MILAM US 79 (0204-05-040)

Items: 46

County: MILAM
Length: N/A
Highway: US 79
District: BRYAN
Control Number: 0204-05-040
DBE Goal: N/A
Project: NH 2020(555)
Guaranty: N/A
Time: 22 WORKING DAYS
Engineer's Estimate: $323,398.70
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: INSTALL TWO-WAY LEFT TURN LANE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$323,398.70
$376,466.30
Over/Under Est: 16.41% $53,067.60
Over/Under Est: 24.49% $79,200.50
Amt Left: 6.94% $26,132.90
Over/Under Est: 38.44% $124,329.55
Amt Left: 18.93% $71,261.95
Delta: -11.21% -$45,129.05
Over/Under Est: 44.2% $142,940.80
Amt Left: 23.87% $89,873.20
Delta: -4.16% -$18,611.25
Over/Under Est: 50.6% $163,650.60
Amt Left: 29.37% $110,583.00
Delta: -4.44% -$20,709.80
Over/Under Est: 55.14% $178,329.05
Amt Left: 33.27% $125,261.45
Delta: -3.01% -$14,678.45

Bid Items & Bid Tabulations

46 Total 0 of 46
MILAM  |  US 79  |  BRYAN  |  0204-05-040  |  02/07/2020  |  $323,398.70  |  NH 2020(555)  |  INSTL TWO-WAY LEFT TURN LANE  |  22 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
BIG CREEK CONSTRUCTION, LTD.
ANGEL BROTHERS HOLDINGS CORP.
LONE STAR PAVING COMPANY
AUSTIN MATERIALS, LLC
PREPARING ROW
STA 20.000 $500.000 $120.000 $35.000 $1,200.000 $260.000 $2,500.000 $305.000
REMOVING CONCRETE(MOW STRIP)
LF 30.000 $9.000 $45.000 $22.000 $45.000 $140.000 $35.000 $35.000
BACKFILL (TY A OR B)
CY 30.000 $32.000 $116.000 $155.000 $150.000 $200.000 $400.000 $295.000
BLOCK SODDING
SY 237.000 $4.000 $8.000 $6.500 $6.000 $6.500 $10.000 $10.000
VEGETATIVE WATERING
MG 3.000 $15.000 $50.000 $165.000 $50.000 $150.000 $75.000 $200.000
PFC (ASPHALT) PG76-22
TON 36.000 $170.000 $131.500 $170.000 $150.000 $173.000 $130.000 $138.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 532.000 $150.000 $131.500 $170.000 $150.000 $173.000 $130.000 $138.000
PLANE ASPH CONC PAV (2")
SY 13,991.000 $1.000 $1.700 $1.300 $2.750 $2.000 $2.300 $3.250
RIPRAP (CONC)(4 IN)
CY 3.000 $400.000 $800.000 $714.000 $850.000 $1,600.000 $850.000 $850.000
RIPRAP (MOW STRIP)(4 IN)
CY 18.000 $425.000 $500.000 $437.000 $550.000 $700.000 $525.000 $525.000
RC PIPE (CL III)(18 IN)
LF 48.000 $55.000 $90.000 $100.000 $115.000 $140.000 $90.000 $90.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 8.000 $780.000 $950.000 $1,500.000 $1,750.000 $1,800.000 $1,650.000 $1,650.000
REMOV STR (PIPE)
EA 2.000 $560.000 $300.000 $200.000 $600.000 $600.000 $1,200.000 $1,200.000
MOBILIZATION
LS 1.000 $31,371.700 $37,000.000 $44,730.000 $42,250.000 $70,000.000 $15,000.000 $92,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $5,000.000 $5,000.000 $7,705.000 $2,500.000 $6,800.000 $40,000.000 $11,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $29.000 $30.000 $40.000 $30.000 $40.000 $35.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $9.000 $7.000 $10.000 $10.000 $10.000 $25.000 $25.000
DRIVEWAYS (ACP)
SY 172.000 $7.000 $40.000 $24.250 $30.000 $30.000 $75.000 $67.000
RUMBLE STRIPS (SHOULDER)
LF 1,600.000 $0.150 $5.600 $3.000 $5.000 $8.000 $2.000 $4.750
MTL W-BEAM GD FEN (TIM POST)
LF 725.000 $22.000 $24.240 $22.300 $26.000 $24.000 $22.300 $22.300
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,350.000 $1,127.000 $1,037.000 $2,000.000 $1,100.000 $1,037.000 $1,037.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $2.500 $5.400 $5.000 $6.000 $5.000 $5.000 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $270.000 $250.000 $300.000 $250.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $2,600.000 $3,000.000 $2,790.000 $3,500.000 $2,800.000 $2,790.000 $2,790.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $300.000 $325.000 $300.000 $400.000 $320.000 $300.000 $300.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 6.000 $550.000 $448.000 $453.500 $750.000 $460.000 $630.000 $629.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $800.000 $900.000 $822.900 $1,500.000 $850.000 $1,346.000 $1,346.000
REMOVE SM RD SN SUP&AM
EA 12.000 $92.000 $95.000 $96.200 $200.000 $95.000 $150.000 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 11.000 $25.000 $40.000 $37.000 $40.000 $22.000 $37.000 $37.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,000.000 $0.700 $0.820 $1.250 $0.800 $0.800 $0.750 $0.750
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 950.000 $0.700 $0.820 $1.250 $0.800 $0.800 $0.750 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 3,800.000 $0.700 $0.820 $0.950 $0.800 $0.800 $0.750 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 306.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 491.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $108.000 $163.000 $250.000 $200.000 $160.000 $150.000 $150.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 1,000.000 $0.400 $0.820 $0.890 $0.800 $0.800 $0.750 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,800.000 $0.400 $0.820 $0.870 $0.800 $0.800 $0.750 $0.750
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 980.000 $0.400 $0.820 $0.890 $0.800 $0.800 $0.750 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 3,800.000 $0.400 $0.820 $0.890 $0.800 $0.800 $0.750 $0.750
REFL PAV MRKR TY I-C
EA 52.000 $4.000 $19.500 $8.000 $20.000 $18.000 $18.000 $18.000
REFL PAV MRKR TY II-A-A
EA 98.000 $4.500 $19.500 $8.000 $20.000 $18.000 $18.000 $18.000
SP MIXES SP-C SAC-A PG70-22
TON 868.000 $90.000 $101.000 $125.000 $125.000 $130.000 $105.000 $110.000
BONDING COURSE
GAL 1,120.000 $2.500 $6.000 $2.600 $5.000 $3.500 $2.750 $5.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $6,500.000 $5,400.000 $1,000.000 $5,000.000 $500.000 $8,000.000 $5,850.000
TMA (STATIONARY)
DAY 20.000 $220.000 $400.000 $240.000 $250.000 $200.000 $125.000 $260.000
TMA (MOBILE OPERATION)
DAY 22.000 $270.000 $600.000 $465.000 $250.000 $200.000 $125.000 $815.000
Totals: $323,398.700 $376,466.300 $402,599.200 $447,728.250 $466,339.500 $487,049.300 $501,727.750