|
|
PREPARING ROW
|
STA
|
35.600
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
660.000
|
|
|
RMV (0"-4") TRT/UNTRT BASE & ASPH PAV
|
SY
|
8,043.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
7,075.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
671.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
6,211.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
13,435.000
|
|
|
HYDRO MULCH SEED (PERM_RURAL_CLAY)
|
SY
|
13,435.000
|
|
|
HYDRO MULCH SEED (TEMP_WARM)
|
SY
|
6,718.000
|
|
|
HYDRO MULCH SEED (TEMP_COOL)
|
SY
|
6,718.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
134.400
|
|
|
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
|
SY
|
11,467.000
|
|
|
LIME (COMMERCIAL LIME SLURRY)
|
TON
|
204.000
|
|
|
LIME TRT (EXIST MATL)(10")
|
SY
|
12,321.000
|
|
|
CEMENT
|
TON
|
102.000
|
|
|
CEMENT TRT (EXIST MATL & NEW BASE)(10")
|
SY
|
12,321.000
|
|
|
ASPH (RC-250)
|
GAL
|
2,653.000
|
|
|
AGGR (TY-B OR L, GR-5)
|
CY
|
79.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
1,167.000
|
|
|
TACK COAT
|
GAL
|
1,061.000
|
|
|
CEM STABIL BKFL
|
CY
|
274.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
875.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
920.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
321.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
675.000
|
|
|
CL C CONC (ABUT)
|
CY
|
99.000
|
|
|
CL C CONC (CAP)
|
CY
|
94.200
|
|
|
CL C CONC (COLUMN)
|
CY
|
63.700
|
|
|
REINF CONC SLAB
|
SF
|
23,040.000
|
|
|
APPROACH SLAB
|
CY
|
100.800
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,180.130
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
136.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,886.000
|
|
|
RAIL (TY T223)
|
LF
|
1,368.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
|
LF
|
174.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
2.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
29.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
222.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,093.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,093.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
596.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
596.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
2,267.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
27.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,910.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
4,440.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
2,910.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
392.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,170.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
10.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,135.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
12.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
1,118.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
1,561.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
7.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
30.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
21,342.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
88.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
6,112.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
8,672.000
|
|
RE PM TY II (Y) 6" (BRK)
|
LF
|
542.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
6,506.000
|
|
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
|
LF
|
8,672.000
|
|
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
|
LF
|
6,506.000
|
|
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
|
LF
|
542.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
111.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
15,720.000
|