Items: 19

County: MILAM
Length: N/A
Highway: US 77
District: BRYAN
Control Number: 0210-02-024
DBE Goal: N/A
Project: STP 2018(354)HESG
Guaranty: N/A
Time: 36 WORKING DAYS
Engineer's Estimate: $53,895.00
Date: 12/06/2017 (8 years ago)
Contract Number: N/A
Type: INSTALLATION OF FLASHING BEACON
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$53,895.00
Over/Under Est: 7.09% $3,822.25
Over/Under Est: 23.8% $12,825.00
Amt Left: 15.6% $9,002.75
Over/Under Est: 24.2% $13,042.77
Amt Left: 15.98% $9,220.52
Delta: -0.33% -$217.77
Over/Under Est: 41.83% $22,545.98
Amt Left: 32.44% $18,723.73
Delta: -14.20% -$9,503.21
Over/Under Est: 52.7% $28,400.31
Amt Left: 42.58% $24,578.06
Delta: -7.66% -$5,854.33

Bid Items & Bid Tabulations

19 Total 0 of 19
MILAM  |  US 77  |  BRYAN  |  0210-02-024  |  12/06/2017  |  $53,895.00  |  STP 2018(354)HESG  |  INSTL OF FLASHING BEACON  |  36 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SOUTH RANGER CONSTRUCTION, INC.
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC.
THE LEVY COMPANY, INC.
THIRD COAST SERVICES LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 26.000 $275.000 $400.000 $250.000 $390.000 $355.350 $928.560
MOBILIZATION
LS 1.000 $5,000.000 $8,000.000 $6,000.000 $6,693.770 $7,500.000 $7,559.040
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $2,500.000 $2,500.000 $13,000.000 $3,300.000 $3,819.790 $3,540.600
CONDT (PVC) (SCH 40) (2")
LF 375.000 $7.000 $9.000 $7.000 $15.000 $14.180 $12.360
CONDT (PVC) (SCH 40) (2") (BORE)
LF 55.000 $15.000 $15.000 $40.000 $77.000 $14.180 $64.170
ELEC CONDR (NO.6) BARE
LF 465.000 $3.000 $1.550 $1.000 $2.400 $4.180 $2.010
ELEC CONDR (NO.6) INSULATED
LF 930.000 $3.000 $1.550 $1.500 $2.400 $4.310 $2.070
TRAY CABLE (4 CONDR) (8 AWG)
LF 460.000 $3.250 $1.750 $3.000 $4.600 $9.510 $4.380
GROUND BOX TY C (162911)W/APRON
EA 4.000 $1,000.000 $700.000 $900.000 $1,150.000 $1,603.340 $1,284.720
REMOVE GROUND BOX
EA 1.000 $175.000 $350.000 $150.000 $125.000 $426.200 $1,148.640
ZINC-COAT STL WIRE STRAND (3/8")
LF 130.000 $3.000 $2.000 $1.000 $9.500 $5.000 $7.290
REMOVE ELECTRICAL SERVICES
EA 1.000 $700.000 $450.000 $250.000 $215.000 $426.200 $1,278.240
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 1.000 $4,850.000 $3,700.000 $4,500.000 $6,600.000 $4,218.610 $5,792.400
INSTALL HWY TRF SIG (FLASH BEACON)
EA 1.000 $7,500.000 $7,000.000 $2,000.000 $4,000.000 $11,649.710 $3,946.800
VEH SIG SEC (12")LED(YEL)
EA 4.000 $250.000 $205.000 $300.000 $380.000 $185.960 $282.600
VEH SIG SEC (12")LED(RED)
EA 2.000 $250.000 $210.000 $300.000 $380.000 $185.960 $313.800
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 75.000 $4.000 $2.000 $3.000 $3.000 $40.470 $3.650
INS TRF SIG PL AM (S)STR(TY B)
EA 1.000 $3,200.000 $5,100.000 $3,500.000 $4,000.000 $3,401.510 $4,304.400
INS TRF SIG PL AM (S)STR(TY B)LUM
EA 1.000 $5,000.000 $6,100.000 $4,000.000 $4,900.000 $4,301.700 $5,884.800
Totals: $53,895.000 $57,717.250 $66,720.000 $66,937.770 $76,440.980 $82,295.310