION)
DAY 31.000 $187.620 $1,809.140 $500.000 $600.000 $575.000 $271.500
SOLAR POWERED LED WARNING SIGN
EA 1.000 $860.000 $3,800.000 $4,130.000 $4,000.000 $4,400.000 $4,727.600
Totals: $20,093,534.564 $17,254,988.426 $17,958,616.260 $18,920,274.910 $20,696,378.020 $24,929,999.996