Show Job Controls
Bid Cobra

MILAM FM 1915 (0262-07-041)

Items: 118

County: MILAM
Length: N/A
Highway: FM 1915
District: BRYAN
Control Number: 0262-07-041
DBE Goal: N/A
Project: C 262-7-41
Guaranty: N/A
Time: 256 WORKING DAYS
Engineer's Estimate: $7,683,325.92
Date: 06/04/2019 (7 years ago)
Contract Number: N/A
Type: REHABILITATION OF EXISTING ROAD
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$7,683,325.92
$8,638,532.48
Over/Under Est: 12.43% $955,206.56
Over/Under Est: 26.59% $2,042,622.83
Amt Left: 12.59% $1,087,416.27

Bid Items & Bid Tabulations

118 Total 0 of 118
MILAM  |  FM 1915  |  BRYAN  |  0262-07-041  |  06/04/2019  |  $7,683,325.92  |  C 262-7-41  |  REHAB OF EXIST ROAD  |  256 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
STA 379.000 $250.000 $500.000 $274.000
REMOVING CONC (DRIVEWAYS)
SY 38.000 $11.480 $35.000 $14.380
REMOVING CONCRETE(MOW STRIP)
LF 481.000 $6.950 $20.000 $5.850
REMOVING STAB BASE AND ASPH PAV (7")
SY 103,925.000 $4.000 $3.500 $2.890
EXCAVATION (ROADWAY)
CY 34,685.000 $7.850 $15.000 $14.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 19,265.000 $5.320 $15.000 $17.200
BLADING
STA 20.000 $116.000 $350.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
SY 100,310.000 $0.580 $0.750 $0.320
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 100,310.000 $0.130 $0.270 $0.300
CELL FBR MLCH SEED(TEMP)(WARM)
SY 50,160.000 $0.050 $0.250 $0.270
CELL FBR MLCH SEED(TEMP)(COOL)
SY 50,160.000 $0.050 $0.250 $0.270
VEGETATIVE WATERING
MG 1,003.000 $12.040 $10.000 $17.000
FL BS (CMP IN PLC)(TY D GR-1-2)(9")
SY 112,539.000 $13.690 $14.000 $20.640
FL BS (CMP IN PLACE) (TY D GR 1-2)(4")
SY 6,654.000 $5.070 $8.000 $6.800
LIME TRT (EXST MATL) (12")
SY 137,165.000 $3.000 $3.000 $5.350
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 2,963.000 $150.000 $160.000 $145.000
CM TRT(PT MX)(CL M)(TYD)(GR1-2)(FN POS)
CY 1,309.000 $52.000 $80.000 $97.800
CEM TRT(PLNT MX)(CL M)(TYD)(GR1-2)(12")
SY 7,102.000 $45.500 $30.000 $32.000
ASPH (RC-250)
GAL 36,510.000 $3.790 $3.750 $4.550
ASPH (SPG 73-19)
GAL 90,586.000 $3.270 $3.500 $3.280
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 1,082.000 $89.520 $80.000 $105.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 1,908.000 $100.000 $105.000 $137.000
SUPERPAVE MIXTURES SP-C SAC-A PG64-22
TON 1,295.000 $79.300 $90.000 $99.000
CEM STABIL BKFL
CY 143.000 $66.000 $165.000 $104.000
CUT & RESTORING PAV
SY 143.000 $80.000 $150.000 $25.000
TRENCH EXCAVATION PROTECTION
LF 190.000 $7.680 $12.000 $24.000
CL C CONC (COLLAR)
EA 3.000 $935.000 $1,000.000 $2,890.000
RIPRAP (CONC)(5 IN)
CY 92.000 $500.000 $400.000 $635.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 625.000 $92.660 $125.000 $119.000
RIPRAP (MOW STRIP)(4 IN)
CY 540.000 $391.830 $475.000 $637.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 18.000 $390.000 $500.000 $1,008.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 22.000 $744.000 $750.000 $1,000.000
CONC BOX CULV (8 FT X 6 FT)(EXTEND)
LF 29.000 $1,075.000 $1,000.000 $1,550.000
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
LF 36.000 $1,200.000 $1,250.000 $1,378.000
CONC BOX CULV (9 FT X 8 FT)(EXTEND)
LF 11.000 $1,250.000 $1,400.000 $2,800.000
RC PIPE (CL III)(18 IN)
LF 930.000 $47.700 $60.000 $47.000
RC PIPE (CL III)(24 IN)
LF 630.000 $62.000 $75.000 $57.500
RC PIPE (CL III)(30 IN)
LF 123.000 $76.380 $115.000 $90.000
RC PIPE (CL III)(36 IN)
LF 285.000 $109.000 $135.000 $115.000
RC PIPE (CL III)(42 IN)
LF 30.000 $115.000 $200.000 $161.000
RC PIPE (CL III)(48 IN)
LF 36.000 $150.000 $250.000 $188.000
RC PIPE (CL IV)(18 IN)
LF 51.000 $72.510 $85.000 $80.000
RC PIPE (CL IV)(42 IN)
LF 12.000 $265.550 $200.000 $231.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 4.000 $4,750.000 $4,000.000 $13,600.000
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 1.000 $6,600.000 $5,000.000 $14,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 10.000 $7,800.000 $6,500.000 $14,100.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 2.000 $4,000.000 $4,000.000 $14,500.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $8,000.000 $10,000.000 $14,700.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 2.000 $8,250.000 $15,000.000 $14,600.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $33,000.000 $45,000.000 $30,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $39,000.000 $65,000.000 $40,000.000
WINGWALL (PW - 1) (HW=12 FT)
EA 1.000 $45,233.800 $85,000.000 $52,900.000
WINGWALL (PW - 1) (HW=4 FT)
EA 1.000 $6,500.000 $9,000.000 $12,800.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $9,500.000 $20,000.000 $18,600.000
WINGWALL (PW - 1) (HW=7 FT)
EA 1.000 $18,750.000 $27,500.000 $22,600.000
WINGWALL (PW - 1) (HW=8 FT)
