MILAM FM 845 (0185-06-012)

Items: 106

County: MILAM
Length: N/A
Highway: FM 845
District: BRYAN
Control Number: 0185-06-012
DBE Goal: N/A
Project: F 2022(253)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $4,104,531.84
Date: 01/07/2022 (4 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$4,104,531.84
$3,982,426.27
Over/Under Est: -2.97% -$122,105.57
Over/Under Est: 13.93% $571,895.24
Amt Left: 17.43% $694,000.81
Over/Under Est: 17.22% $706,972.20
Amt Left: 20.82% $829,077.77
Delta: -2.89% -$135,076.96
Over/Under Est: 21.99% $902,705.15
Amt Left: 25.73% $1,024,810.72
Delta: -4.07% -$195,732.95
Subcontractor Percentage Amount
CEN TEX HYDROSEED, INC. 2.14% $89,630.47
ENVIRONMENTAL SAFETY SERVICES, INC. 1.50% $62,825.09
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 1.19% $49,841.24
TRP CONSTRUCTION GROUP, LLC 1.16% $48,584.74
PINNACLE GRINDING AND GROOVING LLC 0.10% $4,188.34
PROFESSIONAL TRAFFIC CONTROL LLC 0.00% $0.00
Total: 6.09% $255,069.88

Bid Items & Bid Tabulations

106 Total 0 of 106
MILAM  |  FM 845  |  BRYAN  |  0185-06-012  |  01/07/2022  |  $4,104,531.84  |  F 2022(253)  |  PREVENT MAINT  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BRAZOS PAVING, INC.
BIG CREEK CONSTRUCTION, LTD.
KNIFE RIVER CORPORATION - SOUTH
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 108.000 $800.000 $1,017.000 $700.000 $744.500 $1,000.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 29,333.000 $1.500 $3.960 $5.000 $5.120 $8.000
EXCAVATION (ROADWAY)
CY 19,744.000 $8.000 $10.500 $15.000 $12.250 $5.750
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,009.000 $8.740 $8.000 $15.000 $14.600 $6.000
FURNISHING AND PLACING TOPSOIL (4")
SY 33,822.000 $0.400 $1.250 $1.000 $0.850 $1.300
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 33,822.000 $0.250 $0.160 $0.320 $0.160 $0.150
BROADCAST SEED (TEMP) (WARM)
SY 16,911.000 $1.000 $0.150 $0.320 $0.150 $0.140
BROADCAST SEED (TEMP) (COOL)
SY 16,911.000 $1.000 $0.150 $0.320 $0.150 $0.140
VEGETATIVE WATERING
MG 1,355.000 $10.000 $13.900 $10.000 $21.000 $27.200
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 38,846.000 $15.640 $10.150 $14.500 $12.780 $16.000
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
CY 3,348.000 $40.000 $51.900 $50.000 $59.300 $48.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 29,736.000 $2.000 $2.000 $3.000 $2.240 $3.800
CEMENT
TON 448.000 $180.000 $183.000 $200.000 $179.250 $170.000
CEMENT TREAT(EXIST MATL)(8")
SY 29,736.000 $3.400 $2.550 $3.250 $2.040 $3.900
CEMENT TREAT (NEW BASE)(10")(DC)
SY 12,056.000 $4.000 $2.900 $3.500 $2.470 $3.700
ASPH (HFRS-2P)
GAL 13,782.000 $3.220 $3.400 $3.500 $3.220 $3.400
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 365.000 $100.000 $135.400 $115.000 $133.000 $106.000
PLANE ASPH CONC PAV (3")
SY 10,376.000 $2.000 $1.600 $2.500 $2.490 $1.900
CEM STABIL BKFL
CY 94.000 $65.000 $63.800 $150.000 $96.000 $185.000
CUT & RESTORING PAV
SY 43.000 $60.000 $65.000 $60.000 $132.000 $100.000
TEMPORARY SPL SHORING
SF 2,712.000 $34.000 $19.050 $45.000 $45.000 $36.000
RIPRAP (CONC)(4 IN)
CY 55.000 $484.310 $422.000 $550.000 $478.000 $520.000
RIPRAP (MOW STRIP)(4 IN)
CY 38.000 $400.000 $414.000 $575.000 $590.000 $520.000
CONC BOX CULV (4 FT X 2 FT)
LF 39.000 $256.950 $444.500 $350.000 $242.000 $375.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 108.000 $460.000 $617.650 $500.000 $596.000 $565.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 32.000 $650.000 $939.400 $850.000 $1,660.000 $560.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 129.000 $730.000 $789.850 $750.000 $619.000 $800.000
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
