Show Job Controls
Bid Cobra

MILAM CR (0917-12-086)

Items: 35

County: MILAM
Length: N/A
Highway: CR
District: BRYAN
Control Number: 0917-12-086
DBE Goal: N/A
Project: BR 2021(240)
Guaranty: N/A
Time: 121 WORKING DAYS
Engineer's Estimate: $958,319.17
Date: 06/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JAMES KREAMER
JOHN MCCALL
JAMES ROBBINS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$958,319.17
$774,755.25
Over/Under Est: -19.15% -$183,563.92
Over/Under Est: -4.16% -$39,901.67
Amt Left: 18.54% $143,662.25
Over/Under Est: 1.59% $15,282.78
Amt Left: 25.67% $198,846.70
Delta: -6.01% -$55,184.45
Over/Under Est: 3.82% $36,613.83
Amt Left: 28.42% $220,177.75
Delta: -2.19% -$21,331.05
Over/Under Est: 12.22% $117,123.33
Amt Left: 38.81% $300,687.25
Delta: -8.09% -$80,509.50
Over/Under Est: 37.07% $355,210.93
Amt Left: 69.54% $538,774.85
Delta: -22.14% -$238,087.60
Subcontractor Percentage Amount
WYLIE DRILLING & DRAINAGE, INC. 5.30% $46,469.32
ROADWAY SPECIALTIES, INC. 2.81% $24,637.51
CEN-TREE SOLUTIONS LLC 2.00% $17,535.59
CEN TEX HYDROSEED, INC. 1.56% $13,677.76
MURRAY CONSTRUCTION 0.64% $5,611.39
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC 0.57% $4,997.64
Total: 12.88% $112,929.21

Bid Items & Bid Tabulations

35 Total 0 of 35
MILAM  |  CR  |  BRYAN  |  0917-12-086  |  06/01/2023  |  $958,319.17  |  BR 2021(240)  |  BRIDGE REPL  |  121 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
SEFBO PIPELINE BRIDGE, INCORPORATED
TEXAS MATERIALS GROUP, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
R CONSTRUCTION CIVIL, LLC
PREPARING ROW
STA 4.500 $7,709.520 $5,400.000 $10,000.000 $11,834.450 $21,000.000 $15,000.000 $8,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 20.000 $700.000 $800.000 $125.000 $507.000 $500.000 $3,200.000 $1,550.000
EXCAVATION (ROADWAY)
CY 259.000 $32.660 $55.000 $51.550 $12.970 $50.000 $40.000 $150.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 44.000 $110.320 $55.000 $74.000 $164.180 $110.000 $80.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,200.000 $5.250 $1.750 $8.300 $2.500 $6.000 $4.000 $8.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 1,200.000 $1.450 $1.500 $5.000 $0.380 $1.250 $4.000 $5.000
CELL FBR MLCH SEED(TEMP)(WARM)
SY 510.000 $2.030 $1.250 $4.450 $0.750 $1.250 $1.000 $3.000
CELL FBR MLCH SEED(TEMP)(COOL)
SY 510.000 $2.330 $1.250 $4.450 $0.750 $1.250 $1.000 $3.000
VEGETATIVE WATERING
MG 158.000 $87.720 $20.000 $46.000 $13.670 $24.000 $1.000 $70.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,200.000 $19.180 $18.000 $31.000 $43.330 $25.000 $40.000 $33.000
CEM STABIL BKFL
CY 27.000 $259.760 $360.000 $380.000 $346.840 $300.000 $300.000 $109.000
DRILL SHAFT (24 IN)
LF 387.000 $252.520 $200.000 $232.550 $494.620 $300.000 $180.000 $345.000
CL C CONC (ABUT)
CY 21.000 $1,664.020 $1,850.000 $1,760.000 $2,126.920 $2,200.000 $2,000.000 $2,915.000
CL C CONC (CAP)
CY 13.800 $1,947.400 $2,200.000 $2,290.000 $2,786.880 $3,000.000 $2,500.000 $2,707.000
CL C CONC (COLUMN)
CY 16.800 $2,119.490 $1,000.000 $2,095.000 $1,226.280 $1,600.000 $2,500.000 $3,010.000
REINF CONC SLAB (SLAB BEAM)
SF 2,860.000 $31.460 $27.000 $32.750 $22.490 $37.000 $30.000 $22.000
PRESTR CONC SLAB BEAM (5SB15)
LF 542.500 $297.950 $300.000 $245.000 $264.770 $280.000 $435.000 $284.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 454.000 $232.340 $138.000 $220.000 $124.760 $200.000 $200.000 $350.000
RAIL (TY T223)
LF 244.000 $172.790 $155.000 $236.000 $180.240 $190.000 $200.000 $250.000
ARMOR JOINT (SEALED)
LF 46.000 $185.610 $185.000 $210.000 $255.040 $170.000 $200.000 $164.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $47,467.390 $29,000.000 $42,400.000 $63,600.000 $35,000.000 $25,000.000 $200,000.000
MOBILIZATION
LS 1.000 $87,749.020 $77,000.000 $91,800.000 $96,000.000 $90,000.000 $90,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,163.990 $1,500.000 $2,600.000 $1,003.450 $3,500.000 $8,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 120.000 $42.070 $45.000 $41.800 $37.500 $40.000 $1.000 $41.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $35.960 $17.000 $9.350 $8.000 $15.000 $1.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 711.000 $4.700 $9.000 $3.850 $6.720 $4.500 $1.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 711.000 $1.660 $1.750 $1.100 $1.010 $1.500 $1.000 $1.000
MTL W-BEAM GD FEN (STEEL POST)
LF 187.500 $50.000 $48.000 $44.300 $107.260 $40.000 $50.000 $31.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $339.190 $1,500.000 $1,398.000 $882.000 $1,300.000 $2,000.000 $1,599.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $168.420 $3,500.000 $3,212.000 $2,436.000 $3,000.000 $3,500.000 $3,639.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $793.060 $1,000.000 $715.000 $669.600 $800.000 $1,200.000 $815.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $928.110 $1,100.000 $1,100.000 $1,209.600 $900.000 $1,500.000 $873.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $572.890 $575.000 $550.000 $360.000 $750.000 $500.000 $582.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $37.300 $20.000 $16.500 $68.000 $15.000 $50.000 $41.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 16.000 $15.830 $20.000 $16.500 $90.750 $15.000 $50.000 $41.000
Totals: $958,319.167 $774,755.250 $918,417.500 $973,601.968 $994,933.000 $1,075,442.500 $1,313,530.100