EA 2.000 $21,317.000 $40,000.000 $25,200.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $26,485.190 $45,000.000 $23,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 1.000 $4,953.250 $3,500.000 $13,700.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 2.000 $770.000 $750.000 $734.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 54.000 $825.000 $900.000 $935.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 6.000 $1,031.000 $1,000.000 $810.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 20.000 $1,100.000 $1,200.000 $1,000.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,150.000 $1,500.000 $1,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $1,551.000 $2,250.000 $2,100.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 4.000 $1,950.000 $2,500.000 $2,500.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 6.000 $2,889.850 $3,500.000 $3,000.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $7,485.190 $6,500.000 $8,800.000
REMOV STR (HEADWALL)
EA 18.000 $972.320 $2,500.000 $3,600.000
REMOV STR (PIPE)
EA 38.000 $895.450 $500.000 $970.000
MOBILIZATION
LS 1.000 $702,606.700 $754,000.000 $525,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 17.000 $8,231.000 $2,500.000 $1,600.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 2,940.000 $28.590 $25.000 $28.570
ROCK FILTER DAMS (REMOVE)
LF 2,940.000 $9.500 $5.000 $8.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 224.000 $15.000 $25.000 $22.000
CONSTRUCTION EXITS (REMOVE)
SY 224.000 $2.500 $5.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,475.000 $2.390 $3.000 $2.640
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,475.000 $0.520 $0.500 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,638.000 $3.650 $4.000 $4.730
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,638.000 $0.850 $1.000 $1.000
DRIVEWAYS AND TURNOUTS (CONC)
SY 38.000 $75.920 $100.000 $131.000
DRIVEWAYS AND TURNOUTS (ACP)
SY 2,291.000 $26.250 $30.000 $73.000
DRIVEWAYS AND TURNOUTS (SURF TREAT)
SY 2,976.000 $10.820 $20.000 $72.500
MTL W-BEAM GD FEN (TIM POST)
LF 6,387.500 $19.380 $25.000 $22.000
MTL BEAM GD FEN TRANS (T101)
EA 12.000 $1,312.000 $900.000 $1,263.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 1,723.000 $10.500 $15.000 $11.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 8.000 $1,133.000 $800.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 2,635.000 $2.120 $3.000 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $218.000 $150.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 44.000 $2,615.350 $2,600.000 $2,637.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $244.000 $250.000 $165.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 19.000 $265.000 $150.000 $247.250
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $400.000 $500.000 $604.400
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 129.000 $383.030 $350.000 $494.510
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $495.600 $450.000 $604.400
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $550.220 $550.000 $714.290
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 4.000 $1,095.680 $800.000 $1,209.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $733.240 $700.000 $934.000
REMOVE SM RD SN SUP&AM
EA 122.000 $84.830 $50.000 $71.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 69.000 $18.720 $20.000 $11.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 65.000 $81.400 $60.000 $71.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 150,418.000 $0.110 $0.100 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,104.000 $0.220 $0.200 $0.190
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 140,582.000 $0.170 $0.200 $0.190
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 609.000 $0.590 $2.000 $2.140
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 1,218.000 $0.870 $2.000 $1.370
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 3,858.000 $0.750 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 214.000 $4.720 $15.000 $14.290
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $132.150 $365.000 $400.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 9,814.000 $0.310 $0.320 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,320.000 $0.310 $0.650 $0.690
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 67,395.000 $0.760 $0.650 $0.690
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 4,552.000 $0.760 $0.700 $0.760
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 67,971.000 $0.760 $0.650 $0.690
REFL PAV MRKR TY II-A-A
EA 969.000 $2.750 $4.000 $4.400
GEOGRID BASE REINFORCEMENT (TY II)
SY 137,165.000 $1.390 $1.500 $0.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $4,982.580 $10,100.000 $1,100.000
TMA (STATIONARY)
EA 2.000 $7,037.000 $7,500.000 $22,000.000
TMA (MOBILE OPERATION)
DAY 16.000 $187.620 $350.000 $400.000
Totals: $7,683,325.920 $8,638,532.480 $9,725,948.750