LF 36.000 $1,080.000 $1,384.800 $1,050.000 $1,615.000 $1,075.000
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
LF 16.000 $600.000 $1,449.750 $800.000 $1,623.000 $550.000
RC PIPE (CL III)(18 IN)
LF 466.000 $56.000 $65.850 $73.000 $63.000 $50.000
RC PIPE (CL III)(24 IN)
LF 90.000 $97.000 $86.350 $90.000 $152.000 $75.000
RC PIPE (CL III)(30 IN)
LF 36.000 $117.000 $120.000 $115.000 $217.000 $110.000
RC PIPE (CL III)(36 IN)
LF 77.000 $138.000 $144.300 $150.000 $272.000 $160.000
WINGWALL (PW - 1) (HW=10 FT)
EA 1.000 $40,290.000 $37,360.000 $38,000.000 $25,700.000 $32,000.000
WINGWALL (PW - 1) (HW=11 FT)
EA 2.000 $30,340.000 $39,440.000 $43,200.000 $28,300.000 $38,000.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $16,750.000 $17,285.000 $17,300.000 $24,200.000 $13,200.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $9,060.000 $17,776.000 $22,600.000 $20,800.000 $19,800.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $21,700.000 $21,775.000 $26,800.000 $21,560.000 $25,300.000
WINGWALL (PW - 1) (HW=8 FT)
EA 1.000 $15,000.000 $22,780.000 $27,700.000 $22,520.000 $22,000.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (P)
EA 6.000 $6,601.620 $7,605.000 $6,000.000 $11,400.000 $3,600.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
EA 2.000 $6,425.000 $6,475.000 $5,700.000 $8,975.000 $5,500.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $6,000.000 $6,638.000 $6,800.000 $9,050.000 $5,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $8,500.000 $7,075.000 $9,200.000 $9,275.000 $7,000.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 1.000 $5,400.000 $7,240.000 $11,700.000 $9,541.000 $6,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 38.000 $900.000 $1,262.000 $1,200.000 $1,087.000 $900.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000 $1,200.000 $1,810.000 $1,500.000 $1,630.000 $1,050.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,600.000 $2,600.000 $1,800.000 $2,717.000 $2,400.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $4,352.000 $6,400.000 $4,300.000 $3,804.000 $5,500.000
CLEAN EXIST CULVERTS
EA 7.000 $1,400.000 $3,200.000 $2,400.000 $2,741.000 $1,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $1,150.000 $4,050.000 $2,500.000 $3,450.000 $5,000.000
REMOV STR (WINGWALL)
EA 14.000 $1,170.000 $4,530.000 $1,700.000 $3,450.000 $700.000
REMOV STR (PIPE)
EA 20.000 $400.000 $775.000 $370.000 $924.000 $300.000
MOBILIZATION
LS 1.000 $373,740.000 $71,353.000 $454,000.000 $386,400.000 $478,500.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $5,000.000 $5,085.000 $5,000.000 $21,520.000 $32,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 400.000 $22.000 $26.650 $32.000 $27.170 $25.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $27.000 $28.750 $34.000 $29.350 $27.000
ROCK FILTER DAMS (REMOVE)
LF 900.000 $8.000 $9.600 $27.000 $9.780 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 500.000 $14.000 $26.650 $24.000 $27.170 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 500.000 $6.000 $12.800 $19.000 $13.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 8,516.000 $3.500 $2.950 $4.500 $2.990 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 8,516.000 $1.000 $0.800 $1.250 $0.820 $0.750
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 210.000 $40.000 $74.000 $18.000 $29.000 $71.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 210.000 $6.500 $20.500 $7.500 $31.000 $10.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 210.000 $5.000 $27.400 $15.000 $23.000 $33.000
CONCRETE GUTTER (MODIFIED)
LF 187.000 $40.000 $33.000 $45.000 $51.300 $50.000
DRIVEWAYS (ACP)
SY 732.000 $51.000 $38.600 $55.000 $57.400 $75.000
