Show Job Controls
Bid Cobra

MILAM CR (0917-12-084)

Items: 37

County: MILAM
Length: N/A
Highway: CR
District: BRYAN
Control Number: 0917-12-084
DBE Goal: N/A
Project: BR 2021(762)
Guaranty: N/A
Time: 89 WORKING DAYS
Engineer's Estimate: $484,638.10
Date: 04/07/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$484,638.10
$515,115.00
Over/Under Est: 6.29% $30,476.90
Over/Under Est: 9.49% $45,976.92
Amt Left: 3.01% $15,500.02
Over/Under Est: 19% $92,094.60
Amt Left: 11.96% $61,617.70
Delta: -8.69% -$46,117.68
Over/Under Est: 36.27% $175,785.15
Amt Left: 28.21% $145,308.25
Delta: -14.51% -$83,690.55
$684,146.35
Over/Under Est: 41.17% $199,508.25
Amt Left: 32.81% $169,031.35
Delta: -3.59% -$23,723.10
$725,305.29
Over/Under Est: 49.66% $240,667.19
Amt Left: 40.8% $210,190.29
Delta: -6.02% -$41,158.94

Bid Items & Bid Tabulations

37 Total 0 of 37
MILAM  |  CR  |  BRYAN  |  0917-12-084  |  04/07/2022  |  $484,638.10  |  BR 2021(762)  |  BRIDGE REPL  |  89 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PIERCE R & B LLC
FUQUA CONSTRUCTION CO., INC.
KNIFE RIVER CORPORATION - SOUTH
HODGES AND SON CONSTRUCTION COMPANY, INC.
3LW CIVIL LLC
SB CONTRACTORS LLC
PREPARING ROW
STA 3.300 $5,700.000 $2,500.000 $3,000.000 $4,000.000 $9,000.000 $500.000 $7,000.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 1.000 $500.000 $925.000 $400.000 $1,200.000 $1,000.000 $10,000.000 $3,261.950
EXCAVATION (ROADWAY)
CY 102.000 $10.000 $14.000 $30.000 $40.000 $35.000 $30.000 $43.400
EXCAVATION (CHANNEL)
CY 81.000 $10.000 $18.000 $50.000 $50.000 $40.000 $30.000 $33.240
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 8.000 $15.000 $22.000 $50.000 $40.000 $100.000 $500.000 $166.210
FURNISHING AND PLACING TOPSOIL (4")
SY 504.000 $1.000 $3.000 $3.000 $3.000 $5.000 $4.000 $5.740
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 504.000 $0.200 $2.000 $2.000 $2.000 $5.000 $2.000 $2.240
CELL FBR MLCH SEED(TEMP)(WARM)
SY 252.000 $0.200 $0.100 $1.500 $2.000 $5.000 $4.000 $4.350
CELL FBR MLCH SEED(TEMP)(COOL)
SY 252.000 $0.200 $0.100 $1.500 $2.000 $5.000 $4.000 $4.350
VEGETATIVE WATERING
MG 5.000 $40.000 $40.000 $8.380 $100.000 $1.000 $165.000 $79.960
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 539.000 $25.000 $19.000 $27.000 $20.000 $45.000 $21.000 $43.400
CEM STABIL BKFL
CY 60.000 $80.000 $200.000 $167.000 $200.000 $250.000 $205.000 $136.820
DRILL SHAFT (24 IN)
LF 360.000 $150.000 $235.000 $210.000 $235.000 $195.000 $275.000 $252.470
CL C CONC (ABUT)
CY 20.200 $925.000 $1,100.000 $1,000.000 $1,500.000 $1,500.000 $1,300.000 $1,348.950
CL C CONC (CAP)
CY 13.800 $980.000 $1,400.000 $1,000.000 $1,750.000 $1,400.000 $1,400.000 $2,477.270
CL C CONC (COLUMN)
CY 8.400 $910.000 $1,600.000 $1,000.000 $1,750.000 $1,400.000 $1,100.000 $2,967.390
REINF CONC SLAB (SLAB BEAM)
SF 2,730.000 $25.000 $19.000 $22.000 $22.000 $30.000 $21.000 $25.180
PRESTR CONC SLAB BEAM (5SB12)
LF 517.430 $150.000 $215.000 $214.470 $240.000 $275.000 $245.000 $261.210
RIPRAP (STONE PROTECTION)(18 IN)
CY 260.000 $125.000 $120.000 $140.510 $112.000 $150.000 $199.000 $269.620
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $460.000 $500.000 $474.000 $550.000 $600.000 $550.000 $680.810
RAIL (TY T631)
LF 234.000 $80.000 $98.000 $93.500 $80.000 $90.000 $120.000 $88.680
ARMOR JOINT (SEALED)
LF 46.000 $125.000 $120.000 $110.000 $160.000 $120.000 $95.000 $266.160
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $7,500.000 $18,000.000 $18,000.000 $20,000.000 $13,000.000 $15,988.650
MOBILIZATION
LS 1.000 $43,000.000 $47,000.000 $48,237.000 $58,000.000 $60,000.000 $70,000.000 $65,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $7,820.000 $1,875.990 $3,000.000 $1,000.000 $4,000.000 $15,000.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 32.000 $35.000 $40.000 $30.000 $37.000 $1.000 $36.000 $89.880
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 58.000 $35.000 $60.000 $65.000 $50.000 $1.000 $65.000 $119.830
ROCK FILTER DAMS (REMOVE)
LF 90.000 $10.000 $10.000 $10.000 $15.000 $1.000 $16.000 $83.880
TEMP SEDMT CONT FENCE (INSTALL)
LF 790.000 $5.000 $3.500 $4.000 $5.750 $1.000 $4.000 $5.990
TEMP SEDMT CONT FENCE (REMOVE)
LF 790.000 $1.500 $1.000 $1.000 $1.000 $1.000 $1.000 $3.000
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $25.000 $29.000 $30.000 $24.000 $30.000 $25.000 $25.770
SHORT RADIUS
LF 75.000 $34.000 $34.000 $65.650 $27.000 $70.000 $45.000 $29.960
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,600.000 $3,200.000 $3,125.000 $3,000.000 $3,500.000 $3,100.000 $3,295.400
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $550.000 $750.000 $590.840 $765.000 $1,000.000 $700.000 $599.160
REMOVE SM RD SN SUP&AM
EA 2.000 $95.000 $83.600 $91.060 $65.000 $200.000 $75.000 $119.830
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 6.000 $25.000 $30.000 $30.000 $20.000 $30.000 $50.000 $35.950
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 14.000 $95.000 $150.000 $62.100 $150.000 $200.000 $100.000 $350.000
Totals: $484,638.100 $515,115.000 $530,615.022 $576,732.700 $660,423.250 $684,146.350 $725,305.302