DRIVEWAYS (SURF TREAT)
SY 2,519.000 $15.000 $6.800 $35.000 $37.480 $36.000
TURNOUTS (ACP)
SY 164.000 $42.000 $44.500 $42.000 $115.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 18,280.000 $0.250 $0.200 $0.260 $0.160 $0.160
RUMBLE STRIPS (CENTERLINE)
LF 9,130.000 $0.180 $0.260 $0.260 $0.160 $0.160
MTL W-BEAM GD FEN (TIM POST)
LF 275.000 $21.000 $33.000 $46.000 $35.320 $30.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $25.000 $38.350 $48.000 $38.000 $35.000
REMOVE METAL BEAM GUARD FENCE
LF 1,475.000 $2.500 $1.000 $4.500 $4.350 $0.950
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,600.000 $3,515.000 $4,200.000 $3,804.000 $3,280.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $270.000 $319.550 $400.000 $272.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,500.000 $1,918.000 $4,300.000 $450.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $835.000 $1,280.000 $1,600.000 $363.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,500.000 $12,782.000 $11,150.000 $1,650.000 $11,000.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 6.000 $260.000 $271.650 $280.000 $400.000 $250.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 5.000 $500.000 $880.000 $690.000 $850.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 29.000 $450.000 $532.600 $570.000 $520.000 $495.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 22.000 $610.000 $596.500 $690.000 $580.000 $540.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $490.000 $745.650 $650.000 $730.000 $665.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $830.000 $1,172.000 $910.000 $1,100.000 $910.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $689.000 $958.680 $960.000 $908.000 $840.000
REMOVE SM RD SN SUP&AM
EA 71.000 $74.000 $66.000 $110.000 $150.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $28.000 $37.300 $36.000 $22.000 $35.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 14.000 $94.270 $96.000 $100.000 $158.000 $90.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 21,520.000 $0.250 $0.310 $0.350 $0.380 $0.250
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 109.000 $3.000 $4.200 $5.000 $6.530 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,000.000 $0.250 $0.460 $0.450 $0.380 $0.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,613.000 $1.000 $0.600 $1.000 $1.000 $1.090
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 27,035.000 $0.500 $0.480 $0.500 $0.600 $0.340
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 1,150.000 $0.260 $0.500 $0.550 $0.600 $0.340
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 20,005.000 $0.500 $0.460 $0.480 $0.600 $0.340
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 429.000 $12.800 $10.550 $11.000 $15.220 $15.620
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $215.000 $255.000 $250.000 $310.000 $275.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $601.000 $442.000 $500.000 $522.000 $777.000
REFL PAV MRKR TY II-A-A
EA 258.000 $3.000 $4.250 $4.500 $5.430 $7.770
GEOGRID BASE REINFORCEMENT
SY 41,792.000 $3.500 $1.500 $1.500 $1.090 $1.700
SP MIXES SP-C SAC-A PG70-22
TON 8,122.000 $100.000 $112.650 $95.000 $103.000 $115.000
BONDING COURSE
GAL 4,923.000 $3.600 $3.350 $4.500 $5.200 $3.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $5,800.000 $10,000.000 $2,700.000 $18,400.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 80.000 $10.000 $16.000 $15.000 $19.560 $17.760
TMA (STATIONARY)
DAY 165.000 $145.000 $220.000 $150.000 $460.000 $245.000
TMA (MOBILE OPERATION)
DAY 90.000 $240.000 $525.000 $220.000 $780.000 $245.000
Totals: $4,104,531.840 $3,982,426.270 $4,676,427.080 $4,811,504.040 $5,007,236.990